Three sheets side by side show the Creative Destruction lists of a team that builds the employer portal of an OASI compensation office. The starting question: "How can we make sure we build a portal that no one will want to use?" The first sheet lists six ways to get there, for example writing the requirements without talking to an employer. Arrows link four of them to the team's current practices on the second sheet. The arrow from "write the requirements without talking to an employer" ends at "We write the requirements with the contributions department alone". Two have no matching practice. The third sheet carries four numbered decisions with their first step. The first one reads: "We will stop writing requirements without employers."

Creative Destruction

Creative Destruction is a Liberating Structures meeting structure that makes a group decide what to stop doing. The group first lists everything it could do to get the worst result from its work. It then notes what it already does that resembles this list. Finally it decides which practices to drop and writes a first step for each. Henri Lipmanowicz and Keith McCandless describe it under the name TRIZ in The Surprising Power of Liberating Structures (2013). The book gives it 35 minutes. Their site calls it Creative Destruction and keeps TRIZ as a second name. The structure does not use the tools of Genrich Altshuller's TRIZ.

Goal

Creative Destruction is a meeting structure that produces a numbered list of the practices to drop. Each entry starts with "I will stop" or "We will stop" and carries a first step.

A group finds it easier to describe how to sabotage its work than to admit what it does badly. The first list is a collective fiction. The second holds it up against real practice. Before defining the target state or writing the requirements, the business analyst gains an inventory of the practices that a change project risks carrying over.

According to the book, the structure clears space for innovation. It helps a group let go of what limits its success. The group knows this but rarely admits it. With it, the group can "speak the unspeakable" and safely challenge the practices that nobody dares to question. The book asks: "What must we stop doing to make progress on our deepest purpose?"

Usage

When to use it

  • Before defining a vision or a strategy: first clear out what the group will stop doing. The book also offers it in place of the visioning session.
  • Change project: identify the practices that the new organisation must not carry over.
  • Problems that come back from one retrospective to the next: turn the findings into decisions to stop a practice. See retrospectives.
  • A system that users shun: for an IT team, the book offers "How can we make sure we build an IT system that no one will want to use?"
  • Recurring errors in patient safety: cross-functional groups tackle wrong-side surgery, patient falls, medication errors and infections.
  • Overloaded team before a new project: make room by stopping activities before adding any.
  • Taboo subject or practice that nobody questions: the worst result makes people name what nobody says while they laugh.
  • Distributed team: the site describes running it in breakout rooms or as a whole group with the lists in the chat when no rooms are available.

When not to use it

  • Establishing the cause of an incident or a defect: the lists name practices and prove no cause. See root cause analysis.
  • Resolving a technical contradiction in a product: Altshuller's method resolves these contradictions. See TRIZ.
  • Climate where admitting a harmful practice exposes a person: the second list stays empty. Start with the group's successes using Appreciative Interviews.

Description

The elements of the structure

The authors describe each structure by five design elements. The book calls them "structural elements". Their site publishes a revised version of Creative Destruction. It adds time for an individual list at the start and a sharing round at the end.

ElementBook (2013)Authors' site
Structuring invitationThree successive prompts: list everything the group can do to make sure it achieves the worst result imaginable with respect to its top strategy or objective; note what the group already does that resembles it; decide the first steps to stop it"Let's make space for innovation by identifying the worst possible result of our work." The facilitator displays the three prompts one at a time. The page does not print them
Space and materialsAn unlimited number of groups of 4 to 7 chairs with or without small tables. Paper to take notesThe same groups. Paper for everyone and a flip chart or a whiteboard per group. Online, breakout rooms with a chat or a visual space
Participation distributionEverybody involved in the work. Everyone has an equal opportunity to contributeA host and the participants. Everyone is invited and has an equal opportunity to contribute. Online, a tech host. No minimum size
Group configurationGroups of 4 to 7: established teams or mixed groupsAlone, then in groups of 4 to 7, then the whole group
Steps and time allocationIntroduction, then three 10-minute lists each run as a 1-2-4-All. 35 minIntro, List Ideas, Combine Lists, Reckoning, Destruction, All-Together Sharing. About 50 to 55 min stated
The design elements of Creative Destruction according to the 2013 book and according to the authors' site.

Choosing the worst result

According to the book, the facilitator starts from a "VERY unwanted" result with respect to the group's top strategy or objective and has the group confirm it quickly. According to the site, a group resigned to its counterproductive practices needs more time on this point. The facilitator refines the worst result until it becomes unbearable.

