Design StoryBoards
Design StoryBoards is one of the Liberating Structures. It has a team design a meeting before the meeting takes place. A design team sets the purpose of the meeting. For each segment, it chooses the interaction structure that serves this purpose and a backup structure. It records its choices in a storyboard. In this structure, the storyboard is an agenda table. Each row describes a segment: its purpose, its structure, its invitation, its duration and the person who facilitates it. Storyboarding is another technique: it draws a usage scenario as a sequence of panels. Henri Lipmanowicz and Keith McCandless describe Design StoryBoards in The Surprising Power of Liberating Structures (2013). The book publishes a Basic version and an Advanced version. The authors' site publishes a third.
Goal
Design StoryBoards has a team design a meeting in writing before it starts. The design team starts from the purpose of the meeting and pairs each segment with a microstructure that serves this purpose. The authors use the word microstructure for the form that a group interaction takes. The book counts the presentation, the status report, the managed discussion, the open discussion and the brainstorm among the conventional microstructures. The Liberating Structures form the second family.
According to the book, the structure can eliminate the most common causes of dysfunctional meetings: an unclear purpose or none in common, time wasters, restrictive participation, absent voices, groupthink and frustrated participants. The purpose becomes clearer as the team matches it with microstructures. The design shows who needs to take part for the implementation to succeed. Assessing the usual practice shows its weaknesses and helps the group move beyond it. A visible design helps everyone find their role. The design draws on the group's explicit, tacit and latent knowledge.
The book proposes replacing agendas with storyboards. An agenda lists topics. A storyboard sets the purpose of each segment and the structure that will achieve it. The authors' site links Design StoryBoards to the first principle of the Liberating Structures: "Include and Unleash Everyone".
The session produces a filled-in storyboard and the questions that will evaluate the design. The site version adds the logistics: the invitation list, one host per structure and one structuring invitation per structure.
You'll find the other structures of the repertoire under Liberating Structures.
Usage
When to use it
- Recurring meeting or course that goes round in circles: the storyboard replaces the list of topics with a purpose and a structure per segment.
- Workshop with a large mixed group: one structure per segment gets everyone working even with seventy people (the book recounts one such session).
- Preparing an elicitation workshop: the storyboard sets the structure, its backup and the facilitator for each segment.
- String of structures already sketched: the storyboard sets the invitation, the host and the duration for each structure.
- Co-facilitation: the authors' site suggests the structure to help cohosts prepare to lead a meeting together.
- Transformation initiative over several months: the Advanced version designs and tests one step after another.
- Product or service to improve with its users: the users design the storyboard in place of a focus group.
- Line manager on the design team: in 1-2-All, each person notes their ideas alone before the manager speaks.
- Distributed team: according to the authors' site, the structure works online without adaptation.
When not to use it
- Announcing a decision already taken: there is no interaction to design. An announcement followed by questions is enough.
- Team that has never used a Liberating Structure: the storyboard combines structures the team knows. The book moves from one or two structures to strings and from strings to storyboards. 1-2-4-All opens the way to the other structures.
Description
The storyboard
The headings of the storyboard vary from one example in the book to another. All of them carry the purpose of the segment, the chosen structure and its duration.
| Storyboard in the book | Headings |
|---|---|
| Sample "Launching an Initiative" (Field Guide, Basic version) | Agenda Item · Goal · LS Micro-Structure · Why this LS? · Steps / Timing · Facilitator / Participants |
| Leadership team retreat (Chapter 7) | Time & Topic · Goal · LS · Why this method? · Steps / Timing |
| Child-welfare workshop (Part Three) | Notice (key insight) · Time · Intention · Method · Activity |
The book distinguishes two levels of detail. A simple agenda sets the structures, the questions that launch each one, their duration and notes on the transitions. For each segment, a detailed storyboard defines the structuring invitation, the space, the materials, the participation, the group configuration, the facilitation and the time.
The "Why this LS?" column makes the team justify each choice. The book suggests anchoring each element of the storyboard with the Nine Whys question: "Why is this activity or element important to you? What does it add to the flow of exchanges among participants?"
The elements of the structure
The authors describe each Liberating Structure in terms of five design elements: the structuring invitation, space and materials, participation distribution, group configuration and the sequence of steps with their timing. The book calls these elements "structural elements". The sequence of steps changes from one version to another.
