Your Training Partner
Techniques Toolbox
A cube seen from a corner. The top face shows Environment and its perspectives Harmony and Proficiency. The left face shows Work Climate and its perspectives Collective, Individual and Hierarchy. The right face shows Work Style and its perspectives Doing, Thinking and Timing.

Culture Cube

The Culture Cube is a group exercise that describes the current culture of a team or an organisation. It splits culture into three dimensions: Environment, Work Climate and Work Style. Each dimension carries two or three perspectives. The cube holds eight. A session brings together 3 to 10 people for 30 to 120 minutes. It produces a dated baseline against which the team later measures how the culture evolves. George W. Anderson describes the exercise in Design Thinking for Tech (2023).

Goal

The Culture Cube sets the starting point for any attempt to change a team's culture. Anderson holds that nobody changes a culture by "changing culture". Culture evolves one person and one behaviour at a time. He proposes two parallel moves. The first draws on the useful aspects of the current culture. The second shapes the culture over time: it encourages some behaviours and discourages others. The cube serves the first move: it describes the current culture. The second move reuses its three dimensions to anticipate how the current culture will react.

The exercise produces a baseline. The group sorts what it saw and heard on a given date into the eight perspectives. Anderson sees this baseline as the reference for later measuring how the culture evolves. He describes the Culture Snail in the same chapter and pairs it with the cube. The Snail traces the organisation's recent history. The cube describes its current state.

Usage

When to use it

  • Before an initiative that touches culture: the baseline sets the starting point that the next measurement will compare against.
  • Joining a team or taking over a project: the cube shows how the team works before anyone proposes a change.
  • A project that brings IT and the business together: describe the culture on each side before the launch.
  • A debate about "the culture" that goes round in circles: the eight perspectives give the group precise things to name.
  • A distributed team: a virtual whiteboard holds the three dimensions and the observations.

When not to use it

  • Putting a figure on the culture of a large organisation: the cube gives no scale; use a survey or questionnaire.
  • Nobody speaks openly in a group: even with no manager in the room, the session collects only platitudes; hold individual interviews.

Description

The model

Anderson condenses culture into a cube of three dimensions that each ask one question.

Environment

  • Harmony
  • Proficiency

Work Climate

  • Collective
  • Individual
  • Hierarchy

Work Style

  • Doing
  • Thinking
  • Timing
Anderson's Culture Cube. Each face carries one dimension and its perspectives: Environment on top, Work Climate on the left, Work Style on the right.
The dimensions and perspectives of the Culture Cube as Anderson defines them.
DimensionQuestionPerspectiveDefinition
EnvironmentHow do people see their workplace as a whole?HarmonyThe ability to work together and maintain effective relationships at work.
ProficiencyThe desire to keep improving at something that matters and therefore has meaning (Pink, 2009).
Work ClimateHow do people work together and how do they relate to one another?CollectiveThe extent to which the team works effectively together, values people or the work and shares a common idea of goals and success.
IndividualWhat each member brings to the team: background, experience, biases, values, respect, initiative, ways of leading and following, empathy, conflict management.
HierarchyThe "vertical differences between team members" within each team and across the whole organisation (Greer et al., 2018).
Work StyleHow and when do people get the work done?DoingHow and why the team executes the work and how far that work is structured and governed.
ThinkingThe planning done before the work is executed.
TimingWhen the work is executed.

Before the session: look and listen

To assess a team's culture, Anderson advises starting by looking around. He asks these questions:

  • What do people do? How do they behave?
  • Which simple rules and guiding principles does the team follow by default, often without writing them down?
  • Which behaviours does the team tolerate? Which does it refuse?
  • What does it prioritise? What does it value?
  • How does it cope with hard tasks?

Anderson also asks the reader to listen to what others say about the team. He includes both unsolicited and solicited feedback. In his view, this feedback gives a picture of the team at one point in time.

The steps

The book sets the number of participants, the duration, what to observe and the expected result. The five-step session plan adds nothing beyond these. It makes a facilitator responsible for timekeeping and for the grid of the eight perspectives.

  1. Gather the group. The facilitator gathers 3 to 10 people who know the team from the inside and plans 30 to 120 minutes.
  2. Bring the observations. Each participant brings what they saw and heard. Anderson's questions guide what to look at. Before the session, the facilitator asks the departments that receive the team's work what they say about it. The facilitator brings this feedback to the session.
  3. Go through the dimensions. The group takes the three dimensions in the book's order: Environment, Work Climate, Work Style. The facilitator reads out the dimension's question and then the definition of each perspective.
  4. Record the observations under each perspective. The group writes down what it observes: a behaviour, a habit, a sentence someone heard.
  5. Date and keep the result. The document becomes the baseline. Alongside the date, the group records who took part and who has joined or left the team since the last baseline.

Measuring change

A few months later, a team can reuse the same grid and the same questions to compare the observations perspective by perspective.

Anderson points out that culture moves slowly. In his view, each arrival and each departure makes a small change to the environment of the whole organisation, to the climate of each team and to the work styles within and between teams. The group therefore matches each difference against the arrivals and departures between the two dates.

The pitfalls

These pitfalls come from facilitation practice.

