Your Training Partner
Techniques Toolbox
Strategy canvas of the circus. The horizontal axis lists the competing factors: price, star performers, animal shows, aisle concession sales, the three-ring show, slapstick humour, acrobatic acts, the tent and comfort, theme and storyline, original music and dance, multiple productions. The vertical axis shows the offering level from low to high. It has no numeric scale. The traditional circus curve is high on stars, animals, concessions, three rings, slapstick humour and acrobatic acts. It sits at zero on theme, original music and multiple productions. The Cirque du Soleil curve drops to zero on the eliminated factors. It falls on slapstick humour and acrobatic acts. It rises on price, the tent, theme, music and multiple productions. Under each factor except price, a tag names the ERRC grid action.

Blue Ocean Strategy

Blue Ocean Strategy is a strategic analysis method that designs an offering for a market nobody occupies yet. W. Chan Kim and Renée Mauborgne presented it in 2004 in the Harvard Business Review. It rests on the strategy canvas and the ERRC grid (eliminate, reduce, raise, create). The canvas compares the offering level of an industry with that of a new offering on each factor. The grid states which factors the new offering drops, scales back, strengthens or introduces. The intended offering lowers costs and raises buyer value at the same time.

Goal

An organisation uses Blue Ocean Strategy to design an offering that creates its own demand instead of fighting competitors for existing demand. Kim and Mauborgne call the industries that exist today red oceans. Their boundaries are known. Blue oceans are the markets that do not exist yet.

A management team applies the method to settle the profile of a new offering before it commits the budget or when the offerings in its industry have converged. The deliverable consists of a strategy canvas and an ERRC grid.

Kim and Mauborgne reject the trade-off between value and cost. In conventional strategy a company chooses between two positions: more value at a higher cost or reasonable value at a lower cost. The authors call it value innovation when a company pursues differentiation and low cost at the same time. For the buyer, value is utility minus price. For the company, value is price minus cost. According to the authors, value innovation succeeds only when utility, price and cost align.

Kim and Mauborgne base the method on more than 150 blue ocean creations observed in more than 30 industries over more than a hundred years. In their study of 108 companies, 14% of launches targeted a new market. These launches produced 38% of revenue and 61% of profits.

Porter's Five Forces analysis examines the structure of an existing industry. Kim and Mauborgne call the view that takes this structure as given "structuralist". They contrast it with a reconstructionist view: the players in an industry move its boundaries. Burke, van Stel and Thurik compared Blue Ocean Strategy with competitive strategy on data from Dutch retail. They observe that the two overlap. A management team therefore does not have to choose between them. We place the method after the Ansoff Matrix. The matrix chooses the product-market combination for growth. Blue Ocean Strategy then designs the offering for that combination.

Usage

When to use it

  • Offerings that look alike: competitors fight on price. Look for the factors to drop and the factors to create.
  • Stagnant or shrinking demand: look for the industry's noncustomers and what they have in common.
  • Offering that overserves buyers: the industry adds services that buyers are no longer willing to pay for. Look for what to reduce.
  • New offering before its budget is approved: check that its value curve diverges from the competitors' curves.
  • Public service under budget pressure: raise the service that users receive by dropping factors they do not value.

When not to use it

  • Judging the attractiveness of an existing industry: the question concerns the competitive pressure in a given market. Use Porter's Five Forces instead.
  • Allocating resources across existing businesses: the question concerns the current portfolio. Use the growth-share matrix instead.

Description

The strategy canvas and the value curve

The strategy canvas is a chart with two axes. The horizontal axis lists the factors on which the industry competes and invests: price, service, range, delivery speed. The vertical axis shows the offering level that the buyer receives on each factor. The value curve connects the levels of one player. Kim and Mauborgne define it as a company's relative performance across its industry's factors of competition.

The canvas first shows the state of the market: the industry's factors and those in which each competitor invests. Competitor curves that overlap signal a red ocean. The canvas then turns the team towards alternatives rather than competitors and towards noncustomers rather than customers.