Structuring invitation. The facilitator invites a design team to plan how the participants will interact to achieve their purpose. The plan is detailed and includes visual cues. In the Basic version, this team is a representative subset of the group that will hold the meeting.
Space and materials. The team works at an open wall covered with paper or flip-chart sheets. It uses Post-its or the Liberating Structures playing cards and a blank storyboard.
Participation distribution. Each member of the design team has the same opportunity to contribute.
Group configuration. The team works in 1-2-All or 1-All in rapid cycles at each step. In 1-2-All, each person first thinks alone and then talks it over in a pair. The whole team then pools the ideas. In 1-All, the team pools the ideas straight after the individual reflection. The book asks the team to work at least in pairs.
The published versions
The book publishes two versions. The authors' site publishes a third under the name "Design Storyboards".
| Item | Basic (book) | Advanced (book) | Authors' site |
|---|---|---|---|
| What the team designs | The first step of a meeting | A transformation initiative step by step | The whole agenda of a meeting and then its logistics |
| Announced duration | 25 to 70 min | 18 hours to days or weeks | About 40 to 75 min |
| Total of the timed steps | 27 to 70 min | At least 19 hours | 40 to 76 min |
| Steps | 9 | 13 | An introduction followed by 6 design steps and 4 logistics steps |
| Configuration | 1-2-All or 1-All | 1-2-All or 1-All | 1-2-All |
| Design team | Representative subset of the group. At least two people | All relevant stakeholders. A core and a periphery | One person at minimum |
| Aids for choosing structures | Liberating Structures playing cards | Liberating Structures playing cards | LS Selection Matchmaker and LS Design Cards |
| Online | Not covered | Not covered | Without adaptation |
| Authors credited | Lipmanowicz and McCandless | Lipmanowicz and McCandless | Lipmanowicz, Nancy White and McCandless |
The scope of the design work decides the version. For a meeting whose whole agenda the team can plan, the site version is enough. For a meeting where only the first step is clear, the Basic version fits. A programme of several weeks or months calls for the Advanced version.
The Basic version in the book
The Basic version designs one step: a microstructure and its backup. If the purpose calls for several steps, the team moves on to the Advanced version.
Clarify the purpose (2 to 5 min). The team says why working together matters. Nine Whys helps if the purpose stays vague.
Assess the usual practice (5 to 10 min). The team describes the microstructure it would normally use for this session and who would attend. It assesses where this practice achieves the purpose and where it fails.
Strengthen the purpose (2 to 5 min). The team re-examines the purpose statement in the light of this assessment.
Decide who participates (2 to 5 min). The team re-examines who needs to take part in the meeting or be involved in it.
List the possible microstructures (5 to 10 min). The team looks for conventional microstructures and Liberating Structures that could achieve the purpose. It asks whether one step is enough. If not, it sets the purpose of the first step and continues with that step only.
Choose a structure and a backup (2 to 10 min). The team picks the microstructure best suited to the purpose and a backup structure.
Decide who is invited and who facilitates and then fill in the storyboard (2 to 10 min). The team enters all its decisions in the blank storyboard.
Set the evaluation (2 to 5 min). The team chooses the questions and the process that will evaluate the design. The book suggests: "Did the design achieve desired outcomes? Did the group work together in a productive way? Does something new seem possible now?" The team can run this debrief with What, So What, Now What?
Prepare the Advanced version (5 to 10 min). If the meeting calls for several steps, the team arranges a session in the Advanced version.
The Advanced version in the book
The Advanced version designs a transformation or innovation initiative. It also avoids two traps specific to initiatives: resistance to change and a heavy implementation for a small impact. A complete design chains Basic designs over time. Small design cycles run inside larger ones. The design team can grow as the initiative proceeds.
Form the design team (1 to 3 h). It brings together all relevant stakeholders. Its composition can change along the way.
Clarify the overall purpose (1 to 6 h). The team uses Nine Whys or a more elaborate microstructure.
Describe the users' current experience (6 h to days or weeks). The team describes in detail what happens when people use the product, service or practice to be transformed. Simple Ethnography can supply the observations.
Assess the current practice (3 h to days). The team starts from the users' experience to judge where the practice achieves the purpose and where it fails.
Strengthen the purpose (1 to 6 h).
Define the core and the periphery (1 to 3 h). The team decides who designs. It also decides which people on the periphery vet the design or test it in the field.
