Benne and Sheats Group Roles
Benne and Sheats group roles classify the behaviour that the members of a working group adopt in a session. Kenneth D. Benne and Paul Sheats published the classification in 1948. They drew it from the training groups that met in 1947 at the first National Training Laboratory in Group Development. The classification holds 27 roles in three families. Task roles move the work forward. Building and maintenance roles keep the group able to work. Individual roles serve a need of the member's own. The group uses the classification to diagnose itself: observers record the roles played, the group compares them with the needs of its stage, then it decides which roles to cover at the next session.
Goal
The roles name the functions that a member performs through what they say in a session: proposing an idea, asking for a fact, summarising, evaluating, inviting a colleague to speak. In their 1948 article, Benne and Sheats treat the leadership of a group as a set of functions that the leader shares with the other members.
A group that is stuck notices that its sessions go round in circles. It rarely sees what it lacks: nobody has summarised the options or tested them against the criteria. The classification gives the words to say so: the group lacked an orienter and an evaluator-critic. These words name functions. The group therefore talks about what happened without accusing anyone.
Early in the group's life, an inventory of the members' usual roles produces a partial list of the roles. The group completes it over the sessions. Each member also assesses their strengths and weaknesses for the first time. Each self-evaluation session then produces the group's decisions on the roles to cover and the members' commitments.
Usage
When to use
- A group that meets over several sessions: a committee, a business working group or a series of workshops where each session prepares the next.
- Sessions that go round in circles without a decision: spot the absence of task roles such as the orienter, the coordinator or the evaluator-critic.
- A few members hold the floor: measure the share of individual roles and open the self-diagnosis.
- The move from exploration to decision: review the roles that the group needs at the new stage.
- A retrospective that only discusses the product: also examine how the group worked.
- Training leaders and facilitators: practise role observation and role flexibility.
When not to use
- A group that meets once: there is no next session in which to cover the roles; prepare the workshop and its ground rules.
- A problem with one member's conduct or performance: the technique concerns the group; deal with it in a one-to-one conversation outside the session; for a conflict, use the Thomas-Kilmann conflict modes.
- Composing a team: the roles describe acts observed in a session; use Belbin's team roles.
Description
Origin and scope
Benne and Sheats adopt the scheme that researchers used to code group session records.
The original setting is the discussion group in training. Practitioners apply the classification to project teams and steering committees.
The role families
Task roles serve the work that the group has set itself: choosing and defining a common problem, then solving it. Building and maintenance roles serve the group itself. They strengthen, regulate and maintain the way it works. Individual roles stand apart. According to Benne and Sheats, these contributions are not member roles in the strict sense. They serve an individual goal unrelated both to the task and to the functioning of the group.
| Role | Function in the session |
|---|---|
| Task roles | |
| Initiator-contributor | Proposes an idea, a goal, a definition of the problem or a way to proceed. |
| Information seeker | Asks for clarification, for facts or for authoritative information. |
| Opinion seeker | Asks which values underlie a proposal or the work of the group. |
| Information giver | Offers facts or relates an experience that bears on the problem. |
| Opinion giver | States an opinion and says which values the group should adopt. |
| Elaborator | Develops a proposal through examples and examines how it would work. |
| Coordinator | Shows how the ideas relate and pulls together the proposals or activities of the members. |
| Orienter | Summarises the ground covered, shows where the group stands relative to its goals and flags departures from its direction. |
| Evaluator-critic | Tests the work of the group against a criterion: practicality, logic, facts or procedure. |
| Energizer | Prods the group to act or to decide. |
| Procedural technician | Distributes the documents and materials and arranges the room. |
| Recorder | Writes down the proposals and decisions. Keeps the group memory. |
| Building and maintenance roles | |
| Encourager | Praises and acknowledges the contributions of others. |
| Harmonizer | Reconciles disagreements between other members and eases a tense situation. |
| Compromiser | Yields on their own position in a conflict they are part of: admits an error or comes halfway. |
| Gate-keeper and expediter | Brings the members who are not speaking into the exchange and proposes rules for speaking time. |
| Standard setter or ego ideal | States the standards that the group aims for in the way it works and judges its functioning against them. |
| Group-observer and commentator | Records how the group functions and feeds it back to the group with an interpretation. |
| Follower | Goes along with the group and accepts the ideas of others. Forms the audience of the discussion. |
| Individual roles | |
| Aggressor | Deflates others, attacks the group or the problem and takes credit for the contribution of another member. |
| Blocker | Opposes without reason or beyond reason. Brings back a point that the group has set aside. |
| Recognition-seeker | Calls attention to themselves by boasting or by reporting their own achievements. |
| Self-confessor | Uses the audience to express personal feelings or an ideology unrelated to the group. |
| Playboy | Displays a lack of involvement: cynicism, nonchalance, horseplay. |
| Dominator | Tries to assert authority: gives orders, interrupts, claims superior status. |
| Help-seeker | Seeks the sympathy of the group by expressing insecurity or by running themselves down. |
| Special interest pleader | Cloaks personal prejudices by speaking for a category of people. |
One contribution can fill several roles. The leader can play any of them. From one contribution to the next, the same member can play a large number of them. Many secondary lists count 26 roles and rename several. Benne and Sheats describe 27 roles under their 1948 names.
