Crazy 8s
Crazy 8s is a timed sketching exercise done alone. Each participant folds a sheet into eight frames. In each frame they have one minute to draw a variant of one of their best ideas. Jake Knapp, John Zeratsky and Braden Kowitz make it the third of the four steps of Tuesday's sketch in the Design Sprint, which their book Sprint (2016) describes. The minute leaves no time to polish the line or to judge the idea. The participant compares several forms of their ideas. The solution sketch that follows takes up the best variant.
Goal
In Crazy 8s, each participant works alone for eight minutes and draws a variant of one of their best ideas in each of the eight frames. The participant circled these ideas at the previous step. The exercise makes them look for other forms: another entry screen, another order of steps, another channel, another wording.
A participant often stops at the first reasonable solution that comes to mind. A participant who develops the idea in the form it first took has compared that form with no other. Eight frames force the participant to compare before investing an hour in a detailed sketch.
The exercise leads up to the participant's choice: which variant to develop in the solution sketch. The eight-frame sheet stays a personal rough draft. The team reviews the solution sketch as the deliverable.
Usage
When to use it
- A promising idea exists in a single form: eight frames force a search for other forms before it is developed.
- Before a solution sketch, a storyboard or a paper prototype: the participant chooses the variant to develop from eight.
- A solution you can see: a form, a user flow, a dashboard or a letter can be drawn in rectangles and words.
- A group where a few voices dominate: everyone draws alone and in silence. Nobody sees the neighbour's sheet.
- Participants who say they cannot draw: the minute per frame rules out careful drawing for everyone.
- A distributed team: each person folds their sheet at home. The facilitator calls out each minute on the video call.
- An analyst alone before mock-ups: for an idea already written down, eight minutes are enough without a workshop.
When not to use it
- No idea has been chosen yet: the frames stay empty. Open up the options first with a brainstorm written in silence.
- The solution has no form to draw: a pricing rule or a contract clause is hard to draw. Transform the object with SCAMPER.
- The full solution space must be visible: eight frames show a sample. Build a morphological box.
Description
Its place in the four-step sketch
On the Tuesday afternoon of a Design Sprint, each team member sketches alone in four steps (Sprint, p. 109). Crazy 8s is the third.
- Notes (20 minutes): the participant walks around the room in silence and copies down what matters.
- Ideas (20 minutes): they doodle rough ideas for themselves and circle the most promising ones.
- Crazy 8s (8 minutes): they fold a sheet into eight frames and draw in each frame a variant of one of their best ideas (p. 111).
- The solution sketch (30 to 90 minutes): they develop one solution in three panels on three sticky notes stuck to a sheet. The sketch explains itself, stays anonymous and has a title (p. 114).
On Wednesday, the team judges the solution sketches. As early as 2012, Knapp stated that the sheet of eight sketches was not shown to the group. Its author therefore has no reason to polish it.
The book has everyone work alone in the same room (work alone together). According to the authors, group brainstorms do not work: everyone needs time to develop their solutions (p. 107). The book also holds that everyone can sketch, since most solution sketches are nothing more than rectangles and words (p. 104). Finally, the sketch makes an abstract idea concrete. Others can then evaluate it (p. 106).
Preparing the sheet and the time
Each participant takes an A4 sheet and folds it in half three times. Unfolded, it shows eight frames. Knapp described this fold in 2012. A marker works better than a fine pen: the thick line discourages detail.
The facilitator sets up a timer that everyone can see. An interval timer set to eight one-minute periods signals each change of frame. The facilitator then no longer has to watch the clock.
Outside a sprint, the facilitator keeps at least the Ideas step: twenty minutes to doodle alone, then circle.
One frame per minute
The facilitator restates the instruction in one sentence, starts the timer and falls silent. Everyone draws alone and in silence. At the signal, the participant moves on to the next frame, even if the sketch is unfinished. An unfinished sketch still records a variant.
