Your Training Partner
Techniques Toolbox
The settled question on the left. Three paths leave it: reverse an assumption, set up a provocation marked Po, borrow from an unrelated field. All three pour their raw ideas into a single list. The group then sorts the list against criteria chosen before the session. Reframing acts upstream on the question.

Creative thinking

Creative thinking covers the instruments that steer a group or an analyst away from the first answer that comes to mind on a problem already stated. Assumption reversal overturns a belief that everyone takes for granted. Michael Michalko describes it in Thinkertoys. Provocation puts forward a deliberately false statement and then draws ideas from it. Edward de Bono created the "Po" marker that flags such a statement. Analogy borrows a solution from a field unrelated to the problem. William Gordon and George Prince's Synectics turns it into a method. No instrument evaluates the ideas it produces. The deliverable is a list of raw ideas in which each idea carries its starting point. Sorting comes afterwards.

Goal

A group that thinks without an instrument reproduces the solutions it knows. The instruments of creative thinking impose a starting point it would not have chosen.

These instruments come in once the question is settled and before any comparison of options. Their list becomes the material for the solution options that the analyst documents and then evaluates with a decision matrix or a multi-criteria decision analysis.

Usage

When to use

  • A shared conviction blocks the group: assumption reversal makes it explicit and turns it over.
  • The group comes back with the same answers at every session: a provocation forces it to start from a statement that nobody would have proposed.
  • All the known solutions come from the same sector: analogy looks elsewhere for a problem of the same shape and borrows its solution.
  • A brainstorming session runs out of steam: the facilitator restarts it with a reversed assumption or a provocation.
  • Analyst alone against a deadline: assumption reversal needs no workshop. A sheet of paper is enough.
  • Distributed team: all three instruments fit on a digital whiteboard.
  • Steep hierarchy in the room: the "Po" marker lets an employee state an absurdity in front of management without defending it.

When not to use

Description

The instruments and their sources

Each instrument has its own source.

The instruments, their sources and their opening question
InstrumentSourceWhat it calls into questionOpening question
Assumption reversalMichael Michalko's formulation in Thinkertoys, chapter "False faces (reversal)"A belief about the problemWhat if the opposite were true?
Provocation and movementEdward de Bono, Po (1972), then Serious Creativity (1992)A fact that the situation takes for grantedPo: what happens if this fact disappears?
AnalogyWilliam J. J. Gordon's Synectics, Synectics (1961)The field in which the solution is soughtWho else has solved a problem of this shape?

SCAMPER belongs to the same family. It starts from an existing object and puts seven questions to it in a fixed order. To run a session, see SCAMPER.

A settled question

"How can we halve the lead time for collecting year-end accounting records?" is a question that the group no longer disputes. Reframing changes the question. Creative thinking multiplies the answers to a settled question.

Assumption reversal can serve on either side of this boundary. Reversing an assumption contained in the question ("the problem is the lead time") amounts to reframing. Reversing an assumption about the solutions ("the client sends in the records") produces options. The facilitator announces which of the two uses the session serves.

The group or the analyst sets the goal and the sorting criteria before the session. Sorting starts once idea generation is over.

Reversing assumptions

In this instrument, an assumption is a belief about the problem that nobody checks any more: "clients pay by invoice", "the form is filled in at the counter". Michalko formulates it in the chapter "False faces (reversal)" of Thinkertoys.

  1. Write the question. The facilitator writes the settled question at the top of the board.

  2. List the assumptions. The group writes down everything it holds true about the problem and its usual solutions. It phrases each assumption as a plain statement: "collection takes place once a year".

  3. Keep the fundamental assumptions. The group keeps those that carry the current solution. An assumption whose reverse changes nothing leaves the list.

  4. Reverse each assumption kept. The group writes the opposite statement next to the original: "collection never has a date".

  5. Work out how to make each reversal happen. The group asks what it would have to put in place for the opposite statement to become true. The answers are the ideas.

The reversal "the firm fetches the records" is a springboard. The idea is the means that makes it possible, for example read access to the client's bank statements. A group that presents the reversal as a recommendation skips the fifth step.

A list of obvious assumptions is the trap of the second step. The reversal then changes nothing. A fertile assumption is one that a participant would defend if someone challenged it.

Provocation and movement

Edward de Bono introduces the word "Po" in Po: A Device for Successful Thinking (1972). He develops the method in Serious Creativity (1992). A provocation is a deliberately false or absurd statement in which a fact that the situation takes for granted stops being true: "Po: houses have no roofs". The "Po" marker tells the group that the statement is a springboard. Nobody defends it.