A role is a function
A role names what a contribution does for the group at a given moment. The same member proposes an option at 9:00 and digs in against the decision at 10:00. Benne and Sheats make role flexibility a training goal: each member widens the range of roles that they can play. They describe the opposite defect: the member stuck in one role. Their example is the evaluator-critic who criticises at every turn.
A label stuck on a person defeats the technique. "Paul is the blocker" fixes Paul in a role that the group is trying to vary. The authors also note that everyone hears criticism of a role as criticism of themselves. They call for methods that reduce this defensiveness. In the self-evaluation session, the group therefore talks about acts: "the budget item came back five times after the group had set it aside".
The needs change with the stage
Benne and Sheats link the roles needed to the stage of the task and to the maturity of the group. A group that is still listing possible problems needs the evaluator-critic, the energizer and the coordinator less than a group close to a decision. A young group needs the standard setter less than a mature one. The role of group-observer and commentator also adapts to the maturity of the group. In a young group, the line between group roles and individual roles is less sharp.
The group decides for itself what it needs at each stage. For the stage of the task, David H. Jenkins distinguishes diagnosing the problem, seeking solutions and deciding. For the maturity of the group, the Tuckman ladder helps to find which stage of development the team has reached.
Individual roles are data
According to the authors, a high share of individual-centred contributions always calls for a self-diagnosis of the group. They name the possible causes:
- low group skill among the members and in the leader;
- an authoritarian or laissez-faire view of group work;
- a low level of group maturity, discipline and morale;
- a badly chosen or badly defined task.
The authors warn against suppressing individual roles outright. That would deprive the group of the data it needs to diagnose itself. A leader who cuts obstructive contributions short removes the symptom and leaves the cause in place. If the sponsor never set the budget, the question returns in another form.
Benne and Sheats answer a dominating or obstructive contribution with the self-diagnosis of the group. In practice, the leader can also play the missing role in the session. As gate-keeper, the leader brings in the members whom a dominating contribution has silenced. The leader covers a role for the group without singling out the member.
Running the self-diagnosis loop
The steps follow Benne and Sheats's section on training members (pp. 47-49). The grid and the length of the self-evaluation come from practice.
- Take an inventory of usual roles. Early in the life of the group, each member says which roles groups usually give them and which roles they find hard to play. The leader goes first and asks the group for help. The group gets a first list of roles and starts its self-diagnosis.
- Appoint one or more observers. They record the roles played during the session. In practice, the observer stays out of the discussion of the content and ticks each contribution in a grid of the three families. The grid counts acts per role and names nobody.
- Hold a self-evaluation session at set intervals. The observers bring their records: the roles present and the roles that the group probably needed. In practice, the group spends fifteen to twenty minutes on it at the end of each working session. In the Journal of Social Issues issue that carries Benne and Sheats's article, Jenkins publishes questions that can structure the exchange: does the group stay oriented to its goal, what stage has it reached, how fast is it moving, does it use the abilities of all its members, does it work together better than before?
- Name individual roles without blame. The authors ask the group to name them objectively and without blame. The group describes the act and its effect on the work. It looks for the cause among the causes that Benne and Sheats list.
- Compare the roles recorded with the needs of the stage. The group notes the missing roles and the roles in excess.
- Decide which roles to cover at the next session. The group chooses the roles to add. Each member commits to a role silently or aloud. A member who commits aloud then asks the group for help.
