Check Sheet
A check sheet is a counting form prepared before data collection. The person who observes the event makes a mark on it each time the event occurs: a defect, an incident, a complaint, a stoppage. The team sets the categories, the period and the way of marking in advance. At the end of the period, the marks give the number of occurrences per category with no copying out. In his Guide to Quality Control, Kaoru Ishikawa teaches it to quality circles. ASQ counts it among the seven basic quality tools. It supplies the data for a Pareto chart or a histogram.
Goal
A check sheet is a counting form prepared before data collection and kept at the workstation. It shows how often an event occurs, in which category, where and when.
ASQ recommends the tool for data collected repeatedly by the same person or at the same location: frequencies of events, defects, causes or defect locations.
The sheet helps the team choose which category to tackle first. The deliverable is the completed sheet: the header, the grid of marks and the totals. Those totals are the data table for the Pareto chart or the histogram that follows.
Usage
When to use it
- No system counts the event: count it at the workstation.
- Before a Pareto chart: supply the number of occurrences per category over a defined period.
- Before a histogram: enter each measurement in its bin at the moment it is taken.
- Hypothesis to check: one to two weeks of marks confirm or rule out "it's mostly on Mondays".
- Measure phase of a DMAIC: establish the baseline.
- After an improvement: keep the same sheet over a period of the same length and compare the totals.
When not to use it
- The system already records the category: extract the data, then draw the Pareto chart.
- Rare and serious event: the sheet stays empty. Analyse each case with a root cause analysis.
- The order of the measurements matters: the sheet by value bin loses that order. Plot a control chart.
Description
The elements of the sheet
The header states what is counted, who records it, where and over what period. The definition says what counts as one occurrence: "an invoice that the ERP import rejects and that someone processes by hand". ASQ calls this sentence an operational definition. Without it, one person counts the event and another ignores it.
On the back of the sheet, the team writes the definition of each category and its threshold. For "Amount mismatch with order": the invoice total including VAT differs from the order total by more than CHF 5. A smaller difference passes and gets no mark.
The grid sets the categories against the periods: reasons in rows, days or hours in columns. Each cell receives one mark per occurrence. On a sheet with a single kind of mark, the strokes are grouped in fives: the fifth crosses out the first four. The reader then sees each cell's count without recounting.
An Other row collects what the list did not foresee. The person writes the reason in words next to the mark.
The totals close the grid: a total per row, a total per column and the grand total. The sum of the rows checks the sum of the columns: both give the same grand total.
The team fixes the header, the categories and the Other row before the first mark.
| Subject | Supplier invoices rejected on import into the ERP and processed by hand |
|---|---|
| Occurrence | One mark per invoice processed by hand. Invoice with several reasons: mark the first blocking reason |
| Reasons | Definition of each reason on the back |
| Marks | X: carrier. |: other supplier |
| Recorded by | Accounts payable at the rejection-handling desk |
| Period | Week 41 (Monday to Friday) |
| Rejection reason | Mon | Tue | Wed | Thu | Fri | Total X | Total | | Total |
|---|---|---|---|---|---|---|---|---|
| Amount mismatch with order | ||||||||
| Order number missing | ||||||||
| QR code unreadable | ||||||||
| Wrong VAT rate | ||||||||
| Duplicate | ||||||||
| Unknown supplier | ||||||||
| Other (write the reason) | ||||||||
| Total |
Designing and keeping the sheet
- Choose the event and define it. Write the operational definition of the event and of each category. An occurrence falls into one category only. When several reasons apply, a written rule decides. The team can take the first blocking reason.
- Set the period. A week shows the differences between days. A month covers an accounting close. The team also sets the length to suit the analysis that follows: a sheet by value bin runs long enough for the crosses to draw the shape of the distribution. A sheet with no end date dies without anyone deciding to stop it.
- Draw the sheet. Lay it out so that one mark records one occurrence and nothing is copied out before the analysis. Put the categories the team expects most often at the top.
- Label every box. Title, categories, periods, legend for the marks: the person recording has nothing to guess.
- Test the sheet. Run it on trial for a few days. Check that it collects the intended data and that it is quick to fill in. Correct the categories, then start again from a blank sheet.
- Mark at each occurrence. The person makes the mark when the event occurs.
The six steps are ASQ's. The rule for multiple reasons, the order of the categories and the length of the period come from practice. The trial saves the team from discarding a whole period of data. It shows the category nobody foresaw, the box that is too small and the definition that two people read two ways.
Stratify before counting
Data mixed from several sources hide their structure. ASQ recommends deciding before collection which information about the source may affect the result. The sheet records that information along with the event. ASQ names these sources: equipment, shift, department, material, supplier, day of the week, time of day and product. Nancy Tague warns that once the data are collected, it may be too late to separate them.
On the sheet, one column per source separates the marks: shift, machine or channel. A different mark per source also tells them apart within one cell: a cross for a carrier, a stroke for any other supplier. ASQ applies the same principle to charts: one mark or one colour per source.
The days in columns already stratify by day of the week. One more source costs a column or a symbol. Forgetting it costs a second round of data collection.
Forms of the sheet
The sheet by category counts the occurrences of each reason. It feeds the Pareto chart.
The sheet by location carries a drawing of the object observed: a part, a form, a screen. The person marks the spot where the defect appears. The marks cluster where the defect originates. ASQ also calls the tool a defect concentration diagram. That name describes this form.
