Your Training Partner
Techniques Toolbox
The Pareto of the error codes points to ADR-17. The team reads its rejections one by one and sets aside three out-of-category cases. On the check sheet, the municipal merger has 21 tally marks out of 31.

Dirty 30

Dirty 30 is a method for analysing the causes of the transactions that an IT system rejects. The team picks a single error code, examines cases one after another in the production systems and records the cause of each on a check sheet. Jay Arthur, who named and described the method, places the point where one cause or a few stand out from the tally at around the thirtieth case. From the tally the team derives the requirements that prevent the error.

Goal

Dirty 30 is a cause analysis for transaction errors: the orders, account changes or invoices that a system refuses and drops into a manual correction queue. It establishes why the transactions of one error code fail.

The Pareto chart of the error codes shows which category has the most rejections. It does not show why. Arthur observes that the usual cause analysis fails on these errors because the cause lies in the detail of each transaction. The team opens each rejected transaction with its linked records, agrees on its cause and tallies it on a check sheet. A check sheet is a prepared form. The person recording makes a tally mark on it for each occurrence of a category. In Dirty 30 the categories are the causes.

The technique prepares a decision: which change to the system removes the dominant cause. It delivers the check sheet of causes, the statement of the verified cause, the business requirements that prevent it and the implementation plan.

Usage

When to use it

  • Rejections that feed a manual correction queue: the cost of each correction justifies half a day of analysis per error code.
  • After a Pareto of the error codes: the tallest bar names a symptom. The check sheet gives its cause.
  • After a release to production: the rejections of the new version show which requirements fail.
  • Rejections when data is created, changed or deleted: in these rejections, Arthur finds most causes in requirements that are too strict, too loose or missing.
  • A team spread over several sites: screen sharing replaces the terminal around which Arthur gathers the team.

When not to use it

  • Errors that leave no trace in the systems: there are no cases to read; first count the occurrences at the workstation on a check sheet.
  • An isolated incident of any severity: a single case produces no tally; run a root cause analysis.

Description

The starting conditions

Dirty 30 consumes data that the system already produces. Each rejected transaction carries an error code and stays retrievable with its history: the customer record, the original order, the past changes. Arthur describes the method for IT systems and their transaction rejections only.

Before the analysis, the team quantifies the problem: the number of rejections per month, their rate and the cost of one correction. This number justifies the hours that the analysis asks of the experts. In the case Arthur reports, a mobile operator rejected 17% of its service orders. That came to more than 30'000 errors a month. At USD 12.50 in wages per correction, the queue cost USD 375'000 a month.

One team per error code

The Pareto of the error codes picks out the categories to tackle. In the reported case, six codes out of more than 200 made up more than 80% of the rejections. The number six comes from that case.

The team handles a single code per session. Arthur assembles a separate team for each code because each code needs different experts and hides different causes. He reports that with a single code each team found its causes in one half-day session.

The team brings together the systems analyst, the correction staff and the data entry staff. The analyst knows the requirements and the logic of the application. The correction staff know the errors as they arrive in the queue. The data entry staff know the transaction at its source. One team member can navigate all the systems. A facilitator keeps the check sheet. Arthur reports that it took him a week or more to bring the right people together for each code.

The steps

  1. Pick one error code. The team takes a code from the first bars of the Pareto.
  2. Extract 100 to 200 cases. The analyst draws transactions with this code from the rejection log, each with its identifier. The range of 100 to 200 comes from the review that closes Arthur's section. In the case he reports, the identifier was the phone number. In the operator's case, Arthur prints 50 to 100 examples per code for the session. The surplus makes up for the cases that the team sets aside because they do not belong to the category.
  3. Examine each case in the systems. The team meets in front of a single screen. The person who knows the systems opens the transaction, then the customer record and the other linked records. The team reads this case until it agrees on its cause. Then it moves on to the next one.
  4. Keep the check sheet as the cases go by. The facilitator adds a tally mark on the row of each agreed cause. Arthur does not fix the rows in advance: each new cause adds a row.
  5. Stop when the tally marks gather on one cause or a few. Arthur places this point at around the thirtieth case. He reports that 25 cases were sometimes enough and that other sessions needed 50.
  6. Evaluate the solutions. The team compares the changes to the system or the process that remove the dominant cause.
  7. Write the requirements. The team writes the implementation plan and the business requirements that prevent the error. Arthur gives this an hour at the end of the session. The systems analyst then passes the requirements to the developers.
The Pareto of the error codes points to ADR-17. The team reads its rejections one by one and sets aside three out-of-category cases. On the check sheet, the municipal merger has 21 tally marks out of 31.

When to stop

The number 30 is a rule of thumb. The team can adopt a workable criterion: new cases fall on existing rows and the order of the top rows no longer changes from one series to the next. Two causes can share the top of the tally. Thirty cases are not enough when the top rows still change rank. A cause with 15 tally marks out of 20 does not need ten more cases.

In an invented example, code ADR-17 at a health insurer rejects address changes.

The tally of causes for code ADR-17 after 10, 20 and 31 retained cases. The municipal merger leads from the first ten cases, then its lead grows.
CauseAfter 10 casesAfter 20 casesAfter 31 cases
Municipality name missing from the reference list after a municipal merger61321
Effective date earlier than the last change245
Change entered on the portal and again at the counter123
Apostrophe in the street name refused by the format check112

Verifying the cause as it is counted

Arthur notes one advantage of reading case by case: the team verifies each cause at the moment it counts it. The transaction and the data that explains it are in front of the team. The agreed cause rests on the case data, not on the label of the code.

