Your Training Partner
Techniques Toolbox
The biomimicry design spiral. Six steps follow one another in a loop: Define, Biologize, Discover, Abstract, Emulate and Evaluate. Each step carries what it produces: the "How might we…?" question, the "How does nature…?" questions, the natural models and their strategies, the design strategies, the concepts and then the evaluated concept. Arrows lead back from each step to the earlier steps. An orange arrow leaves Evaluate.

Biomimicry

Biomimicry is a design method that looks to living things for how to perform a function. The team states what its solution must do. It looks for the organisms that do the same thing, translates their strategy into technical terms and draws concepts from it. Janine Benyus popularised the term in 1997 with her book Biomimicry: Innovation Inspired by Nature. She defines biomimicry as "the conscious emulation of life's genius". The Biomimicry Institute, which she co-founded, describes the process in a six-step design spiral.

Goal

Biomimicry is a design method that takes living things as its model. The team borrows the strategy an organism uses to perform a function, then transfers it to a product, a process or a system.

Without biomimicry, a team looks for solutions in its own field. A team that wants "a better bicycle helmet" compares helmets. A team that wants "to protect a cyclist's head in a crash" can study every organism that protects itself from impact. Biomimicry forces this shift from the object to the function. The team then searches the biological literature and translates the biology into technical terms.

Biomimicry supports one decision: which concept to prototype. It produces "How does nature…?" questions, biological strategies with their sources and design strategies stripped of biological terms. The last output is a set of evaluated concepts. These outputs follow from the activities and worksheets that the Biomimicry Institute describes.

Usage

When to use

  • A function that a product, process or system must perform: cool, filter, harvest water, absorb an impact, redistribute surpluses.
  • Ideas that keep circling the same solution: the biologized question takes the team out of its field.
  • Energy or material criteria in the specification: the checklist of nature's unifying patterns evaluates the concepts.
  • Definition or ideation phase of a design thinking project: the steps of the spiral fit into it.

When not to use

  • A few hours to find ideas: biological research and abstraction take days; use brainstorming or SCAMPER instead.
  • No access to a biologist or to the scientific literature: nobody can check the biological strategy; look for solution principles with TRIZ.
  • Solution already set by the mandate: biomimicry opens the solution space; validate the chosen solution through prototyping.

Description

Function, strategy and context

The function is what a thing does. For an organism, it is the role of an adaptation or a behaviour that helps it survive. For a design, it is what the solution must do. A biological strategy is a feature, mechanism or process by which an organism performs a function. The context covers the conditions in which the strategy operates. For the organism, that is its habitat. For the design, it is the place, the use and the users.

Function separates biomimicry from biomorphic design, which copies the forms of living things. A leaf-shaped façade imitates a form. A façade that regulates its temperature as an organism does imitates a strategy.

A strategy that works in one habitat can fail in another. The team compares the context of the organism with the context of its design before it adopts a strategy.

The design spiral

The Biomimicry Institute describes the process in six steps: Define, Biologize, Discover, Abstract, Emulate and Evaluate. It presents them in order as a starting point. The team still goes back as soon as a step calls an earlier assumption into question. The team evaluates several times during the process and applies more rigour each time.

The Biomimicry Institute's design spiral. Each step produces what the next step uses. The team goes back to an earlier step from Evaluate or from any other step as soon as a result calls an assumption into question.

1. Define

The team writes down what the design must do, for whom and in what context. It does not yet choose what it will build. It states the problem in one sentence that begins with "How might we…?". It notes the criteria and constraints that will decide success.

Context sharpens the question: the needs of the stakeholders, the place and the conditions of use. Too little context leaves the question too broad. Too many constraints cut the number of solutions. "How can we make cycling safer?" targets nothing. "How can we make better lights for cyclists?" assumes that a light is the solution. "How might we make urban cyclists more visible to drivers at night?" sets the context and leaves the solution open. For this question, the team might set criteria such as a minimum visibility distance, no battery to recharge and a capped unit cost.

The trap in this step is the question that names an object. For a fan, the team asks nature how it moves air or how it cools. The verb that completes the question is the function that the team will look for in living things.

From the object to the function, then to the biologized question. Examples from the Biomimicry Toolbox.
Question that names the objectFunction to performBiologized question
How can we make better lights for cyclists?Make urban cyclists visible to drivers at nightHow does nature enhance visibility in low light?
How can we design a bicycle helmet?Protect a cyclist's head in a crashHow does nature protect from impact?
How can we make a fan?CoolHow does nature cool?

For a complex problem, the team maps the system: its boundaries, its links with neighbouring systems and its leverage points. It then picks a precise problem with clear limits. The Biomimicry Toolbox provides the Define the Challenge and Systems Explorer worksheets for this.

2. Biologize

Biologizing translates the design question into questions that biology can answer. The test: the question must complete the phrase "How does nature…?". "How does nature make urban cyclists more visible?" makes no sense. "How does nature enhance visibility in low light?" opens a search.