The canvas describes one offering. According to the authors, the unit of analysis is the strategic move: the set of decisions that launch a market-creating offering. A bank that studies its mortgages draws a canvas for this product and leaves its other businesses off the chart.

The four actions and the ERRC grid

The four actions framework questions each factor of the industry.

  • Eliminate: which factors that the industry takes for granted should be eliminated? The question targets factors that no longer add value or that take value away.
  • Reduce: which factors should be reduced well below the industry's standard? The question targets services that exceed what buyers need because competitors kept adding more to outdo each other.
  • Raise: which factors should be raised well above the industry's standard? The question targets the compromises that the industry forces on the buyer.
  • Create: which factors has the industry never offered? The question targets new sources of value that attract noncustomers.

The ERRC grid sorts the answers into four boxes. According to the authors, the grid forces the team to act on the four questions as well as ask them. The Eliminate and Reduce boxes drive the cost reduction. The Raise and Create boxes drive the increase in buyer value.

Eliminate
Which factors that the industry takes for granted should be eliminated?
Reduce
Which factors should be reduced well below the industry's standard?
Lower costs
Raise
Which factors should be raised well above the industry's standard?
Create
Which factors has the industry never offered?
Higher buyer value
Value innovation
The four actions framework. The Eliminate and Reduce actions lower costs. The Raise and Create actions increase buyer value. Value innovation combines the two effects.

Casella Wines applied the grid to wine sold in the United States. The [yellow tail] brand removed oenological jargon from its labels and eliminated ageing potential. It reduced the complexity of the taste. It created a wine that is easy to drink and easy to choose. It started with one chardonnay and one shiraz. This two-wine range reduced inventory.

We relate the grid to value chain analysis. An eliminated factor lowers costs when the activities that produce it disappear. Value chain analysis locates these activities and their cost.

Looking beyond the industry's boundaries

The six paths framework challenges six assumptions that the competitors in an industry share.

PathHead-to-head competition looks atBlue ocean creation looks at
Industrythe rivals within the industryalternative industries
Strategic groupthe company's position within its strategic groupthe industry's other strategic groups
Buyer groupthe buyer group that the industry servesa redefined buyer group
Scope of the offeringthe value of the product within the industry's boundscomplementary products and services
Functional or emotional orientationthe price-performance ratio within the industry's orientationa new functional or emotional orientation
Timeadapting to external trendshow the offering shapes external trends
Kim and Mauborgne's six paths: what head-to-head competition looks at and what blue ocean creation looks at.

An alternative industry meets the same buyer need in another form: for an evening out, the circus, the theatre and the opera are alternatives. Ford set the price of the Model T against the horse-drawn carriage (USD 400) rather than against other cars. The price of the Model T fell from USD 850 in 1908 to USD 290 in 1924. In 1924 the Model T cost less than the carriage Ford had taken as its benchmark.

A strategic group brings together the companies in an industry that follow a similar strategy. The founders of citizenM asked why frequent travellers chose a luxury hotel over a three-star hotel. They then asked the reverse question. Those who chose luxury paid for the sense of luxury, sleeping comfort and the location. Those who chose the three-star hotel looked at price first and often found luxury hotels too formal. Both groups saw little value in the reception desk, the concierge service and the porters. The chain eliminated them.

The buyer group path asks whom the industry treats as the buyer and who else takes part in the purchase. The offering scope path examines what the buyer uses before, during and after the product. The orientation path asks whether the industry mainly sells a function at a price or mainly an emotion. It examines what becomes of an offering that crosses to the other side. The time path starts from an external trend that is already certain and asks how it changes buyer value.

Kim and Mauborgne sort noncustomers into tiers by their distance from the current market.

First tier: soon-to-be noncustomers
buy the minimum and are ready to leave
Second tier: refusing noncustomers
have considered the offering and refused it
Third tier: unexplored noncustomers
have never considered the offering as an option
The tiers of noncustomers around the current market. The further the ring lies from the centre, the further the noncustomer stands from the industry's offering.

