Five modes from left to right: Empathize, Define, Ideate, Prototype, Test. Under each mode sits what it produces: observations and quotes, point of view, selected ideas, low-fidelity prototypes, test results. A return arrow leads from Test to Prototype to refine the solution. Another leads from Test to Define when the problem was badly framed. A third leads from Prototype to Empathize when use brings out a need the team did not know about.

Design thinking

Design thinking is an iterative and non-linear human-centred process. A team uses it to understand its users, challenge its assumptions and redefine the problem. It then imagines solutions that it prototypes and puts in front of users. The PMBOK Guide lists it among the tools and techniques of the Elicit and Analyze Requirements process. The Stanford d.school describes five modes: empathize, define, ideate, prototype and test. A test can send the team back to an earlier mode. In requirements analysis, the team looks for the right problem before it commits to a solution.

Goal

Design thinking is a user-centred process. IDEO describes it as a way of solving complex problems that brings together what people desire, what technology makes feasible and what is viable for the organisation.

In the Scope performance domain, the PMBOK Guide places design thinking among the tools and techniques of the Elicit and Analyze Requirements process. The guide notes that it is commonly used on new product development projects.

The technique addresses a problem the analyst often meets: the sponsor asks for a solution. Nobody has checked that it meets the users' need. Design thinking helps the sponsor decide which problem to solve and which option to develop. One cycle produces:

  • observations and quotes gathered from users;
  • a point of view that frames the problem from one specific user's standpoint;
  • ideas selected for prototyping;
  • low-fidelity prototypes;
  • test results.

Jake Knapp's Design Sprint runs through similar steps in five days. It names a Decider and sets a fixed schedule. It starts from a problem the team already knows how to frame. Design thinking sets neither a duration nor roles.

Usage

When to use it

  • The problem is still vague: understand the users before writing the first requirement.
  • Users and their practices are poorly known: observe and interview them before deciding on their behalf.
  • A new product or service: design the offer from what users do before writing the specification.
  • Several solutions championed internally: prototypes tested with users settle the disagreement.
  • A strong hierarchy: what users do during the test weighs more than the opinion of the most senior person.
  • An agile project: test results feed the user stories in the backlog.
  • Users reachable in their own setting: the team goes to observe them and immerses itself in their situation.

When not to use it

Description

How the process is divided

The Stanford d.school identifies five modes: Empathize, Define, Ideate, Prototype and Test. The Nielsen Norman Group counts six phases because it adds Implement. IDEO describes seven, from "Frame the question" to "Share the story". IDEO adds that this division makes design thinking easier to learn and that practice does not follow a straight line. The activities the PMBOK Guide names overlap with the d.school modes: defining the problem, imagining options, prototyping and testing.

Preparing the cycle

The analyst frames the starting question with the sponsor. IDEO calls its first phase "Frame the question". In that phase the team defines the challenge, often as a "How Might We…?" question. The analyst checks that the question names a user's situation rather than a solution.

The team recruits the users for the interviews and tests. The d.school advises including extreme users. Their amplified needs bring out what average users do not show. The team secures access to the users' setting and their consent to recordings and photos.

The team assigns the roles for the test session. With the d.school's Scenes/Props/Roles card, it decides who recruits and hosts the users, who operates the prototype during the test and who observes and takes notes. Finally, the analyst decides where the results go and who translates them into requirements.

The modes and what they produce

Design thinking assigns its techniques to each of the modes. Each mode takes the result of the previous one and hands its own to the next.

ModeThe teamIt producesTechniques
Empathizeobserves the users, interviews them and experiences what they experienceobservations and quotesInterviews, observation, empathy map, customer journey map
Definesorts its observations into needs and insights, frames a point of view and then breaks it into "How Might We" questionspoint of viewAffinity map, personas, problem shaping and reframing, How Might We
Ideategenerates many ideas, then picks severalselected ideasBrainstorming, creative thinking, dot voting
Prototypemakes ideas tangible at low cost and isolates one variable per prototypelow-fidelity prototypesPrototyping, paper prototyping, throw-away prototyping, storyboarding
Testhas users try the prototypes in their own contexttest resultsObservation, paper prototyping
What the team does in each mode, what it gets out of it and the techniques that support it.