A fishbone diagram can then group the causes found into families. In Arthur's case, the causes cluster around adding, changing and deleting customer accounts.

From causes to requirements

Arthur reports that the cause lies most often in the requirements. They are too strict, too loose or missing, above all for adding, changing and deleting data. He explains why: most applications assume that they alone create and change their data. In practice, most systems have access paths used to correct data in the database quickly without going through the application. The upstream and downstream systems have their own. The system applies a requirement that assumes perfect data. It then rejects transactions that the business considers valid.

Arthur credits the method with indirect benefits. The analyst sees how their requirements fail in production and writes the next ones accordingly. The user sees up close how the software works and how complex it is.

The reported results

Arthur reports that the changes took four months and two minor releases of the software. He reports that they eliminated the two top service-affecting codes and three of the four codes affecting customer records. According to him, total errors fell by 77% and the rejection rate went from 17% to 3% in six months. He puts the saving at USD 299'426 a month in the case summary and at USD 250'000 a month in the introduction to the book's section.

Pitfalls

Mixing several codes in one session. The tally of a mixed category scatters over too many rows for any one cause to stand out.

Looking for the cause at the category level. A workshop that discusses the error code without opening the transactions falls back into the abstract analysis that the method replaces.

Counting out-of-category cases. An error code sometimes contains misclassified transactions. The team notes them below the total without counting them.

Looking for someone to blame. The systems analyst whose requirements fail sits next to the person who entered the transaction. The sheet counts causes. The facilitator brings the discussion back to the case data when it drifts towards a person.

Stopping at the sheet. The check sheet names the cause. Without a requirement written and passed to the developers, the rejections continue. After the release, Arthur tracks the rejection rate on a run chart and redraws the code Pareto.

AI considerations

A language model prepares the session. It writes the SQL query that extracts the rejections of one code from the log and joins each one to the customer record and the change history. It presents each case on one page. During the session the team then moves less from one system to another. The query joins only the tables that the analyst chose. Yet Arthur traces the rejections to data corrected outside the application. So the person who knows the systems opens them live whenever the page does not explain the rejection.

After the session, the model drafts requirements from the retained causes. The analyst tests each requirement against the cases on the sheet: it must prevent the counted rejections without blocking valid transactions.

The model does not find the cause. Asked about the label of an error code, it returns a list of plausible causes without having read a single case. The method exists to replace that abstract analysis. The team that knows the system and the business decides on the cause in front of the case data.

Rejected transactions contain personal data: name, address, phone number, sometimes health data at an insurer. Health data is sensitive personal data (art. 5 let. c FADP). This data goes to an external AI service only under a data processing agreement (art. 9 FADP). If the provider processes the data outside Switzerland, the data goes only to a country with adequate protection or with sufficient safeguards (art. 16 FADP).

Examples

The deliverable of Dirty 30 is the check sheet of causes for a single error code. At a health insurer, code ADR-17 rejects address changes. In this invented example, the team reads 34 cases and retains 31.

Check sheet of causes for code ADR-17. The three out-of-category cases are noted below the total without being counted.
CauseTallyTotal
Municipality name missing from the reference list after a municipal merger||||| ||||| ||||| ||||| |21
Effective date earlier than the last change|||||5
Change entered on the portal and again at the counter|||3
Apostrophe in the street name refused by the format check||2
Total of retained cases31
Out of category: code assigned in error|||3

The municipal merger has 21 tally marks out of 31. It points to a requirement that is too strict. The check requires the municipality name to appear in the internal reference list. IT updates this list once a year. After each merger, the check rejects the addresses of the new municipality until the update. The revised requirement accepts a municipality missing from the reference list when the postcode is valid. The system then flags the address for review.

Visualisations

The Pareto of the error codes opens the method and picks out the category. The check sheet of causes is its deliverable: one row per cause, one tally mark per case. A fishbone diagram can present the causes found. After the release, a run chart of the rejection rate shows the effect of the revised requirements.

Cost

DimensionLevelJustification
PreparationMediumAccording to Arthur, two to three days to quantify the rejections and draw the code Pareto. A week or more to bring together the experts for each code.
ExecutionLowAccording to Arthur, one half-day session per error code. The team also writes the requirements in that session.
DocumentationLowThe check sheet, the statement of the cause and the requirements written in the session.

Arthur reports that his case cost three days of preparation, six half-day sessions and two minor releases of the software. He counts 4 to 8 hours of analysis per error code. He also writes that a team learns the method in a day or less.

Tooling

A spreadsheet or a sheet of paper is enough for the check sheet. The facilitator keeps it on the shared screen so that the team sees each tally mark as it is added. The QI Macros add-in for Excel contains a check sheet template.

The analyst extracts the cases from the rejection log with an SQL query or an export of the correction queue. The session needs read access to every system that the transaction passes through: the source application, the upstream and downstream systems, the customer record. The code Pareto and the run chart can be drawn in the same spreadsheet.

Sources

  • Jay Arthur, Lean Six Sigma Demystified, 2nd ed., McGraw-Hill, 2011, ch. 6 "Transactional Six Sigma", section "The Dirty 30 Process for Six Sigma Software", pp. 218-227: the name and definition of the method, the seven steps of its review, the make-up of the teams, the mobile operator case and its results.
  • ASQ, "Check Sheet": the definition of the check sheet, which ASQ places among the seven basic quality tools.

Arthur named Dirty 30 and says he developed it over consulting assignments for IT departments. Arthur ran his case himself in 2000. Arthur sells the QI Macros add-in for Excel, which produced the check sheet that illustrates his case.

Desk Check
All techniques
Discovery & Action Dialogue (DAD)