In the first tier, soon-to-be noncustomers buy the minimum out of necessity and will leave the industry at the first opportunity. In the second tier, refusing noncustomers have considered the industry's offering and refused it. In the third tier, unexplored noncustomers have never considered this offering as an option. The authors advise looking for what these noncustomers and current customers have in common instead of segmenting more finely. Cirque du Soleil attracted adults and corporate clients who went to the theatre, the opera or the ballet. This audience paid several times the price of a circus ticket.

The buyer utility map completes the search. The map is a grid of six stages of the buying experience against six utility levers. The stages are purchase, delivery, use, supplements, maintenance and disposal. The levers are productivity, simplicity, convenience, risk reduction, environmental friendliness as well as fun and image. The team places the new offering and the industry's offerings on the map. An offering that occupies the same cells as the others opens no space.

Testing the new curve

According to the authors, a strong value curve shows focus, divergence and a tagline. A focused curve concentrates effort on a few factors. A divergent curve departs from the industry's curve. The tagline sums up the profile in a clear and truthful message. For the urban cable car of Medellín (Metrocable), the proposed tagline is "the price of a bus, the convenience of a train, the fun of an amusement park". A curve that no such sentence can capture still mixes several strategies.

Running the process

We arrange the authors' tools into a workshop sequence. The analyst facilitates a group that brings together management, sales, customer-facing staff and finance staff who put figures on the costs. Kim and Mauborgne call for fair process from the moment the strategy is formulated. It rests on three principles: involving the people affected in the decisions, explaining the decisions and clarifying expectations. According to the authors, none of these principles is enough without the other two.

  1. Scope the offering
    The group names the offering under study, its direct competitors and the alternatives that buyers turn to in its place.
  2. Draw the industry curve
    The group lists the factors on which the industry competes, in the buyer's words. It rates each player's offering level on a relative scale, then draws the curves. About ten factors are usually enough.
  3. Look beyond the boundaries
    The group works through the six paths, the three tiers of noncustomers and the buyer utility map. Interviews with noncustomers and observation of them feed this step.
  4. Fill in the ERRC grid
    The group assigns each factor one of the four actions or leaves it unchanged. It adds the created factors to the list.
  5. Draw the new curve and test it
    The group draws the target curve on the industry canvas. It tests the curve for focus, divergence and tagline. Finance checks that the target price covers the cost of the offering.
  6. Decide and explain
    Management chooses the target curve. It explains its decision to the teams that will carry it out, then sets what it expects of each.

Pitfalls

A team that builds the new curve by comparing itself with competitors gets a curve parallel to theirs. According to Kim and Mauborgne, blue ocean creators never use the competition as their benchmark. The six paths step corrects this reflex.

A grid filled in only in the Raise and Create boxes adds value and cost. The offering becomes more expensive and joins the industry's race to offer more and more. The team funds each raised or created factor with an eliminated or reduced factor.

A factor written in the company's language describes what the company produces. A factor phrased from the buyer's point of view describes what the buyer receives. "Modular platform" is an internal factor. "Installation time" is phrased from the buyer's point of view.

An organisation that has no data on its buyers and noncustomers draws a canvas of its beliefs. It conducts interviews and observations first.

According to the authors, blue oceans rarely arise from technological innovation as such. The underlying technology often existed already. The Metrocable of Medellín reuses the chairlift technology of ski resorts. A team that waits for a technical breakthrough before it starts the process is looking in the wrong place.

According to the 2004 article, most blue oceans arise within existing industries. Established companies often create them. They usually do so in their core business. A team that rules out its own industry from the start therefore rules out the place where most blue oceans appear.

AI considerations

A language model proposes a first list of competing factors from customer reviews, product comparisons and sales documents. For each factor, it drafts candidates for the four actions. It widens the search beyond the known competitors when it lists alternative industries and complementary products. It sorts interview notes by tier of noncustomers and picks out what these people have in common. Finally it compares the tagline with the curve and flags the factors that the tagline leaves out.