The sheet by value bin splits the range of a measurement into bins: a lead time in days, a weight, a duration. For each measurement, the person adds a cross in its bin. The columns of crosses draw the shape of the distribution during collection. The number of crosses in each bin gives the height of the matching histogram bar. The sheet loses the order of the measurements.
Check sheet, checklist and special purpose records
A checklist lists steps to tick off once they are done. A check sheet counts events. The similar names lead readers to confuse the two tools.
The special purpose records technique rests on the same mechanism: a form prepared before collection and filled in where the event occurs. The question differs. Counting defects calls for a check sheet. Measuring workload or durations calls for special purpose records.
| Check sheet | Checklist | Special purpose records | |
|---|---|---|---|
| Question | How often does a problem occur, where and for what cause? | Are the planned steps done? | How much work, of what type, in how much time? |
| What is recorded | One mark per occurrence in a category defined in advance | One tick per completed step | The volume, type and duration of tasks |
| Next step | A Pareto chart or a histogram | The rest of the work | Sizing or describing the process |
Common mistakes
Marking from memory. A sheet filled in at the end of the day holds estimates. Its value depends on the memory and diligence of the people who keep it. ASQ's rules reduce this risk without removing it: an operational definition, a trial period, a mark at each occurrence. The analyst measures the gap with a few half-days of observation at the workstation and compares what they see with the marks for the same half-days.
Changing the categories during collection. A category added on Wednesday has no Monday. The week's totals no longer compare with one another. The team corrects the sheet during the trial. After that, the sheet stays the same until the end of the period.
Letting the Other row grow. When the Other row rivals the most frequent categories, the list does not describe the problem. The team reads the reasons written in words and draws from them the recurring categories for the next period.
Copying out. Each copy adds work and errors. Only the totals go into the spreadsheet.
Counting one occurrence twice. An invoice with two reasons gets two marks if no rule decides. The total then exceeds the number of invoices. The team writes the rule in the header.
Recording names. A sheet that records who made the error ends up empty: people stop marking. The sheet records the event and the source useful to the analysis: the supplier, the channel, the workstation. The name of an employee is personal data. So is the name of a customer who is a natural person. The FADP allows processing such data only as far as the purpose requires (Art. 6 para. 2 and 3 FADP).
AI considerations
A language model drafts a first list of categories and their definitions from 200 free-text rejection comments taken from the ERP. The team corrects the list with the people who will keep the sheet. It keeps the Other row.
From that list, the model produces the sheet in a spreadsheet or an online form. It sorts the reasons written in words on the Other row into the categories. The analyst checks every assignment: an Other row holds a few dozen cases.
The model does not replace the mark at the workstation. A sheet reconstructed afterwards from memory or a rough estimate gives figures that are plausible and wrong.
Rejection comments often contain the names of employees or of contact persons at suppliers. These are personal data. The team sends them to an external AI service only under a data processing agreement (Art. 9 FADP). If the provider processes the data outside Switzerland, the Federal Council must recognise the destination state as adequate. Otherwise, standard data protection clauses must cover the transfer (Art. 16 FADP).
Examples
Accounts payable processes by hand every invoice that the ERP import rejects. For each rejection, the ERP keeps a free-text comment and no coded reason. For one week, the person who processes an invoice marks the row for its reason: a cross if the supplier is a carrier, a stroke otherwise.
The sheet counts 46 rejections. The amount mismatch with the order accounts for 19 of them. Carriers account for 13 of the 46 rejections (28%). They account for 11 of the 19 amount mismatches (58%). As early as the first week, the cross planned into the sheet shows where to look: the amounts that carriers invoice. Without it, the team would have had to run a second collection or reopen the 46 rejected invoices to find the 19 mismatches and their suppliers.
Visualisations
The completed sheet and its forms are drawings: the position and number of the marks carry the information. The blank sheet, the comparison with related tools and the cost are made of rows and columns, so they are tables.
Cost
| Dimension | Level | Justification |
|---|---|---|
| Preparation | Medium | Categories and a definition to write with the people at the workstation. A few days of trial before the counted period. |
| Execution | Low | A mark takes a few seconds. The load comes from the length of the period. |
| Documentation | Low | The completed sheet is the deliverable. Its totals go into a spreadsheet in a few minutes. |
Tooling
A sheet of paper on a clipboard is enough in most cases. It stays at the workstation, needs no screen and requires no IT account. The sheet by location starts from a printed drawing of the part or a screenshot of the form.
A shared spreadsheet or an online form (Microsoft Forms, Google Forms) suits a team spread over several sites. Each entry carries the date and time: stratification by day and by hour costs nothing. Entry requires a screen at the workstation and takes longer than a mark.
In an IT department, a ticketing tool such as Jira or ServiceNow does the same job with a mandatory category field. The list for that field follows the rules of the sheet: written definitions, an Other value, a fixed analysis period.
Sources
- Kaoru Ishikawa, Guide to Quality Control, Asian Productivity Organization (original Japanese edition, 1968): the check sheet among the basic quality tools that the book teaches to quality circles.
- ASQ, "Check Sheet": the definition, the conditions of use, the procedure and the name defect concentration diagram.
- ASQ, "What is Stratification?": the decision taken before collection, the data sources to record and one mark or colour per source.
- Nancy R. Tague, The Quality Toolbox, 2nd edition, ASQ Quality Press, 2005: the check sheet, stratification decided before collection and the data sources to record.