- Practise role flexibility. The members take turns as group-observer and commentator. With everyone's consent, the group listens again to the recording of one of its discussions. Role-plays in which each person plays an assigned role help to separate the role from the person.
The next session opens a new round. The observer first checks whether the roles decided on appeared.
In a hierarchical group, self-diagnosis requires the superior to accept that the group names the superior's own acts. The authors have the leader start with their own roles and difficulties. A head of department who opens the inventory in this way allows the other members to talk about theirs. A group with a good rapport often takes the diagnosis of its productivity as a threat to that rapport. Benne and Sheats call for helping the group to tell its climate apart from its output.
A permanent observer becomes the judge of the group. The rotation in step 7 prevents this. In a video conference, some of the roles play out in the written chat. The observer records the chat too.
AI considerations
A transcription tool produces the text of a recorded session. A language model then proposes a role for each contribution and counts the acts per family. The observer corrects this draft. The model also prepares the comparison with the needs of the stage. It drafts role-play scenarios for practice.
A joke eases a tension or puts a colleague down: the text alone does not say which. The model sees neither the tone nor the silences. The group and the observer decide on the role. A record per person would contradict Benne and Sheats's no-blame rule: it would turn the self-diagnosis into individual surveillance. Article 26 of Ordinance 3 to the Employment Act (OLT 3) prohibits systems designed to monitor the behaviour of workers at their workstation. A transcript names colleagues: it holds personal data under the Federal Act on Data Protection (FADP). The group records with everyone's consent. It submits the text to a hosted service only after anonymising it.
Examples
A working group of seven people prepares to choose case management software for a cantonal office. At the fourth of six sessions, it must select an option. The observer ticks each contribution by role. In the self-evaluation session, the group compares its records with the needs of a group close to a decision.
| Role | Acts recorded | Need at this stage | Decision for session 5 |
|---|---|---|---|
| Opinion giver | 21 | Medium | None |
| Initiator-contributor | 12 | Low: the options are on the table | None |
| Information giver | 9 | Medium | None |
| Orienter | 2 | High | One member summarises progress at the end of each item. |
| Evaluator-critic | 1 | High | Two members test each option against the criteria of the requirements specification. |
| Coordinator | 0 | High | The chair links each argument to the option it supports. |
| Energizer | 0 | High | Halfway through, one member reminds the group of the time of the vote. |
| Gate-keeper and expediter | 1 | High: two members have not spoken | Each member speaks in turn before the vote. |
| Blocker | 5 | Cause to be found | Cause identified: the sponsor has not set the budget ceiling. The chair asks the sponsor for it before session 5. |
| Observer for session 5: another member by rotation. | |||
The budget came up five times in the session. The group read it as the sign of a badly defined task and took the question to the sponsor.
Visualisations
The loop links the roles observed in the session to the needs of the stage and to the roles that the group decides to cover.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Low | Present the role families, prepare the grid, appoint the observer for the first session. |
| Execution | Medium | One member stays out of the debate at each session; fifteen to twenty minutes of self-evaluation at the end of each session. |
| Documentation | Low | One grid per session and the list of roles to cover at the next. |
Tooling
The technique needs no dedicated tool. The observer keeps the grid on paper or in a spreadsheet. The rows list the roles by family. The columns are twenty-minute slots. A whiteboard or a digital board such as Miro or Mural holds the comparison during the self-evaluation session.
For role-play, cards each carry one role and its function. With the consent of the participants, the Teams or Zoom recording and transcription feature supplies the material for listening back.
Sources
- Kenneth D. Benne and Paul Sheats, "Functional Roles of Group Members", Journal of Social Issues, 4(2), 1948, pp. 41-49: the primary source. It gives the three families and the 27 roles, the leadership of a group as a shared function, the link between the roles needed and the stage of the group, individual roles as data for self-diagnosis and the method for training members (pp. 47-49). Internet Archive publishes a scanned copy of the full issue.
- David H. Jenkins, "Feedback and Group Self-Evaluation", Journal of Social Issues, 4(2), 1948, pp. 50-60: the questions that a group asks itself during its self-evaluation.
- Swiss Confederation, Ordinance 3 to the Employment Act (OLT 3), SR 822.113: art. 26 for the prohibition of systems designed to monitor the behaviour of workers at their workstation.

