Your Training Partner
Techniques Toolbox
A horizontal three-step arc, opening then exploration then closing, joined by arrows, with an orange 'Facilitator' band running beneath all three steps, a row showing the family's three artefacts and a green 'Harvest' box at the exit.

Collaborative Games

A collaborative game is a structured, play-inspired activity run to build a joint understanding of a problem or a solution among the participants in an elicitation. Three traits define it: explicit rules that constrain what participants do and keep them moving toward a specific objective, a visual or tactile artefact that gets handled (notes that are moved around, a whiteboard that is scribbled on, a box that is built) and the frame of the game itself, which gives reserved or junior participants the social permission to contradict a senior stakeholder, expose a gap or float a half-formed idea. The family is open: BABOK names and describes three of these games, the Product Box, the Affinity Map and the Fishbowl, while stating that the list is not limited to them. The frame is common to the whole family; which game to play is decided by the open question.

Goal

The collaborative game addresses one elicitation problem: a decisive share of what stakeholders know is tacit, scattered across groups with different perspectives, and comes out of neither an interview nor a status meeting. An interview yields the answer the person already knows how to phrase. A meeting yields the answer the hierarchy permits. The game shifts register: by imposing rules, a time limit and an object to handle, it forces the group to build something together, and it is in that joint building that hidden assumptions, buried disagreements and needs nobody ever articulated come to the surface.

Three outcomes are targeted, all of them poorly served by conventional elicitation techniques. Circulating tacit knowledge between people who do not talk to each other in ordinary work. Surfacing the assumptions each group treats as obvious and that differ from one group to the next. Building a shared model of the problem or of the possible solutions. BABOK insists on one point: it is the shared experience of the game, as much as the artefact it yields, that makes divergent viewpoints converge.

The deliverable is twofold. There is the artefact: the box that was built, the wall of clustered notes, the observations that were logged. And there is the harvest, meaning the decisions and actions the facilitator and the participants draw from the result together, in the session. That joint determination is part of the technique: a facilitator who leaves with a photo of the wall and writes the synthesis alone has deleted half the deliverable.

Usage

When to use it

  • Divergent assumptions suspected: ordinary discussion will not bring them out, the game puts them on the table.
  • Safe, conventional answers: the meeting mindset throttles divergent thinking, the game releases it.
  • Habitually silent participants: every player holds a role, contributing stops being optional.
  • A business need suspected but never stated: no usual channel has raised it, the game exposes it.
  • Two groups that will not converge: business and IT describe two problems, joint building brings them closer.
  • A decision with real weight: framing an offering, a contested feature prioritisation, the time invested pays back.

When not to use it

  • Playing is seen as unprofessional: the session is disqualified before it starts, run a conventional facilitated workshop.
  • Speaking plainly carries a price: the playful frame protects nobody who exposes a gap, switch to anonymous collection.
  • Low-stakes question: an interview or a document review settles it for a fraction of the cost.

Running a collaborative game

The games in the family differ in their rules, their materials and their objective, and they share one frame: a purpose specific to the game, three steps, a neutral facilitator, a set of explicit rules, an artefact that can be handled and a joint harvest. Understanding that frame is enough to know what you are buying when you call a session, whichever game you pick.

The purpose of the game

BABOK puts purpose first among its elements, and it is specific to each type of game: developing a better understanding of a problem or stimulating creative solutions. That purpose is the question the group has to answer by playing. It is decided before the invitation goes out, because it is what dictates which game gets played. It is stated to the participants at the opening, failing which the group generates ideas without knowing what it is looking for and the closing step has no criterion to sort by. And the facilitator carries it: BABOK writes into the facilitator's job the task of helping participants understand the purpose and work toward realising it, which in session means bringing the group back to the question every time the conversation drifts to another one.

The three steps

BABOK describes a process of at least three steps, each of them usually time-boxed. Timing is the constraint that stops the opening from eating the session and forces the closing to exist at all.

  • Opening: participants get involved, learn the rules and start generating ideas. This is the time of divergence and volume, where you write without judging.
  • Exploration: participants engage with one another, look for connections between their ideas, test them and experiment with new ones. This is where the artefact does its work: you move things, you cluster, you redraw and the physical movement reveals relations that conversation alone leaves invisible.
  • Closing: ideas are assessed and the group works out which are the most useful and productive.
Opening
get involved, learn the rules, generate ideas
Exploration
connect, test, experiment
Closing
assess, retain, decide
Facilitator explain the rules · enforce them · keep the game moving · make everyone play
the artefact varies, the arc does not
Product Box
Affinity Map
Fishbowl
Harvest
decisions and actions, in session
The game's three timed steps and the facilitator who spans all of them: the frame shared by Product Box, Affinity Map and Fishbowl.