The team names the functions and the context in biological terms. For the cyclists, the Toolbox lists the functions enhance visibility, produce light, reflect light and sense and send signals. The context is low light in a chaotic environment where everything moves fast. Each combination yields a question: enhance visibility in low light, enhance it in a chaotic environment, sense movement in the dark.

The Biomimicry Taxonomy supplies the vocabulary of functions. It sorts more than 160 functions into 30 sub-groups and eight groups. In a very arid climate, the Namib desert beetle collects water from the air with the nanoscale bumps on its wing covers and with the position of its body. The taxonomy files this strategy under the group "Get, store, or distribute resources", the sub-group "Capture, absorb, or filter resources" and the function "Capture, absorb, or filter liquids". AskNature sorts its strategies by this taxonomy.

A single question narrows the search. The team writes several. It also turns the question around: a team that wants to retain a liquid asks how nature repels liquids. Similar mechanisms often control the movement of the liquid in both cases. The taxonomy guide applies these ways of questioning to a building that must capture and store rainwater in an area of low rainfall.

Writing the "How does nature…?" questions for a building that captures and stores rainwater. Example from the Biomimicry Taxonomy guide.
Way of questioningWhat the team doesHow does nature…
Verbs of the problemIt takes the verbs that define the problem.capture water? store water?
Related conceptsIt looks for verbs and nouns close to the goal.absorb water? capture fog? manage humidity? move water?
Reversed questionIt asks the opposite of the goal.remove water? stay dry?

The Toolbox asks the team to take the time this step needs: a poorly biologized question sends the search to the wrong organisms.

3. Discover

The team looks for the organisms and ecosystems that perform the same function in a comparable context. For each one, it notes the strategy that keeps it alive. It aims for a large and varied set of natural models: several species, several habitats, several scales.

The Biomimicry Institute's AskNature database is the entry point because it is organised by function. According to the Toolbox, it holds about 1'800 strategy pages. The Toolbox admits that this number falls far short of the diversity of life. AskNature's summaries also lack the detail needed to emulate a strategy exactly. The team reads the scientific literature (Google Scholar, for example) and checks the credibility of each source. It also observes the organisms around it and keeps a nature journal. The journal needs no talent for drawing. The team consults biologists and naturalists (a university, a natural history museum, a zoo) throughout the process. It keeps the source of every piece of information, since the next step goes back to it.

The trap in this step is second-hand biology. A popular-science article, a web page or a language model can simplify or distort a mechanism. A misunderstood biological strategy yields a false design strategy. The team goes back to the original paper and asks a biologist to check its reading.

4. Abstract

The team translates each biological strategy into a design strategy. A design strategy is a statement and a sketch that describe the function and the mechanism without biological terms. An engineer or an analyst can then work on the strategy without knowing the organism. The Toolbox counts this step among the hardest in the process.

  1. Summarise the biological strategy. The summary says how the strategy performs the function in its context. In a scientific paper, the team reads the abstract, the conclusion, the discussion and then the introduction. It checks the measurements in the original research.
  2. Draw the biological strategy. The sketch shows what the team has not understood.
  3. Pick out the keywords. The team underlines the words for the function and the mechanism. It replaces each biological term with a neutral synonym: "fur" becomes "fibres", "skin" becomes "membrane".
  4. Write the design strategy. The statement reuses these words without biological terms and stays true to the science. It is the starting point for brainstorming. It describes the strategy. The solution comes later.
  5. Draw the design strategy. The diagram shows a mechanical system or a process. It keeps the functional elements and removes every biological part.
  6. Review the design strategy. Does the statement keep the lesson that drew the team to the organism? Does it bring a new idea or confirm a known solution?

A design strategy that keeps biological terms speaks only to biologists. A strategy that already names a product closes the search for ideas. The review also catches a strategy that only confirms a known solution. The team can then go back to Discover to look for other models.

5. Emulate

Emulating turns design strategies into concepts. The team takes the "recipe" of a strategy and applies it to its own design.

The team first lays the strategies out in a table or a diagram and sorts them by context, constraint or mechanism. It looks for patterns that several strategies share. It then holds each strategy against the question from the Define step: how can this strategy guide the solution? It notes every idea before it analyses any. The team generates ideas through brainstorming, mind mapping and sketches. The Toolbox refers to the ideation methods in IDEO.org's Design Kit. Last, the checklist described under Evaluate helps the team place each concept in the wider system.

6. Evaluate

The team judges each concept against the criteria and constraints set in the Define step. It also judges how the concept fits into Earth's systems and whether it is technically and commercially feasible.

It examines the whole system: the flows of materials and energy, human behaviour, neighbouring systems. It names the barriers: technology, cost, materials, regulation, culture. It sketches the route to market, for example with the Business Model Canvas that the Toolbox cites. It builds a prototype. At first, a rough prototype that does not need to work is enough: a drawing, a storyboard, a cardboard model. It interviews users, stakeholders and experts in the field.