A frame contains rectangles, arrows and a few words. From one frame to the next, the participant varies one aspect of the idea: the entry point, the order of the steps, the channel, what the solution does on the user's behalf, what it removes, the next step.
The first frames often repeat the idea as it was circled. Once the obvious variants are drawn, the remaining minutes force the participant to look for others. The last frames then move away from the starting idea. That is the reason for the clock: a participant who stays on the same frame for three minutes polishes it and draws only six variants.
In 2012, Knapp gave the reason for the constraint: to "turn off the self-editing" and get the ideas onto paper. He advised a participant who was stuck to redraw an earlier sketch with a small change. In his view, this exploration is useful and moves the work forward.
After the eight minutes
The participant looks over the sheet and marks the frame to carry into the solution sketch. They can combine two.
One facilitation variant has each sheet presented to the group, then a dot vote. It does not appear in the authors' checklist. It changes the exercise: a participant who knows the sheet will be shown draws for the group. When the group has to choose, the book applies dot voting on Wednesday to the solution sketches, which are made to be read without their author.
The 2012 version and the origin of the exercise
Knapp described the exercise in 2012 under the name Crazy Eights. He has since marked that GV Library article as outdated. The 2016 book is the reference.
| Knapp's article, 2012 | Sprint, 2016 | |
|---|---|---|
| Name | Crazy Eights | Crazy 8s |
| Duration | 5 minutes | 8 minutes |
| Time per frame | about 40 seconds | 1 minute |
| Rounds | two, on Knapp's advice | one |
| Previous step | an individual mind map | the participant circles the most promising ideas |
| Next step | a three-panel storyboard | the three-panel solution sketch |
| Sheet shown to the group | no (aren't shared with the group) | no: the checklist does not provide for showing it. Only the solution sketches are reviewed |
In the same article, Knapp writes that Crazy Eights builds on the "685" exercise that Brynn Evans introduced to his team. The Gamestorming site publishes a 6-8-5 exercise: each player sketches six to eight ideas in five minutes and presents them to the group, then the group runs another round if time allows. Gamestorming attributes the 6-8-5 to Todd Zaki Warfel. The 6-8-5 produces distinct ideas. Crazy 8s varies the participant's best ideas. In the 2012 version, the Crazy Eights sheet was not shown to the group.
The pitfalls
A participant who shades a button or lines up their rectangles is making a polished drawing and draws one variant fewer. Before the start, the facilitator reminds everyone that rectangles and words are enough.
The blank page comes from an exercise launched without the Ideas step. The participant searches for something to draw instead of varying what they have. The frames stay empty or carry eight unrelated ideas.
The extended timer gives the participant back the time to judge. A facilitator who grants "one more minute" removes the constraint that makes the exercise.
The neighbour's comment brings back the group discussion that the book rules out. A participant who shows their sheet or comments on someone else's during the eight minutes gets an idea judged before it is drawn.
The sheet taken for a deliverable misleads its readers. Eight one-minute sketches are rough options that nobody has evaluated. A committee that receives a photo of a sheet reads it as eight proposals.
Related techniques
| Technique | What forces the variants | When to prefer it to Crazy 8s |
|---|---|---|
| SCAMPER | Seven questions asked one after another about an existing object. | For an object with no form to draw or when the group must see which operation produced each variant. |
| Morphological box | The object broken down into parameters, whose values the box combines. | The full solution space must be visible and comparable. |
| Brainstorming | An open question, which the group answers. | No idea has been chosen yet. |
| Storyboarding | No variants: the storyboard lays out one solution in ordered panels. | The variant is chosen and the flow must be shown. |
AI considerations
A language model proposes eight written variants of an idea described in two sentences within seconds. Used during the eight minutes, it replaces the exercise. The participant copies instead of searching. Their frames look like those of the neighbour who asked the same model the same question.
Before the workshop, the facilitator asks the model for the aspects along which an idea of this kind can vary: the channel, the order of the steps, the entry point, how much of the work is automated. The facilitator keeps this list to get a stuck participant going again.