The facilitator

The game benefits clearly from a neutral facilitator, and the job comes down to four moves: making the rules understood, enforcing them, keeping the game moving and making sure every participant plays a role. Neutrality is the condition of the whole mechanism. A facilitator with a stake in the result, the product manager whose offering is on the table, the head whose budget depends on the conclusion, destroys the safety the playful frame was meant to create: participants then play to please. When no third party is available, the workaround is to split the roles, a facilitator who runs the session and never speaks to the substance, a sponsor who listens and does not run anything.

The rules and the artefact

The rules are what separates a game from a facilitated conversation. They constrain what participants do (one idea per note, five minutes, nobody speaks during writing, only the inner circle may talk) and that constraint is productive: it equalises speaking time, it enforces concision and it makes disagreement impersonal, since you move a note rather than contradict a person. The visual or tactile artefact works in the same direction through another channel, and it is to handling it, to the acts of moving sticky notes, scribbling on whiteboards and drawing pictures, that BABOK explicitly credits overcoming inhibitions, creative thinking and lateral thinking. The artefact also gives the group a shared external object to look at, one on which disagreement can settle without becoming a conflict between people.

The harvest

The harvest closes the session and turns an artefact into analysable material. The facilitator and the participants work through the result together and name the decisions and actions that follow from it: what goes into the backlog, what becomes a requirement to elaborate, what stays an assumption to validate against data. It happens in session, while the group is still there and still remembers what a note meant. A photo of the wall worked through three days later returns the words, it has lost the reasoning and the disagreement that produced them.

What makes a game fail

An unclear objective

BABOK states this as an explicit limitation: a game whose objectives or outcomes are unclear is perceived as time wasted. The question put to the group is framed before the invitation.

Mistaking consensus for truth

Group participation breeds a false sense of confidence in the conclusions reached. A game produces a shared model, and sharing makes nothing accurate: if nobody in the room holds the information, the group will converge confidently on an error. The output is checked against data or against a domain authority before it grounds a decision.

Selling the game as entertainment

Announced as a bit of fun, the game runs straight into the cultural limitation BABOK flags: it looks silly to reserved participants and loses them. Announced by its purpose (which question it settles, what the group gets out of it), the same game lands.

Letting the closing evaporate

Short of time, the session stops at the end of exploration and the assessment is pushed to later. It never happens. The closing slot is booked in advance and defended, if necessary by shortening exploration.

A badly composed group

A game that assembles a single point of view produces the point of view you already had. The value comes from the collision of different perspectives, which means picking participants for their potential disagreement rather than for their availability.

Choosing the right game

The games in the family share that frame and diverge in the question they answer. A question of vision or of features calls for the Product Box, a question of synthesis over ideas already generated calls for the Affinity Map, a question of perspectives between two groups calls for the Fishbowl.

Those three are the games BABOK names and describes. The family holds many more: the standard states that its list is not limited to them, and the Gamestorming catalogue alone lists dozens. Faced with a game the standard does not name, the rule still holds: identify the open question, then check that the candidate game carries the pieces of the frame. A format that carries only half of them is a facilitated workshop, which remains useful, and you are not buying the same mechanism.

The three games BABOK names: what participants do and the question that decides the choice.
GameWhat participants doChoose it whenWhat comes out
Product BoxThey design and "sell" the product's box as if it were on a retail shelf.The open question is what the offering should be and which features excite a buyer.A benefit-led pitch and the features that carry it.
Affinity MapThey write ideas on notes, post them up, move them closer to similar ones and name the resulting groups.A large volume of ideas or observations already exists and the open question is which themes structure it.Named categories, a structure imposed on a disordered set.
FishbowlAn inner circle discusses a topic, an outer circle listens in silence and logs its observations.The open question bears on the perspectives or assumptions of two groups that do not listen to each other in ordinary discussion.A documented record of assumptions and reasoning, traceable to the group that held them.