Outline possible microstructures (3 h to days).
Break up the outline (1 to 6 h). The team breaks the initiative into steps it can design and run separately.
Design one step (1 to 6 h). The team chooses a structure and a backup for the step and then moves on to the next.
Decide on testing (1 to 6 h). The team judges whether testing or vetting the design is feasible or desirable. It plans tests in waves and in different configurations.
Implement the first step. The team tests it first in a simulated or field setting and then in more extreme conditions.
Evaluate. The team evaluates the first step and then the later ones. It evaluates the overall design with What, So What, Now What?
Repeat the cycle for the next step.
The version on the authors' site
This version designs the whole agenda in one session and then its logistics. The facilitator opens with the invitation (1 min): "We've all sat through a meeting and then wondered, why did that happen? We are going to design a new, wildly successful kind of meeting based on LS."
Part 1: design the storyboard.
Identify the purpose (2 to 10 min) with Nine Whys or another structure.
Identify the stakeholders (2 to 5 min). The team draws up the most diverse list it can of the people with a stake in the topic.
List the first steps (3 to 5 min). Each person lists the first steps that would lead to the purpose and shares them with a partner.
Share the first steps (3 to 5 min). In plenary, a few participants name a first step that struck them. The team picks one.
Choose the first structure (10 min). The facilitator hands out the Selection Matchmaker and blank storyboards. In 1-2-All, the participants choose a structure and a backup for the first step. The team writes this choice on the shared storyboard.
Complete the agenda (5 to 10 min). The participants choose a structure for each step and say how it serves the purpose.
Part 2: logistics.
Finalise the invitees (2 to 10 min). The team settles the invitation list and one host per structure. The hosts plan the timing and the roles together.
Draft the structuring invitations (5 min). The team writes one invitation per structure on the shared storyboard.
Plan the evaluation (2 to 5 min). The participants set the questions and the process that will evaluate the meeting design.
Plan the next steps (5 to 10 min). The team schedules the follow-up meetings.
An optional debrief with What, So What, Now What? closes the session.
Composing: the questions of Chapter 7
Chapter 7 describes composing an agenda or a storyboard in two phases. The preparation clarifies the purpose by asking "why" again and again until the team can go no deeper. The book adds: "What will be different after this experience? What should we start doing and what should we stop doing?"
The team then asks these questions for each challenge between the current situation and the desired result:
- What Liberating Structure fits this challenge?
- What insights or outcomes may emerge from this activity?
- What is made possible now?
- What next step or activity can follow to build momentum, breadth and depth among group members?
Before the meeting, the team tries out an invitation with a design partner or a few future participants. A composition is modular: when an activity does not produce the intended result, the facilitator improvises with another structure.
Design StoryBoards at the end of a string
Chapter 6 ends several strings with Design StoryBoards.
| String in the book | What the earlier structures produce | What Design StoryBoards does with it |
|---|---|---|
| Nine Whys → Improv Prototyping → Design StoryBoards | Nine Whys clarifies the purpose of the shared work. Improv Prototyping brings out the difficulties this purpose raises and the solutions that diverse participation offers. | The storyboard assembles the pieces for what comes next. |
| Discovery & Action Dialogue → 1-2-4-All → Design StoryBoards | A series of Discovery & Action Dialogues brings out hidden solutions to chronic problems. 1-2-4-All reviews the successes to draw higher-level solutions from them. | The storyboard sketches the coordination between groups or units. |
| Simple Ethnography → What, So What, Now What? → Design StoryBoards | Simple Ethnography supplies observations. What, So What, Now What? reviews the prototyping opportunities that these observations reveal. | The storyboard plans the field tests. |
The traps
A rushed design is paid for in the meeting. The book says so: a good design reduces wasted meeting time by much more than it took to create it. A bad design generates frustration.
A complete design from the start stalls the team. The Basic version designs only the first step. The Advanced version breaks the initiative into independent steps. When the team cannot find a first step, it breaks the work into smaller steps until a structure fits one of them.
A structure without a backup leaves the facilitator stranded when it fails. A design makes it possible to improvise: the facilitator switches to the backup (or to the backup's backup).
Absent users leave the design without an anchor. The Advanced version reminds the team: "Don't forget to include users!" It calls for an ambitious design anchored in research on the users' experience.