Movement follows the provocation. The group suspends judgement and works through the statement with a checklist:

  • the consequences of the statement;
  • the benefits it would bring;
  • the special circumstances in which it would make sense;
  • the principles needed to make it work;
  • how it unfolds moment by moment;
  • what changes if the order of events changes.

The group draws a workable idea from what it has found. The house without a roof leads to the retractable roof or the glass roof. The deliverable records the idea drawn from the movement. The provocation appears in it as a starting point, never as a proposal.

Immediate judgement kills the provocation. "But a house without a roof lets the rain in" is true and useless: the provocation is false by design. The facilitator brings the group back to the movement checklist. The forgotten marker makes the opposite mistake. A provocation that a manager states without "Po" reads as a decision. The room fights it or applies it.

In a Six Thinking Hats session, the green hat reserves time for new ideas. A provocation can start the green-hat slot.

Reasoning by analogy

William Gordon developed Synectics with George Prince. Gordon published Synectics in 1961. Synectics looks for ideas in the unusual connections that metaphor and analogy bring to light. It works in two stages. The group first makes the strange familiar: it analyses the problem and what has been tried, then restates it in its own terms. It then makes the familiar strange: it leaves the problem through an analogy and then comes back to it.

In Gordon's account, Synectics is a group method with its own phases, roles and training. An analogy also works on its own as an instrument of creative thinking. To run the full method, see Synectics.

The analogies of Synectics
AnalogyWhat the group doesClassroom example: moving a sleeping cow
FantasyIt imagines the ideal solution as if any wish could come true.The cow floats to the next field.
DirectIt looks for a parallel situation in nature or in another trade.A crane that lifts heavy loads
PersonalEach participant identifies with the thing at the centre of the problem and describes how it feels."I am the cow. I want a quieter spot without waking up."
SymbolicIt describes the function with an objective and compressed image. The classroom form reduces this image to two words that contradict each other."Heavy lightness"

In later descriptions of Synectics, the group appoints a problem owner. The other participants help. The problem owner judges how useful the ideas are. A group in which each participant defends their own ideas loses this judge at the moment a decision is due.

The analogy that is too close is the common trap. A bank that studies another bank is doing benchmarking. The analogy works when the source field is distant and the problem has the same shape. The forgotten return leaves the group inside the metaphor. The facilitator brings each analogy back to the problem with one question: what would we do here with this mechanism?

From raw to sorted

The three instruments pour their ideas into a single list. Each row carries the instrument, the starting point and the idea phrased as an action: "send each client in December the list of last year's records" rather than "plan ahead better". The group merges the duplicates and then rates each idea against the sorting criteria. A dot voting round is enough for a quick sort. An idea kept becomes a hypothesis to test or a prototype.

The skipped sort costs the most. A raw list holds unworkable ideas next to the good ones. A committee that receives it unsorted reads into it proposals that the group has not evaluated.

Techniques related to creative thinking
TechniqueWhat it doesWhen to prefer it
BrainstormingOrganises a group session around an open question. The instruments of creative thinking can slot into it.The group needs a session format rather than a starting point.
SCAMPERPuts seven fixed questions to an existing object.A product, a process or a form already exists.
Problem shaping and reframingChanges the problem statement.The question itself is in doubt.
Assumption and Constraint AnalysisTests whether an assumption holds and what risk it carries.The aim is to control a risk rather than to produce ideas.
Six Thinking HatsSets the stance of the group: one mode of thinking at a time.The group has to examine a proposal from several angles.

AI considerations

A language model lists the implicit assumptions of a statement in a few seconds. It finds some that the group no longer sees, because the model does not share the group's habits. It also reverses each assumption. The fifth step stays the group's job: finding the means that makes the reversal possible in its own setting.

For analogy, the model proposes distant source fields that nobody in the room knows. It can also invent the case it cites: a company, a figure, a result. The analyst checks each case before using it as an argument.

The model produces provocations on demand. Movement requires knowledge of the situation: the clients, the constraints, the system in place. The model does not know the internal rules or the collective labour agreement (CLA). To the model, an idea that breaks them looks as plausible as a workable idea.

Nobody in the room defends an idea that the model wrote. Without a note of its origin, such an idea passes the sort without anyone checking that it respects the internal rules and the CLA. The facilitator therefore tells the group where it comes from.