The invitation takes the form "How can we make sure…?". The book gives examples:

  • for patient safety: "How can we make sure we always operate on the wrong side?"
  • for leaders who exclude diverse voices without meaning to: "How can we devise policies and practices that only work for a select few?"
  • for IT professionals: "How can we make sure we build an IT system that no one will want to use?"
  • for leadership groups: "How can we make sure we keep doing the same things with the same people while asking for different results?"

According to Keith McCandless, an invitation works when it is "precisely ambiguous". It takes each person back to a specific difficulty they have lived through. It also admits several right answers. A generic worst result such as "a project that fails" produces generic lists. The worst result concerns the group's objective: a portal that nobody uses, a processing time that doubles.

Forming the groups

The book suggests established teams or mixed groups. An established team owns its practices. Its third list can therefore say "We will stop". A mixed group sees the practices that cut across departments. Yet most of its decisions need the people named under "Who else needs to be included?"

In our view, when a line manager sits in the group, the participants keep quiet about the practices that this manager introduced.

The steps according to the book

  1. Introduction (5 min): the facilitator introduces the structure and names the unwanted result. If needed, the groups suggest several and keep the most unwanted one.
  2. First list (10 min): each group runs a 1-2-4-All and lists everything it can do to achieve this result.
  3. Second list (10 min): each group runs a 1-2-4-All. It goes through the first list item by item and notes everything it already does that resembles it.
  4. Third list (10 min): each group runs a 1-2-4-All. For each item on the second list, it decides the first steps that will stop it.

The facilitator displays the prompts one at a time:

  1. "Make a list of all you can do to make sure that you achieve the worst result imaginable with respect to your top strategy or objective."
  2. "Go down this list item by item and ask yourselves, 'Is there anything that we are currently doing that in any way, shape, or form resembles this item?' Be brutally honest to make a second list of all your counterproductive activities/programs/procedures."
  3. "Go through the items on your second list and decide what first steps will help you stop what you know creates undesirable results?"

In 1-2-4-All, each person thinks alone, then in pairs, in fours and finally with the whole group. Its full form takes 12 minutes. The book does not split the 10 minutes between these steps. The facilitator shortens them.

Constructed caseHow can we make sure we build a portal that no one will want to use?
List 1: everything that would lead to the worst result
Write the requirements without talking to an employer→ a
Show the portal to management only→ b
Deliver the whole portal at once after eighteen months
Copy the fields of the paper form onto the screen→ c
Test with invented data→ d
Replace the training with an 80-page PDF
List 2: what the team already does
aWe write the requirements with the contributions department alone→ 1
bWe reserve the demonstrations for the steering committee→ 2
cI copy the 42 fields of the paper form onto the screen (the business analyst)→ 3
dWe test with a fictitious data set→ 4
List 3: what the team stops doing
1We will stop writing requirements without employers.
First step: Invite three employers to the backlog refinement on 12 March
2We will stop reserving the sprint review for the steering committee.
First step: Invite two case handlers to the review on 19 March
3I will stop copying the fields of the paper form onto the screen.
First step: Mark the fields whose data the compensation office already holds by 15 March
4We will stop testing with invented data.
First step: Request an anonymised extract of real salary declarations by 22 March
Constructed case. Each list feeds the next: a way to reach the worst result, the current practice that resembles it, then the decision to stop that practice and its first step. Two items on the first list have no matching practice and stop there.

An item on the first list without a matching practice stops at the second list.

The steps according to the authors' site

The site names the steps.

  1. Intro (5 min): the facilitator reads the invitation. The group considers the worst result and refines it if needed.
  2. List Ideas (3 min): the facilitator displays the first prompt. Each person notes everything they can do to achieve the worst result.
  3. Combine Lists (10 min): the participants form groups of four to seven and combine their lists. In the room, they can run a 1-2-4-All.
  4. Reckoning (10 min): the facilitator displays the second prompt. Each group identifies everything it already does that in any way resembles an item on its list.
  5. Destruction (10 min): the facilitator displays the third prompt. Each group decides what it must stop doing to achieve the desired results. In the room, it runs a 1-2-4-All and notes the first steps for each behaviour to stop.
  6. All-Together Sharing (10 to 15 min): the groups present what they stop doing. The whole group reflects on what needs to stop and on the first steps. The facilitator spotlights the most inspiring first steps that participants have committed to.