Empathize: understanding the users

The Empathize mode grounds the whole process. The d.school points out that the problems to solve are rarely the team's own. They belong to specific users. The team observes these users and their behaviour in the context of their lives. It talks to them in planned interviews or in short encounters on site. The d.school advises interviewing in pairs: one person talks while the other takes notes. The team also immerses itself in the users' experience.

The team notes quotes, behaviours and anything that betrays what the person thinks and feels. It also looks for needs the user is not aware of. The empathy map sorts what a person says, thinks, does and feels. The customer journey map breaks a customer's path into stages. The d.school uses it for empathy and for communicating results.

Define: framing the point of view

The Define mode turns observations into needs and insights. The team uses it to scope a challenge that matters to the user. It starts by sharing stories from the field. Each member tells what they saw and heard. The others write each quote, surprise or striking detail on its own sticky note. The team groups and regroups the notes on the board until themes emerge. The affinity map describes this sorting.

From these themes, the team draws a point-of-view statement (POV). It builds the statement from the d.school prompts: "We met…", "We were surprised to notice…", "We wonder if this means…", "It would be game-changing to…". The statement anchors the rest of the project. According to the d.school, a good statement makes sense without context. It concerns a specific user rather than a demographic segment. It points to a direction without imposing a solution.

The d.school asks the team to reframe the problem in the light of what it learned in the Empathize mode. When the statement repeats the problem as the sponsor posed it, problem reframing restates it from another actor's standpoint or around another goal. Personas sum up the users the team met as archetypes.

Finally, the team breaks the point of view into "How Might We…" questions. Each question opens the solution space without naming a solution. Ideation starts from these questions.

Ideate: widen, then choose

The Ideate mode produces many and varied solutions. The d.school asks the team to widen the range of solutions. Ideation alternates between two phases. During generation nobody judges, because an outlandish idea sometimes leads to the most original concept. During selection the team narrows down. Brainstorming and creative thinking support generation.

According to the d.school, selection is the hard part. The team avoids safe choices and carries several ideas into prototyping to keep the solutions varied. The d.school proposes sticky-note voting. It works like dot voting: each member has three votes. With the four categories, the team picks one or two ideas in each: the rational choice, the idea most likely to delight, the darling and the long shot. Bingo is the d.school's third selection technique: the team uses it to pick one or two ideas that inspire a physical prototype, a digital prototype and an experience prototype.

Prototype: making the idea tangible

A prototype can take any physical form: a wall of sticky notes, a role-play, an object. Early on, the team keeps its prototypes cheap and low-fidelity so that it learns fast. By watching the user handle the prototype, the team also learns something about that user.

The d.school recommends isolating one variable. Each prototype tests one property of the solution instead of the whole solution. Several prototypes that differ only in that property let the user compare and choose. To find out how heavy a device should be, the team makes mock-ups of different weights without making them work.

When the team is split between several options, it prototypes each one and has users evaluate them to decide. The d.school limits this set to three to five prototypes. Prototyping describes the kinds of prototype and their media. Paper prototyping, throw-away prototyping and storyboarding produce the low-fidelity prototypes of this mode.

Test: learning from the user

The Test mode places the low-fidelity prototypes in the user's everyday context. The team gathers feedback there, refines its solutions and keeps learning about its users. The d.school sums up the expected attitude: "Prototype as if you know you're right, but test as if you know you're wrong."

