Your Training Partner
Techniques Toolbox
A Conversation Café table seen from above: six chairs in a circle and a talking object. The host sits on one of the chairs. A band shows the four rounds with the Field Guide timings. In rounds 1 and 2, the object passes around and each person speaks for 1 minute. In round 3, the table talks freely for 20 to 40 minutes and the object is optional. In round 4, the object passes around again for 5 to 10 minutes. The total computed from these timings runs from 35 minutes for five people to 64 minutes for seven.

Conversation Café

The Conversation Café is a dialogue structure for small groups. At each table, five to seven people talk about a situation that confuses or shocks them. A talking object passes around: only the person who holds it speaks. The conversation follows four rounds. The object passes around in three of them. Six agreements govern listening and speaking. The structure helps a group make sense of a situation before it acts. Henri Lipmanowicz and Keith McCandless adapted it from the Conversation Café of Vicki Robin and Susan Partnow. They describe it in The Surprising Power of Liberating Structures (2013).

Goal

The Conversation Café is a facilitation structure in which small groups make sense of a difficult situation together. Its authors describe it in their book and on their site liberatingstructures.com.

According to Lipmanowicz and McCandless, the structure helps a group make sense of a complex, difficult or painful situation so that it can move on. It generates new ideas. It shows participants how each of them forms a point of view. It prevents the arguments that misunderstandings cause. It builds trust and reduces fear because everyone can say what they feel.

The structure produces neither a decision nor an action plan. The Field Guide (part four of the book) forbids assigning tasks: nobody comes into the dialogue expecting to get an action directly out of it. Each participant leaves with the takeaway they named in the last round. According to the authors, the table forms a shared hunch as it makes sense of the situation. This hunch prepares the action that other structures then organise.

Vicki Robin, Susan Partnow and Habib Rose created the Conversation Café in Seattle in the summer of 2001. Each of them sat in a café once a week and invited the people there to talk about what mattered to them. According to Vicki Robin, the attacks of 11 September 2001 showed that these cafés could help people from different backgrounds get through the event. The NCDD (National Coalition for Dialogue & Deliberation) publishes their how-to. In 2003, the Seattle hosts worked for six months with Keith McCandless to set the principles of the Conversation Café. McCandless also hosted cafés and worked as a consultant.

You will find the other structures of the repertoire under Liberating Structures.

Usage

When to use it

  • After a shock or a setback: a cancelled project, a merger announcement, the loss of a major client. The group makes sense of the event before it reacts.
  • A new subject that nobody knows well yet: a regulation or a trend. Each person says what they know about it and what worries them about it.
  • An emotionally charged subject: the talking object protects each person's turn and the table listens without replying.
  • After a major change: the group looks for what the change means and what they can assume or conclude from it.
  • Before a difficult decision: the café builds a common understanding. What, So What, Now What? then leads to the next steps.
  • A group shaped by hierarchy: the talking object gives everyone an equal turn whatever their rank.
  • An evening or a meeting with clients: the book reports a product manager who replaced a presentation with a Conversation Café.
  • A large group: the number of tables has no limit. All the tables work at the same time.
  • A remote team: the structure moves online without major adaptation. Each table has its own breakout room.

When not to use it

  • A decision or a deliverable expected by the end of the session: the authors forbid assigning tasks. What, So What, Now What? or 15% Solutions lead to action.
  • A conflict of interest between two camps: in our view, the café sheds light on the points of view without deciding between them. A negotiation seeks an agreement.

Description

The theme and the invitation

The facilitator usually states the theme as a question. The facilitator invites the participants to gather in small groups to hear what the others think and to reflect together on a shared difficulty. Each person commits to six agreements. The site compares the session to a dinner party. The conversation goes deeper than at such a dinner: people listen more and give up debate.

In our view, the question addresses the meaning of the situation. "What does the end of the project change for us?" opens the dialogue. "Should we restart the project?" calls for a vote and brings back the debate that the structure sets aside.