List Ideas and Combine Lists correspond to the book's first list. Reckoning corresponds to the second and Destruction to the third. The site states about 50 to 55 minutes. Its steps add up to 48 to 53 minutes. Online, it suggests running the structure as a whole group (1-All) when no breakout rooms are available. The chat then receives the lists.

The first list: imagining sabotage

The group enters the structure in a spirit of serious fun. The first list can be long and outrageous. The facilitator checks in with groups that are laughing hard or look confused.

An item phrased as an action can then be compared with a practice: "approve the specifications without reading them". An item phrased as a state compares with nothing: "poor communication". The facilitator has the states rephrased as actions before the second list.

The second list: the reckoning

The group goes through each item on the first list. Following the book's prompt, it asks: "Is there anything that we are currently doing that in any way, shape, or form resembles this item?" The book asks for brutal honesty. The group notes its counterproductive activities, programmes and procedures.

The book asks the facilitator to give the groups time to see the resemblance to what they do. They also work out how the practice causes harm. A rushed second list contains the least embarrassing practices.

The group drifts easily toward what others do: management, IT, the client. The second list carries only what the people present do. Faced with another department's practice, the group notes its own part ("we accept X's specifications without rereading them"). It names that department under "Who else needs to be included?" on the third list.

In a large group, the site warns of premature agreement. The groups quickly converge on a few consensual practices. The facilitator then asks them to review their list critically.

The third list: deciding what to stop

The facilitator refuses every idea for doing something new or additional. Each proposal concerns an activity or a behaviour to stop. New ideas then move into the freed space. A proposal to launch something takes the group back to its usual brainstorming and adds work.

According to the book, the facilitator has the group number its decisions 1, 2, 3. The group phrases each one as "I will stop" or "We will stop". "I will stop" commits one person to stopping a practice that belongs to them. "We will stop" commits the group. Each decision gets a first step: who does what and by when.

The facilitator invites the people who will have to stop the activities. For each decision, the facilitator has the group ask: "Who else needs to be included?"

Keith McCandless writes that a cohesive team reaches critical mass during the session and stops some behaviours on the spot. He cites a surgical team that wanted to prevent wrong-side surgery. In that case, peer pressure helps. A less cohesive group needs informal coaching from colleagues. Without it, the first step may come to nothing. McCandless also asks: "What triggers the behavior you are trying to stop?"

After the session

The site warns against a return to old habits (snapback). According to McCandless, it often takes more than one intervention to change a behaviour. He repeats the structure with the same group and opens with "What has changed since our last meeting?" In his view, each person reports on their progress without feeling that a manager is ticking off a checklist.

The book suggests a second or a third round to refine the unwanted result or to understand it better. The site suggests a second round where the participants make real decisions about what they will stop doing.

Stringing Creative Destruction with other structures

The authors combine several Liberating Structures into a sequence (string). The book follows Creative Destruction with 1-2-4-All for new ideas, with 15% Solutions for each person's immediate actions, then with Troika Consulting for advice from two peers.

Ecocycle Planning distributes a group's activities across four phases. One of them is creative destruction. According to the book, Creative Destruction can deepen this phase. The book also suggests linking the results of Creative Destruction to a review of all activities with Ecocycle Planning.

After the first steps, the site suggests Troika Consulting, Wise Crowds or Options Place (Open Space in the book).

The book describes a leadership team retreat in which Creative Destruction identifies the actions and behaviours to stop. According to the book, when the group decides to remove big obstacles, a giddy enthusiasm often pushes it to launch innovations. The book then adds Mad Tea and Strategy Safari to temper this momentum.

The book also offers a variant of Discovery & Action Dialogue. Questions inspired by Creative Destruction replace its first three questions. What can you do to make problem X much worse? Do you do anything that resembles one of these practices? What prevents you from stopping them?

Creative destruction is also a Liberating Structures principle. The book states it as "Invite creative destruction to make space for innovation".

The book describes the structure as "inspired by the eponymous Russian engineering approach". The site also refers to this method. Genrich Altshuller's TRIZ resolves technical contradictions with inventive principles. Creative Destruction uses neither contradictions nor inventive principles. For Altshuller's method, see TRIZ.

In our view, the closest relative in Altshuller's school is Anticipatory Failure Determination (AFD). This method uses TRIZ in reverse: the engineer looks for ways to make a design fail, then corrects the design to make it more robust against these failures.