The team runs the session in this order:

  1. It puts the prototype in the user's hands and gives only the context needed. It shows without explaining.
  2. It asks the user to think aloud while acting.
  3. It watches without correcting the user, including when the user misuses the prototype.
  4. It ends with follow-up questions: "Show me why this would (not) work for you." According to the d.school, this follow-up is often the most valuable part of the test.

Throughout the session, the team answers the user's questions with questions: "What do you think this button does?"

The test teaches the team something about the solution, about the user and sometimes about the problem.

The loop between the modes

The PMBOK Guide calls design thinking iterative and non-linear. According to the d.school, the test shapes the next versions of the prototype and sometimes forces the team to start from scratch. IDEO compares its phases to the ingredients of a recipe: they give structure at the start, then the team learns from experience how to move between them.

A test result sends the team back to the Prototype mode when the solution needs refining. When the problem was badly framed, it sends the team back to the Define mode to rewrite its point of view. A prototype sends the team back to the Empathize mode when its use brings out a need the team did not know about. IDEO describes a rhythm that repeats from one phase to the next: create choices, then make choices.

From test result to requirement

The Nielsen Norman Group considers implementation the most important phase and the one most often forgotten. The PMBOK Guide places the technique in a process that produces the requirements documentation. The analyst therefore translates the results of the cycle into requirements.

The point of view gives the context of an epic or a business requirement. The validated prototype yields the user stories and their acceptance criteria. The analyst draws the examples for these criteria from what users did during the test. In an adaptive environment, these user stories go into the backlog, where the team prioritises them.

Pitfalls

The team starts from its own assumptions

A team that knows its domain is tempted to start with ideation. It then designs for the user it imagines. The d.school asks for a beginner's mindset. Each person's experience carries assumptions and preconceptions that limit empathy. The team sets aside what it thinks it knows and goes to see the users.

The point of view that contains the solution

"Commuters need a mobile app" names a solution. Ideation can then only produce variations of it. The team goes back to the need: "A commuter who buys her ticket on the platform needs to know within ten seconds which fare covers her route." The "How Might We" questions drawn from this statement allow for an app, a ticket machine or a season ticket.

The segment in place of the user

"Urban dwellers aged 25 to 40" describes a demographic segment. A statement about a segment carries no insight, because nobody was ever surprised by an average. The statement names a person the team met in the Empathize mode.

Judging while ideas are generated

When someone dismisses an idea the moment it comes out, the others hold back their own. The d.school asks the team to ban evaluation during generation. The facilitator opens selection only once generation is closed.

The over-finished prototype

A team that has spent a week on a prototype defends it instead of testing it. A cardboard or paper prototype goes in the bin without regret. The team keeps to low fidelity as long as the question concerns the need rather than the detail.

The test that tries to persuade

A team that presents its prototype and praises its merits gets polite approval instead of honest reactions. The team shows without commenting and looks for what fails.

The cycle that stops at the prototype

A workshop ends with a wall of sticky notes and an applauded prototype. Nothing reaches the requirements documentation or the backlog because nobody was given that task at the start.

AI considerations

A language model helps sort the notes of the Define mode. The team gives it the transcribed quotes and observations. It proposes groupings by theme and flags the notes that fit no group. The team checks each group against what it saw in the field.

The model drafts variants of a point-of-view statement and "How Might We" questions from several angles. In ideation, it lengthens the list once the group has produced its own. Its suggestions then do not steer those of the participants. It also produces low-fidelity screens or storyboard frames in a few minutes for prototyping.

The model does not replace the Empathize mode. That mode looks for the insight that surprises the team in a real person. A user simulated by a model reproduces what its training data say about an average group.

Interview recordings and field photos are personal data under the Federal Act on Data Protection (FADP). Before the team feeds this content into an external AI service, it checks that the people agreed and that the organisation authorises the service. It anonymises the transcripts.

Examples

The record of one cycle shows what each mode passes to the next and where the test sends the team back. This record follows a cycle on online registration run by the after-school care service of a municipality in the canton of Vaud.