The Toolbox draws ten statements from the Life's Principles of Biomimicry 3.8. It calls them nature's unifying patterns. The team uses them as an evaluation checklist. According to the Toolbox, nature:

  • uses only the energy it needs
  • recycles all materials
  • is resilient to disturbances
  • optimises rather than maximises
  • provides mutual benefits
  • runs on information
  • uses chemistry safe for living beings
  • builds with abundant resources
  • is locally attuned and responsive
  • uses shape to determine functionality

The team then goes round the spiral as many times as the results require. The Toolbox warns that many biomimetic concepts need years of iteration before they succeed commercially.

The reverse pathway: from biology to design

The spiral starts from a problem. The Toolbox also describes the reverse pathway: an inventor notices a mechanism in nature, then finds an application for it. The Swiss engineer George de Mestral was pulling burdock seeds from his dog's fur after a walk. Their hooks gave him the model for Velcro.

Biomimicry within another process

The Toolbox fits biomimicry into design thinking. The define stage names the function and the context, then frames the questions for biology. Ideation searches biology, translates the strategies and consults the checklist of nature's unifying patterns. Testing checks that the design respects living systems. The Toolbox applies the same mapping to the engineering design process that NASA publishes for educators.

Biomimicry, synectics and TRIZ

William Gordon's synectics compares the problem with facts from other fields through direct analogy. Gordon drew mostly on biology. Biomimicry draws only on living things and equips that search with a database organised by function, a taxonomy of functions and a step that removes biological terms before design starts. Synectics compares the analogy with the problem during the session. Biomimicry checks the analogy against the literature and has a biologist review it.

TRIZ draws its solution principles from the analysis of patents. Biomimicry draws its strategies from organisms. Both methods leave the particular problem for a generic solution, then return to it.

AI considerations

A language model helps in the Define and Biologize steps. It proposes "How might we…?" rewordings and flags a question that already names the solution. It turns one design question into several "How does nature…?" questions, including reversed ones. It also proposes candidate organisms for a function.

It sometimes invents the biology it cites: a mechanism, a measurement or a reference. The team treats each proposed organism as a lead. It finds the paper that describes the mechanism and asks a biologist to check its reading.

In the Abstract step, the model replaces biological terms with neutral synonyms and drafts a first design strategy. The team compares this draft with the paper. It keeps the review in the sixth sub-step for itself: to judge whether a strategy brings a new idea, it must know the solutions in its field.

A design problem that is still confidential often describes an invention. The team submits it only to a service that the organisation has approved.

Examples

The abstraction table shows the move from a biological strategy to a design strategy, then the review of that strategy. The problem concerns equipment cabinets that stand in full sun. The biological strategy is the jackrabbit's, which the Biomimicry Toolbox describes. Jackrabbit is the name of the large hares of western North America.

Abstraction table for cooling equipment cabinets. Invented example.
ItemContent
Design questionHow might we remove heat from equipment cabinets that stand in full sun without air conditioning?
Function and contextRemove heat. Summer, full sun, no auxiliary energy.
Biologized questionHow does nature regulate temperature in hot climates?
Biological strategyThe large ears of the jackrabbit radiate heat through an extensive network of blood vessels.
Keywords and neutral synonymslarge ears: large surface; blood vessels: network of channels; blood: fluid
Design strategyA hot fluid circulates through an extensive network of channels beneath a large surface. The surface radiates the heat away.
Sketch of the design strategyA thin plate with a large surface that a branching network of channels runs through. Arrows show the heat leaving the plate.
ReviewThe strategy describes a fluid radiator. It confirms a known solution. The team goes back to Discover with another question: "How does nature reduce the heat it receives from the sun?"

An accurate design strategy can describe a solution that the field already knows.

Visualizations

The spiral diagram shows the six steps, what each one produces and the return to earlier steps. The table in the Define step shows the move from the object to the function. The table in the Biologize step shows the ways of framing the questions. The abstraction table in the example shows the deliverable of the Abstract step and its review.

Cost

DimensionLevelNote
PreparationMediumDefine the problem and the system, biologize the questions, find a biologist willing to review.
ExecutionHighSeveral days of literature research and abstraction, then repeated passes through the spiral.
DocumentationMediumThe sources of each strategy, the sketches, the abstraction tables and the evaluation of the concepts.

Tooling

AskNature (asknature.org) is the Biomimicry Institute's database of biological strategies. The Biomimicry Taxonomy guide (PDF) gives the groups and the functions. The Biomimicry Toolbox provides worksheets: Define the Challenge and Systems Explorer for Define, Biologize the Question for Biologize, Biomimicry Brainstorming Activity for Emulate and Nature's Patterns Checklist for Evaluate. Google Scholar finds the papers that describe a mechanism. A reference manager (Zotero) keeps the source of each strategy. A nature journal records observations in the field. A whiteboard or an online whiteboard (Miro, Mural) holds the sorted strategies during the Emulate step.

Sources

The steps, the sub-steps and the examples come from the Biomimicry Toolbox and its documents. The book by Janine Benyus is cited for the term and its definition. ISO 18458:2015 sets the terminology of biomimetics and describes the process that leads from an idea to a product. The spiral does not come from this standard.

Big Picture Understanding
All techniques
Black Box Illumination