Gary Klein's premortem also starts from failure. The team imagines that the project has just failed and gives the reasons. Creative Destruction asks what the group already does that would produce the failure.

AI considerations

To phrase the worst result, the facilitator gives a language model the group's objective and asks it for several questions in the form "How can we make sure…?". The facilitator keeps the one that the group will understand without explanation.

The first list stays in the room. A model asked about the causes of failure produces those that the literature cites: insufficient management support, unclear requirements. If a list from the model is shown before the session, it steers the group's list. The group knows its own ways of sabotaging its work. The second list belongs to the group alone, since only the group knows what it already does.

After the session, the model transcribes the photos of the flip charts. It merges similar decisions from the groups and puts the list of practices to drop into the "I will stop" and "We will stop" format. The facilitator checks each merge against the sheets. A decision that no group took is an invention of the model.

The second list describes internal dysfunctions. It sometimes targets a person or a department. The facilitator removes the names and the identifying details before sending the lists to an external AI service.

Examples

The third list is the deliverable of the structure. Each decision traces back to a practice on the second list.

No.DecisionCurrent practiceFirst stepWho else?
1We will stop writing requirements without employers.We write the requirements with the contributions department alone.The business analyst invites three employers to the backlog refinement on 12 March.The head of the contributions department
2We will stop reserving the sprint review for the steering committee.We reserve the demonstrations for the steering committee.The Product Owner invites two case handlers to the review on 19 March.The project manager
3I will stop copying the fields of the paper form onto the screen (the business analyst).I copy the 42 fields of the paper form onto the screen (the business analyst).By 15 March, the business analyst marks the fields whose data the compensation office already holds.The data manager
4We will stop testing with invented data.We test with a fictitious data set.By 22 March, the test manager requests an anonymised extract of real salary declarations.The data protection advisor
Constructed case. The team that builds the employer portal of an OASI compensation office starts from the question "How can we make sure we build a portal that no one will want to use?" The table shows its third list.

Decision 3 starts with "I will stop". The practice belongs to the business analyst, who commits alone.

Visualisations

A diagram follows one case from the first list to the third. The elements of the structure and the third list of the example fit in rows and columns.

Cost

PhaseLevelJustification
PreparationLowPhrase the worst result, form groups of 4 to 7, provide paper and a flip chart per group.
ExecutionMedium35 minutes according to the book. About 50 to 55 minutes according to the site. Everyone involved in the practices spends 35 to 55 minutes on it.
DocumentationLowThe numbered list of practices to drop with the first steps and the people to include. The group meets again to follow up the first steps.

Tooling

In the room, the structure needs tables of four to seven chairs, paper for everyone and a flip chart or a whiteboard per group. A visible timer helps the facilitator keep each of the three lists to time. The facilitator displays each prompt when its list begins.

Remotely, the facilitator uses a videoconference with breakout rooms (Zoom, Microsoft Teams). Without rooms, the chat receives the lists of the whole group. A digital whiteboard (Miro, Mural) receives each group's three lists.

The list of practices to drop then goes into the team's tracking tool (Jira, Microsoft Planner). There each first step becomes a task with an owner and a date.

Sources

Henri Lipmanowicz and Keith McCandless developed Creative Destruction. The book tells of a nurse who used it in her unit to prevent infections. She asked: "How can we make sure that we expose every patient to a superbug during their visit?"

  • Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of TRIZ with its elements, purposes, tips, variations, examples and attribution (Field Guide, Part Four); the principle of creative destruction (Chapters 3 and 4); the nurse and the superbug question (Chapter 5); the strings (Chapter 6); the session designs (Chapter 7); the Discovery & Action Dialogue variant and the link with Ecocycle Planning (Field Guide).
  • Creative Destruction (aka TRIZ), Liberating Structures: the site's version with its named steps, timings, online facilitation, tips and strings.
  • Keith McCandless, "Creative destruction", Integration and Implementation Insights, 8 November 2022: the "precisely ambiguous" invitation, the example for leadership groups, the author's reply on first steps and the repetition of the structure.
  • Steve Ungvari, "The Anticipatory Failure Determination Fact Sheet", The TRIZ Journal, October 1999: AFD and subversion analysis, which uses TRIZ in reverse.
  • Gary Klein, "Performing a Project Premortem", Harvard Business Review, vol. 85, no. 9, 2007: the premortem, in which the team imagines that the project has failed.
Creative Brief
All techniques
Creative thinking