Recording judgements instead of observations. "Weak Collective" cannot be compared at the next session. "Blocked tickets sit three days without a reply" can.

Profiling people. The Individual perspective covers what members bring to the team. A list of faults by name turns it into a file on employees. Art. 328b CO limits the data that an employer processes about an employee to the employee's suitability for the job and the performance of the employment contract. The group describes the team without naming anyone. An observation that reveals a breach of a person's rights or safety leaves the session. The facilitator passes it on to human resources.

Talking about the hierarchy in front of it. A manager in the room curbs what people say about the Hierarchy perspective. The manager leaves the room while the group discusses Hierarchy. The facilitator can also collect this perspective in interviews.

Keeping to the team's view of itself. A session without outside feedback describes the image the team has of itself.

Arguing over the right box. Harmony and Collective overlap. One observation can belong to both. The group files it under one perspective and moves on to the next. The debate over the box eats up the session.

Mistaking the baseline for a change plan. The baseline describes the starting point. The team then chooses the behaviours to encourage in Anderson's second move.

AI considerations

Before the session, a language model sorts written feedback under the eight perspectives. This feedback can be comments from an internal survey, retrospective notes or messages from other departments. The group starts from this first sort and corrects it. The model files the same comment under Harmony one time and under Collective the next, because the two definitions overlap.

A model also rewords Anderson's questions and definitions in the team's vocabulary. "When is the work executed?" becomes "At what point in the sprint do you deliver?"

After the session, a multimodal model transcribes the whiteboard photos into a dated document. At the next session, it lines up the two baselines perspective by perspective and flags the differences. Only the group judges what these differences say about the culture. The model has seen neither the team nor its meetings. A culture score computed by a model invents a scale that the book does not have.

Feedback and notes often name colleagues. That makes them personal data (Art. 5 let. a FADP). An organisation that gives these notes to an external AI service assigns their processing to a processor. Art. 9 FADP requires a contract for this. The service may then process the data only in the way the organisation itself could. Before sending anything, the facilitator removes the names and the roles that identify a single person ("the team lead").

Examples

A 90-minute session brings together six people from the team that maintains a pension fund's portal for insured persons. Each cell records an observed behaviour or a sentence someone heard, never a rating.

Baseline of the insured-persons portal team on 10 March 2026. Invented example; the book prescribes no format.
DimensionPerspectiveObservation
EnvironmentHarmonyTechnical disagreements get settled in code review. In meetings, nobody contradicts anyone.
ProficiencyTwo developers are preparing for a certification in their own time. The team sets aside no time for training.
Work ClimateCollectiveThe team counts a sprint as a success when its tickets are closed. Customer service says: "The tickets are closed, but insured persons still call us with the same questions."
IndividualThree members come from the previous provider. Only they know the pension calculation module.
HierarchyArchitecture decisions wait for the team lead's view even when the team lead is away for two weeks.
Work StyleDoingEvery production release goes through a change request that the Thursday board approves.
ThinkingUser stories enter the sprint without acceptance criteria. The team refines them during development.
TimingDeliveries land on the last day of the sprint.

The Hierarchy row describes a behaviour that anyone can check. At the next session, the group looks at whether architecture decisions still wait for the team lead.

Visualisations

The cube shows the three dimensions and the perspectives that each one carries. The model table gives each dimension's question and each perspective's definition. The example table shows a dated baseline.

Cost

DimensionLevelJustification
PreparationMediumThe participants observe the team. Before the session, the facilitator collects feedback from the departments that receive the team's work.
ExecutionLowAccording to the book, 3 to 10 people for 30 to 120 minutes.
DocumentationLowA dated document that the team keeps for the next comparison. One person writes it up after the session.

Tooling

On site, a whiteboard split into three areas and sticky notes are enough. Each area takes one dimension. Remotely, a virtual whiteboard such as Miro, Mural or Microsoft Whiteboard does the same job. For his remote visual exercises, Anderson mentions Klaxoon and Microsoft Whiteboard. A survey tool collects written feedback before the session. A spreadsheet or a shared document keeps the dated baseline for the next comparison.

Sources

  • George W. Anderson, Design Thinking for Tech: Solving Problems and Realizing Value in 24 Hours, Pearson, 2023, ISBN 978-0-13-793303-7. Hour 6 "Understanding the Lay of the Land", section "Design Thinking in Action: The Culture Cube for Understanding", pp. 81-83: the two moves on culture, the observation questions, the participants and the duration, the three dimensions, the eight perspectives and their definitions. Same chapter, section "Design Thinking in Action: The Culture Snail for Pace of Change": the Snail's pointer to the cube. The same section places culture where IT teams and business teams meet. Hour 24, section "Stakeholders and Expectations": the Snail and the cube for an organisation's recent history and current state.

Anderson borrows the definition of Proficiency from Daniel Pink (Drive, Riverhead, 2009). He borrows the definition of Hierarchy from Greer, de Jong, Schouten and Dannals ("Why and When Hierarchy Impacts Team Effectiveness: A Meta-Analytic Integration", Journal of Applied Psychology, 2018). The five-step session plan, the pitfalls and the pension fund example do not come from the book.

CTQ Tree and Voice of the Customer
All techniques
Culture Snail