The tables and the talking object

Each table brings together five to seven people from different departments and roles. The number of tables is open. One or two flip chart sheets and markers lie on the table as a tablecloth: the participants write and draw their ideas on it.

Each table receives a talking object: a stick, a stone or a work of art. Whoever holds the object speaks. The others listen. When the speaker has finished, they pass the object to their neighbour. The NCDD hosting manual accepts any object that is easy to hold. Even a salt shaker will do. According to this manual, the object protects the speaker's turn and puts everyone on an equal footing whatever their rank. The Field Guide asks the facilitator to use it every time. It recommends an object that has meaning for the participants. In our view, a pen or a cup is enough in a meeting room.

The site recommends the object unless it is culturally inappropriate or could come across as cultural appropriation. Online, each person uses their own object. They "pass" it by holding it out in front of them and naming the next person.

The agreements

The facilitator displays the six agreements. Before the first round, the host or the participants read them aloud again. When each person listens, they suspend judgement as best they can and seek to understand rather than persuade. They respect the others and welcome opinions that differ from their own. When they speak, they say what matters to them personally. They aim for honesty and depth without going on and on.

The NCDD publishes the six agreements of the original Conversation Café. Each of its agreements has a name ("Curiosity", "Brevity"). The original version combines respecting others and being open to other opinions into one agreement. It adds another: question assumptions and look for new insights. The host reads the agreements of the version they run.

The table host

At each table, a volunteer takes the role of host. The host takes part like everyone else. They step in gently only when a participant visibly breaks an agreement. The Field Guide cites the most frequent case: someone who talks too long. If there is a problem, the host asks the table whether it is keeping to its agreements.

The NCDD manual describes the same role. The host speaks little because the group gives more weight to what the host says. The host can stop the table with a hand gesture and have the agreements read again. The host can also take the object and ask for a minute of silence. The manual states that the café has no agenda and expects no outcome. It considers this role difficult for an experienced facilitator. The host intervenes as little as possible. They do not steer the conversation, draw conclusions or summarise. They may ask a follow-up question or rephrase what they heard. The NCDD suggests questions such as "What happened that led you to this point of view?", "How does this affect you personally?" or "Here's what I heard… is that what you mean?"

An online session also needs a person in charge of the technology.

The rounds

The talking object passes around in rounds 1, 2 and 4. The facilitator announces the duration of each round before the first one.

Conversation Café table seen from aboveTalkingobjectHost(participant)
Reading the agreements
Round 1
First impressions1 min per person
Round 2
Reflections1 min per person
Round 3
Open conversationobject optional20 to 40 min
Round 4
Takeaways5 to 10 min
Calculated total: 35 min for 5 people, 64 min for 75 + 5 + 20 + 5 = 357 + 7 + 40 + 10 = 64
A Conversation Café table seen from above and its rounds with the Field Guide timings. The talking object passes around in rounds 1, 2 and 4. It is optional in round 3. The total is our calculation from these timings.

Round 1: first impressions. Each person in turn says what they think about the theme, what they feel about it and what they are doing about it. They have one minute. Nobody replies or comments. Anyone may pass.

Round 2: reflections. After listening to the whole table, each person says what they now think and feel. They again have one minute. They can build on their first remarks or link them to what the others said.

Round 3: open conversation. The table talks freely for 20 to 40 minutes. The object becomes optional. The NCDD how-to brings it back when someone dominates, when the tone hardens or when the discussion loses focus.

Round 4: takeaways. The object passes around one last time. Each person says what they take away from the conversation. The round lasts 5 to 10 minutes. The original version asks each person what challenged, touched or inspired them.

The site adds a 3-minute whole-room debrief. A few participants share one takeaway from their table with everyone.

The timing

The book gives 35 to 60 minutes. By our calculation, a table of five with the shortest durations takes 35 minutes: 5 + 5 + 20 + 5. A table of seven with the longest durations takes 64 minutes: 7 + 7 + 40 + 10. The book's 60 minutes therefore fall short of this sum.