The model reproduces the dominant discourse of the industry, since it learned from that discourse. Its factors are the competitors' factors. Its new curve converges towards theirs. It cannot know why a particular noncustomer refuses the industry's offering: only interviews and observation reveal that. It can produce invented market shares and prices. The analyst checks every figure at its source. The cost of an eliminated or created factor depends on the company's activities, which the model does not know. Interview notes that identify a person are personal data under the Federal Act on Data Protection (FADP). The analyst anonymises them before passing them to an external service.

Examples

We sort the Cirque du Soleil decisions that the 2004 article describes into the grid.

ActionCirque du Soleil factors
EliminateStar performers. Animal shows. Aisle concession sales. Three-ring show.
ReduceSlapstick humour of the clowns. Share of the show given to the acrobatic acts.
RaiseExterior finish of the tent. Audience comfort without sawdust or hard benches.
CreateA theme and storyline for each show. Original music. Abstract and spiritual dance. Multiple productions on different themes.
ERRC grid of Cirque du Soleil based on Kim and Mauborgne's article (2004).

The canvas lays the Cirque du Soleil curve over that of the traditional circus. We set the levels from the decisions that the article describes.

Traditional circus Cirque du Soleil
HighOffering levelLow
Price
Star performersEliminate
Animal showsEliminate
Aisle concession salesEliminate
Three-ring showEliminate
Slapstick humourReduce
Acrobatic actsReduce
Tent and comfortRaise
Theme and storylineCreate
Original music and danceCreate
Multiple productionsCreate
Competing factors
Strategy canvas of the traditional circus and Cirque du Soleil. Under each factor except price, the tag names the ERRC grid action. The levels are qualitative.

The Eliminate and Reduce actions remove costly items from the circus. Animals require training, care and transport. Stars demand fees. The three-ring show requires more performers. The Raise and Create actions bring the theatre experience that justifies the higher price.

Visualisations

The analyst first presents the strategy canvas: the industry curve in one colour, the target curve in another, the created factors at the end of the axis. A tag under each factor names the ERRC grid action. The grid follows in four columns or four rows. The analyst draws the three tiers of noncustomers as rings around the current market. This drawing shows how far from the current market the target offering goes to find its buyers.

Cost

PhaseLevelJustification
PreparationHighInterviews and observations with customers and noncustomers. A survey of what competitors and alternatives offer.
ExecutionMediumOne or two workshops of half a day to a day to draw the curves, fill in the grid and test the target curve.
DocumentationLowOne canvas and one grid on a single page. The business case then puts figures on the costs and the price.

Tooling

In the room, a whiteboard or a flipchart holds the canvas. Sticky notes hold the factors. The group moves them from one box of the grid to another. Remotely, a collaborative whiteboard (Miro, Mural, FigJam) plays the same role.

A spreadsheet holds each player's levels per factor and draws the curves as a line chart. It keeps the ERRC grid and the costing of the factors. An online questionnaire extends data collection to noncustomers once the interviews are done.

Sources

  • Kim, W. C. and Mauborgne, R. (2004), Blue Ocean Strategy, Harvard Business Review, Vol. 82, No. 10: the article that presents the method, red and blue oceans, the Cirque du Soleil case and the Model T case.
  • Kim, W. C. and Mauborgne, R. (2021), Blue Ocean Tools and Frameworks: the authors' definitions of the strategy canvas, the four actions, the six paths, the three tiers of noncustomers and the buyer utility map.
  • Four Actions Framework and Eliminate-Reduce-Raise-Create Grid (Examples + Template), blueoceanstrategy.com: the four questions with commentary, with the [yellow tail] and citizenM cases.
  • Strategy Canvas Examples, blueoceanstrategy.com: the three characteristics of a value curve, with the case of the Medellín Metrocable.
  • Fair Process, blueoceanstrategy.com: the three principles of fair process.
  • Burke, A., van Stel, A. and Thurik, R. (2010), Blue Ocean vs. Five Forces, Harvard Business Review, Vol. 88, No. 5, pp. 28-29: a test of the method on data from Dutch retail.
Black-Box Testing
All techniques
Bottom-up Estimation