After the workshop, a multimodal model transcribes the photo of a sheet into a list of eight variants, which the author checks. The model reads hasty handwriting poorly and sometimes replaces an illegible word with an invented one.
An image generator renders polished mock-ups in one minute. A polished mock-up looks finished and gets the finish judged instead of the idea.
A participant who draws with real customer names or real policy numbers produces a sheet that contains personal data within the meaning of the Federal Act on Data Protection (FADP, SR 235.1). The participant draws with invented data. Before passing a photo of the sheet to a consumer AI assistant, the facilitator checks that it carries no real data.
Examples
A health insurer wants its policyholders to submit physiotherapy invoices faster. At the Ideas step, the analyst circled "photograph the invoice in the app". On the Crazy 8s sheet, the analyst varies this one idea:
- 1"Send an invoice" button on the home screen: tap, take the photo, sendthe entry point
- 2Guide frame: the app takes the photo as soon as the invoice is sharpwhat the solution does on the user's behalf
- pre-filling added3Amount and practice read from the photo and pre-filled for checkingwhat the solution does on the user's behalf
- 4Several invoices photographed in a row and sent togetherthe order of the steps
- carried into the solution sketch5Scan of the invoice's QR code instead of the photothe channel
- 6Practice's PDF forwarded by e-mail to an insurer addressthe channel
- 7Invoice tracking: received, checked, reimbursedthe next step
- 8The practice sends the invoice; the policyholder confirms with one tapwhat it removes
Each frame changes a single aspect of the circled idea. For the solution sketch, the analyst combines frames 5 and 3. The QR code on the invoice carries the amount and the practice. The app pre-fills them and the policyholder checks them.
Visualisations
The first diagram places the exercise in the four-step sketch. It shows what Crazy 8s receives from the Ideas step and what it passes on to the solution sketch.
The second diagram shows the sheet from the example: on it, the analyst draws eight variants of the circled idea in eight minutes. The last frames move away from that idea.
Two tables compare the 2012 and 2016 versions and the related techniques.
Cost
| Phase | Level | Rationale |
|---|---|---|
| Preparation | Low | A4 sheets, markers, a visible timer. |
| Execution | Low | Eight minutes plus two minutes of instructions. Outside a sprint, twenty minutes of the Ideas step before the exercise. An analyst alone does it without a workshop. |
| Documentation | Low | Nothing to write up. A photo is enough to keep the sheet. |
Tools
An A4 sheet, a black marker and a timer are enough. An interval timer on a phone or projected on the screen signals each minute to the whole room.
Remotely, a digital whiteboard such as Miro or Mural offers eight-frame templates. Drawing with a mouse is slow there and pushes people towards text. A tablet with a stylus gives a line close to paper.
Sources
The authors of the Design Sprint described Crazy 8s at GV on the basis of the 6-8-5.
- Knapp, Jake, Zeratsky, John and Kowitz, Braden (2016), Sprint: How to Solve Big Problems and Test New Ideas in Just Five Days, Simon & Schuster, ISBN 978-1-5011-2174-6, pp. 104-114: the four-step sketch, Crazy 8s (p. 111) and the principles of sketching alone.
- Zeratsky, John (2016), Sprint: Tuesday, GV Library, Internet Archive copy: the Tuesday checklist kept by the authors with the durations and the references to the book's pages.
- Knapp, Jake (2012), The product design sprint: diverge (day 2), GV Library, Internet Archive copy: the first version of the exercise. Knapp has since marked the article as outdated. In it, he links Crazy Eights to the "685" exercise presented by Brynn Evans.
- Gamestorming, 6-8-5: the 6-8-5 exercise, which Gamestorming attributes to Todd Zaki Warfel.
- GV, The Design Sprint: the official summary of the week, which places solo sketching on Tuesday.
- Federal Act on Data Protection (FADP), SR 235.1, art. 5 let. a: the definition of personal data, which a sheet drawn with real data can contain.