Around the café, the site adds the introduction (1 minute), the instructions (3), the presentation of the agreements (5), the forming of groups (3) and the whole-room debrief (3). These steps take 15 minutes. By our calculation, the complete session lasts 50 to 79 minutes. The site gives about 45 to 75 minutes.

Why does the object pass around before the discussion?

In an ordinary meeting, the first people to speak set the frame. The others react to what they said or stay silent. In a Conversation Café, each participant speaks twice before anyone can reply to them. The first round brings every position into the room. The second asks each person to work out where they stand in relation to what they have heard. The open conversation starts from five to seven points of view instead of the two or three that usually dominate. According to the authors, participants debate less and listen more.

The versions of the Conversation Café

The book, the authors' site and the original Conversation Café describe the same sequence of rounds with different durations and group sizes.

PointBook (2013)Authors' siteOriginal version (NCDD)
Stated duration35 to 60 minAbout 45 to 75 min. The café alone takes 30 to 64 min60 to 90 min. 90 min is best
Group size5 to 7 people. Mixed groups5 to 7 people. At least 5Up to 8 people plus the host. Two or more groups above 10
Rounds 1 and 21 min per person per round1 min per person per roundRound 1: about 1 min per person. 2 min at most. Round 2: under 2 min per person
Round 320 to 40 min20 to 40 minNo set duration
Round 45 to 10 min5 to 10 minStarts 5 to 10 min before the end
HostOne volunteer per table who takes partOne host per group. A person in charge of the technology onlineAt least one host. One per table if possible
AgreementsSix (Liberating Structures version)Six (Liberating Structures version)Six (original version)
After the caféNo tasks assignedNo tasks assignedNo committee. A joint project takes shape in a new group
The Conversation Café according to the book, according to the authors' site and according to the original version published by the NCDD. Each column draws on a single source.

The NCDD principles reserve the name Conversation Café for sessions that follow its process and its agreements. They encourage adaptations under another name. The book keeps the name and credits Robin and Partnow.

What makes a Conversation Café fail

A facilitator who announces an action plan for the end changes what the participants say. Each person then defends a position instead of looking for the meaning of the situation. The NCDD manual states that nobody has to agree or commit to an action. According to the manual, the café is open and safe because nothing is at stake.

A table that gives up the talking object falls back into an ordinary meeting. Those who usually speak take the floor again.

The NCDD manual warns against another shortcut: skipping round 2 to open the discussion sooner. The table then slips back into the usual conversation. Each person repeats what they thought on arrival.

When each person speaks for three minutes in the first two rounds, a table of seven spends 42 minutes on them. The Field Guide allows 14. The agreement on brevity covers this case. The host reminds the table of it at the first overrun.

A discussion can also get stuck in a disagreement. The table then acknowledges the divergence. Next it explores what underlies it: each person's assumptions, information, beliefs and values.

In our view, the object guarantees each person their turn. It does not guarantee what each person dares to say during that turn. Yet one agreement asks everyone to say what matters to them personally. When a manager sits with their own team, the first round stays superficial. A table made up of one department hears only that department's reading. The facilitator therefore assigns the participants to tables before the session. The facilitator mixes the departments and seats each manager at a different table from their team.

Variants and strings

The authors suggest rotating the tables every 20 minutes in the manner of World Café: one person stays at their table and the others move to another table. They also suggest graphic recording on the tablecloth. They recommend Wicked Questions to deepen the conversation, Spiral Journal to dig into the ideas that emerge and Mad Tea or Calm Tea to widen their range.

To move to action, the Field Guide strings the café with What, So What, Now What?, 15% Solutions, Design StoryBoards, User Experience Fishbowl (a variant of Fishbowl) or Open Space. Chapter 6 of the book describes a string for a surprising or shocking event. A Conversation Café first makes sense of the situation. What, So What, Now What? then shares the facts and the observations to choose the next steps. Finally the group designs the string that puts these steps into practice. In the Field Guide, the entry for Heard, Seen, Respected lists the Conversation Café among the structures that help repair a relationship.