AI considerations

AI works usefully downstream of the game. On an Affinity Map, a language model takes the notes photographed or transcribed and proposes candidate clusters and category labels, which the group confirms, merges or refuses: the suggestion accelerates the slowest step without confiscating the judgement about what belongs together. On the harvest, across all games, it condenses the pitch sold around the box, the outer circle's observations or the named clusters on the wall into a clean write-up, usable in a backlog or a model. When the same game is replayed with several groups, a Product Box per customer segment for instance, it compares the outputs and brings out the recurring themes and the divergences between segments.

It also helps upstream. Drafting the facilitation script, the timing of the three steps, the exact wording of the question put to the group and the instructions read out loud is formatting work where the model is fast, provided the purpose of the game itself has been decided by a human who knows what is at stake.

The limit is structural and holds for the whole family. The game's deliverable comprises its artefact and, in equal measure, the shared experience that produced it: the permission granted to the silent participant to speak, the moment two groups finally hear each other's reasoning, the commitment created by having built something together. An AI that produced the box, the clusters or the synthesis without the room would have produced an object stripped of the convergence, which is to say nothing. The facilitator's role falls under the same limit: reading the room, noticing that a participant has been quiet for ten minutes, sensing that the playful frame is making someone uncomfortable, requires a human presence. Fishbowl observation rests likewise on the observer's judgement, catching the implicit assumption at the moment it goes past: an automatic transcript records the words, it lets slip what has just been assumed without being said.

Cost

PhaseLevelJustification
PreparationMediumMaterials and a room to assemble, a neutral facilitator to find and brief on the rules of the chosen game and above all a purpose to frame: an unclear objective is what BABOK names as the failure cause.
ExecutionMedium to highA session with three genuinely timed steps and a debrief fits in 1 to 2 hours, more for a large group: rotating the circles of a Fishbowl or several teams presenting their box in turn.
DocumentationLow to mediumThe artefact largely documents itself (a photographed wall, a box, a list of observations), but somebody has to capture it and carry the harvest into the backlog or the model before the group disperses.

Tooling

The original kit is deliberately poor: a wall or a whiteboard, sticky notes in several colours, markers, flipchart sheets, cardboard, scissors and tape to build a box, chairs arranged in two circles for a Fishbowl. No licence, no platform, no workstation to equip: a collaborative game is run with what a meeting room already holds.

Remote and hybrid, collaborative whiteboards (Miro, Mural, FigJam) carry over the sticky-note metaphor, drag and drop, simultaneous cursors and board persistence, and they ship assisted clustering functions that serve the Affinity Map. They suit games whose core is moving notes around, less so games whose core is a performance in front of the group. A Fishbowl can be approached with a video conference and breakout rooms, provided you impose verbally what the arrangement of the chairs used to impose on its own: who has the floor and who listens. On a workstation locked down to the office suite, Microsoft Whiteboard and Loop carry the sticky note and simultaneous editing and will hold a session.

The mechanism BABOK names is handling the artefact: moving sticky notes, scribbling on whiteboards, drawing pictures, and it is those acts it credits with overcoming inhibitions and lateral thinking. A digital whiteboard preserves them in the main, since notes still get moved and boards still get scribbled on: the engine the standard describes is still turning. What the tool does not reproduce is co-presence, and this observation comes from practice rather than from the standard: seeing a colleague's hand hesitate over a cluster, hearing the group next to you argue, standing in a room with other people, which makes passive withdrawal visible and therefore costly. A remote game thus keeps its main engine and loses part of its social pressure, which is partly offset by a facilitator who calls on participants by name in turn.

Sources

  • IIBA, A Guide to the Business Analysis Body of Knowledge (BABOK Guide) v3, §10.10 Collaborative Games.
  • Gray, D., Brown, S. and Macanufo, J., Gamestorming: A Playbook for Innovators, Rule-Breakers, and Changemakers (O'Reilly, 2010): the background reference on the collaborative-game format.
  • Gamestorming, Design the Box: the Product Box process, adapted from Luke Hohmann's Innovation Games.
  • Gamestorming, Affinity Map: the Affinity Map process and its origin in Jiro Kawakita's KJ method.
  • Gamestorming, Fishbowl: the two-circle format.
  • Hohmann, L., Innovation Games: Creating Breakthrough Products Through Collaborative Play (Addison-Wesley, 2006), the origin of the Product Box. Author's page: Innovation Games, Product Box.
Cohort analysis
All techniques
Communication Models and Methods