Premature action skips the evaluation. The Advanced version asks the team to resist the urge for action so that it can assess and adjust the storyboard.
A copied storyboard ignores the context. Each published storyboard fits a local context and the needs of its users.
A forgotten debrief keeps the team from learning from its design. The team debriefs each design with What, So What, Now What?
AI considerations
A language model helps prepare the design session. The team gives it the purpose of the meeting, the size of the group and the time available. Like the Selection Matchmaker, the model proposes a few candidate structures for each segment and their backups. The team checks each proposal on the structure's page. A model sometimes confuses Altshuller's TRIZ method with the TRIZ structure of the Liberating Structures. The authors' site calls it Creative Destruction and keeps TRIZ as a second name.
The model writes a first draft of the structuring invitations. It flags the segments that lack a backup, a host or an invitation. It spots structure names that are missing from the authors' repertoire. It transcribes a photo of a wall of Post-its into a table.
The team itself assesses the usual practice and chooses the invitees and the hosts. These decisions require knowing the people and the history of the group. The storyboard names people. The team replaces the names with roles before it hands the storyboard to an external AI service.
Examples
A design team used the site version to prepare the kick-off workshop of a project for submitting building permit applications online.
| Segment and duration | Purpose | Structure and backup | Structuring invitation | Host |
|---|---|---|---|---|
| 1. Opening (25 min) | Each person says what they bring to the project and what they expect from it. | Impromptu Networking Backup: 1-2-4-All | "What challenge do you bring to this project? What do you hope to get from the group and give to it?" | Project manager |
| 2. Purpose (30 min) | Say why online submission matters to each person. | Nine Whys Backup: 1-2-4-All | "What do you do when you work on a building permit application? Make a short list of activities." | Business analyst |
| 3. First actions (15 min) | Choose the actions to launch within the month. | 1-2-4-All Backup: 15% Solutions | "What action could we launch within the month to test online submission with real applicants?" | Business analyst and an invited architect |
| 4. Closing (5 min) | Announce the follow-up meetings. | Announcement (conventional microstructure) | None | Project manager |
| Evaluation: has the group formulated a shared purpose? Does each chosen action have an owner and a date? | ||||
The book judges 1-2-4-All usable at any time and by any group. That is why it serves twice as a backup. The closing stays an announcement because the group decides nothing in it.
Visualisations
A diagram shows the design cycle of the Basic version with the book's durations. The headings of the published storyboards, the three versions, the Chapter 6 strings and the example storyboard fit in rows and columns.
Cost
| Phase | Level | Rationale |
|---|---|---|
| Preparation | Low | Bring together a design team of at least two people for the book's Basic version. The site version makes do with one person. Prepare a wall, Post-its and a blank storyboard. |
| Execution | Medium (Basic, site) · High (Advanced) | 25 to 70 minutes for the book's Basic version. About 40 to 75 minutes for the site version. 18 hours to weeks for the Advanced version. |
| Documentation | Low | The filled-in storyboard and the evaluation questions. The site version adds the invitations and the hosts. |
Tooling
Face to face, the team works standing at the paper wall. The Post-its carry the candidate structures. The team moves them around until the string holds. The Liberating Structures playing cards and the site's LS Design Cards help the team choose and string the structures. The site offers a storyboard template and the LS Selection Matchmaker. The Matchmaker links objectives to the structures that serve them.
The book recommends icons and sketches so that the team reaches a shared understanding quickly. It suggests a pie chart to balance the goals and the flow of a design. For an initiative, it suggests bringing in an illustrator.
Online, a spreadsheet or a table in a shared document is enough, since the storyboard is a table. A digital whiteboard such as Miro or Mural holds the virtual Post-its of the candidate structures.
Sources
Henri Lipmanowicz and Keith McCandless created Design StoryBoards. The authors' site also credits Nancy White among the authors of the structure.
- Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the Basic and Advanced versions with their steps, durations, tips and variations (Field Guide, Part Four); the conventional microstructures (Chapter 2); storyboards in place of agendas (Chapter 5); the strings that end with Design StoryBoards (Chapter 6); the published storyboards and the composing questions (Chapter 7); the child-welfare workshop (Part Three).
- Design Storyboards, Liberating Structures: the current version with its invitation, its two parts, its durations, the minimum group size and online facilitation.
- LS Selection Matchmaker, Liberating Structures: the tool that links objectives to structures.