AI considerations

Neither the book nor the site mentions AI. In our view, AI has no place at the table.

Before the session, a language model can suggest several wordings of the theme. The facilitator asks it which ones call for a yes or a no: those wordings bring back the debate. For a bilingual group, the model translates the agreements into French and German. One person from each language group reviews the translation. A badly translated agreement changes its meaning.

During the rounds, the participants talk about what affects them. A microphone that records for automatic transcription changes what they dare to say. In our view, the facilitator does not record the tables.

After the session, the facilitator can photograph the tablecloths and the cards from the last round. A model then groups the takeaways of all the tables by theme. This grouping prepares a What, So What, Now What? session. The model does not turn the takeaways into tasks: the group does that in the next structure. The tablecloths often name identifiable colleagues or clients. This information is personal data within the meaning of the Federal Act on Data Protection (FADP, Art. 5 let. a). Before passing it to an external AI service, the facilitator removes the names and any detail that would identify a person.

Examples

The only traces of the café are the tablecloths and the cards from the last round. The NCDD manual suggests having the participants jot down a few words on cards and collecting the cards. In the constructed case, the takeaways are observations.

ParticipantTakeaway written down in round 4
Business analyst"We tracked the screens delivered. Nobody tracked what the members asked for."
Developer"I had seen the supplier's delay in March. I didn't know whom to tell."
Head of member services"Members still call for the same certificate. The portal didn't provide for it."
Project manager"The committee saw a green status until June. Our reports counted the days used up."
Tester"Each of us had doubts from the spring on. Each of us kept them to ourselves."
Constructed case. A pension fund in French-speaking Switzerland stops its members' portal project after two years. The next day, a table of five holds a Conversation Café on the question "What does stopping the portal change for us?" Each person writes down their takeaway in round 4.

No line sets a task. Lines 2, 4 and 5 overlap: each person doubted alone. The table discovers this together. A What, So What, Now What? session can start from these five observations.

Visualisations

A diagram shows a table seen from above and the four rounds with the Field Guide timings. The published versions and the takeaways of one table fit in rows and columns.

Cost

PhaseLevelJustification
PreparationLowPhrase the theme as a question. Set up tables of five to seven chairs with a talking object and the agreements on display.
ExecutionMedium35 to 60 minutes according to the book, 45 to 75 minutes according to the site. All the tables work at the same time.
DocumentationLowThe sources call for no minutes. The tablecloths and the cards from the last round are enough.

Tooling

The room needs small tables surrounded by five to seven chairs and one talking object per table. A card on each table shows the six agreements. One or two flip chart sheets and markers make the tablecloth. A timer or a bell announces the change of round.

For a remote session, Zoom or Microsoft Teams split the participants into breakout rooms of five to seven. The facilitator announces each round with a message broadcast to all the rooms. An online whiteboard such as Miro or Mural replaces the tablecloth.

Sources

The book is published under a Creative Commons BY-NC-SA 3.0 licence. The structure's page on the site is published under a BY-SA 4.0 licence.

  • Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of the Conversation Café with its invitation, steps, purposes, tips, variants, examples and attribution (Field Guide, part four); the string after a shocking event (chapter 6); the client evening (part three); Heard, Seen, Respected (Field Guide).
  • Conversation Cafe, Liberating Structures: the site's version with its invitation, timings, round names, agreements, whole-room debrief, online facilitation and proposed strings.
  • Conversation Café quick how-to, National Coalition for Dialogue & Deliberation: the agreements, the process of the original version and the follow-up questions.
  • Conversation Café Complete Hosting Manual, National Coalition for Dialogue & Deliberation: the duration, the host's role, the talking object, the risk of skipping the second round, the splitting of large groups and the last round.
  • Principles for Conversation Cafés, National Coalition for Dialogue & Deliberation: the absence of a committee, the use of the name and the work of the Seattle hosts with Keith McCandless in 2003.
  • Conversation Cafes, Vicki Robin: the origin of the Conversation Café in 2001.
Control plan
All techniques
Cost Aggregation and Cost Baseline