An analyst who describes an internal process to a consumer AI assistant hands it names and amounts. These names are personal data under the Federal Act on Data Protection (FADP, SR 235.1). The analyst describes the problem without real names or figures.

Examples

A Geneva fiduciary firm agrees on the question: "How can we halve the lead time for collecting year-end accounting records from our SME clients?"

Raw idea list for collecting the year-end records. Starting situation: the client sends in the records in January and February. The firm then chases what is missing.
InstrumentStarting pointDirectionRaw idea
Reversal"The client sends the records to the firm."The firm fetches the records.The client grants read access to its bank statements. The firm draws up the list of missing records itself.
Reversal"Collection takes place once a year."Collection never has a date.The client uploads records throughout the year to a platform that sends a reminder every month.
Reversal"The firm knows what is missing."The client knows what is missing before the firm does.In December, each client receives the list of its records from the previous year and ticks it off.
Provocation"Po: the client supplies no records."Principle that would make it work: some of the records already exist with third parties.With a power of attorney from the client, the firm requests the certificates directly from the bank and the pension fund.
Direct analogyA pharmacy prepares the renewal of a long-term prescription before the patient asks for it.Prepare what comes back every year before anyone asks.In November, the firm sends a pre-filled file with last year's amounts. The client corrects the differences.

The third row and the last overlap: the sort will merge them. The list says nothing yet about feasibility. The sort will weigh what each idea assumes: access to the bank statements requires the client's written consent.

Visualizations

The deliverable fits into rows and columns: an HTML table that the group fills in and then sorts. The instruments, the Synectics analogies and the related techniques also fit into tables.

A diagram shows what the tables cannot. The three instruments start from the same settled question and each calls a different element into question. Their ideas join a single list that the group sorts once idea generation is over. Reframing acts upstream on the question. A second diagram shows assumption reversal: the idea comes from the question "how can the reversal be made true?" rather than from the reversal itself.

Cost

PhaseLevelJustification
PreparationLowWrite the settled question, set the goal and the sorting criteria, choose the instrument. One hour for the facilitator.
ExecutionLow to mediumThirty to sixty minutes per instrument in a group. Working alone, the analyst runs an assumption reversal in half an hour. Sorting takes another thirty minutes.
DocumentationLowA table with the columns instrument, starting point, direction, idea and sort verdict.

Tooling

A whiteboard and sticky notes are enough. The facilitator writes the settled question at the top and reserves one column per instrument. Each participant writes one idea per note and records the starting point in a corner. This keeps the idea tied to its origin when the group moves the notes during sorting. For reversal, a two-column sheet is enough: the assumption on the left, its opposite on the right.

Miro, Mural, Conceptboard and Microsoft Whiteboard reproduce this board for a distributed team. For a Swiss organisation, data residency guides the choice of tool whenever the statement describes an internal process. A spreadsheet is enough for sorting: one column per criterion, a filter on the verdict.

Sources

  • Michalko, M., Thinkertoys: A Handbook of Creative-Thinking Techniques, 2nd ed., Ten Speed Press, 2006, chapter "False faces (reversal)": assumption reversal in Michalko's formulation.
  • De Bono, E., Po: A Device for Successful Thinking, Simon and Schuster, 1972: the word "Po" as the marker of a provocative statement.
  • De Bono, E., Serious Creativity: Using the Power of Lateral Thinking to Create New Ideas, HarperCollins, 1992: provocation and movement.
  • Università degli Studi di Udine, Handbook of creativity techniques, "Provocation and Movement": provocation as a deliberately false statement, the movement checklist and the example of the house without a roof.
  • Gordon, W. J. J., Synectics: The Development of Creative Capacity, Harper & Row, 1961: the founding work of Synectics.
  • Kerr, B. (ed.), Encyclopedia of Giftedness, Creativity, and Talent, SAGE, 2009, entry "Synectics", DOI 10.4135/9781412971959.n374: the four analogies, the two stages of the method and the role of the problem owner.
  • Università degli Studi di Udine, Handbook of creativity techniques, "Synectics": the definition of direct, personal and fantasy analogies, the sleeping cow example and the compressed conflict.
  • Federal Act on Data Protection (FADP), SR 235.1, art. 5 let. a: the definition of personal data, which the description of an internal process may contain.

The steps of assumption reversal, running it as a workshop and the sorting come from practice.

Creative Destruction