ModeWhat the team produced
EmpathizeEight interviews with parents and two mornings of observation at the counter. Six of the eight parents work irregular hours. Quote: "I never know if there's still a place on Wednesday."
DefinePoint of view: a nurse who works irregular hours plans her shifts a month ahead. The municipality confirms her child's place three weeks after the application. It would be game-changing to know which places are still open at the time of the application.
Question: "How might we show which places are still open before the parent chooses their days?"
Ideate42 ideas. Selected with the four categories: the calendar of places still open (rational choice), immediate confirmation with a waiting list (most likely to delight), the SMS when a place opens up (darling), swapping days between families (long shot).
PrototypeA one-month paper calendar with a box per half-day. Variable tested: showing the places still open before the days are chosen. Two versions: with and without the display.
Second prototype: a team member sends the SMS by hand when a place opens up.
TestFive parents. With the display, four choose their days in under two minutes. Without it, only one manages. Two of the five parents read the SMS early enough to book the freed place. Three say their difficulty is changing days in the middle of the month, which the form does not allow.
Back to DefineNew point of view: the same nurse receives her shift roster on the 20th of the month and has to change the care days for the following month. It would be game-changing to change her days without submitting a new application.
Record of a design thinking cycle on registration for after-school care. The test validates the display of places still open and sends the team back to the Define mode.

The test validated the display of places and corrected the point of view. The calendar goes into the backlog as a user story: "As a parent, I want to see which places are still open for each half-day before choosing my days, so that I can fit childcare around my working hours." The SMS is on hold: only two of the five parents read it in time. The next cycle prototypes changing days.

Visualisations

The diagram shows the modes of design thinking, what each one produces and where the test and prototyping send the team back.

Cost

DimensionLevelJustification
PreparationMediumFraming the starting question with the sponsor, recruiting users for interviews and tests and getting access to their setting.
ExecutionHighThe cycle in the Vaud municipality includes eight interviews, two mornings of observation, an ideation workshop and five tests. The team repeats this work in every cycle.
DocumentationMediumPhotographing the walls, recording the point of view and the test results, then translating them into requirements or user stories.

Tools

In the room, the team works with sticky notes, markers and large walls or boards. Paper, cardboard and scissors are enough for the first prototypes. With people's consent, a phone records the interviews. It also photographs the walls.

Remotely, a digital whiteboard such as Miro or Mural replaces the wall. A mock-up tool such as Figma or Balsamiq produces clickable low-fidelity screens. A video call is enough to test a screen with a user. It does not show the user's setting. The results end up in the tool where the team keeps its requirements or its backlog (Jira, Azure DevOps).

Sources

  • PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 8th ed., §2.2.2.2 Elicit and Analyze Requirements (Figure 2-15) and the Design thinking entry in Section 5 Tools and Techniques: the definition, the place of design thinking among the tools of the process, the requirements documentation and the backlog user stories in an adaptive environment.
  • Stanford d.school, Design Thinking Bootleg, 2018: the five modes and the test that sends the team back to an earlier mode (cards i to v), the beginner's mindset (card 1), interviewing in pairs (card 4), extreme users (card 5), sharing stories from the field (card 6), the customer journey map (card 7), the point-of-view statement (card 11), How Might We questions (card 13), selecting ideas (card 17), the roles in the test session (card 21), testing with users (card 22), the prototype that settles a disagreement (card 23) and the isolated variable (card 24).
  • IDEO, Design Thinking: the definition and the three criteria of desirability, feasibility and viability. IDEO, The design thinking process: the seven phases, the rhythm that creates choices and then makes them, the comparison with a recipe.
  • Sarah Gibbons, Design Thinking 101, Nielsen Norman Group, 2016: the six phases and implementation as the most often forgotten phase.
  • Tim Brown, "Design Thinking", Harvard Business Review, June 2008.
Design StoryBoards
All techniques
Desk Check