Attribute Listing
Attribute listing is an idea-generation technique that starts from an existing object: a product, a process step, a form or a service. The group or the analyst lists the object's attributes with the current value of each, keeps seven or eight at most and looks for other values for each one in turn. While one attribute varies, the others keep their current value. Last, the group drops the variants that lead nowhere. The deliverable is a table with one row per attribute, giving its current value and its variants. Creativity guides attribute the technique to Robert Platt Crawford and his book The Techniques of Creative Thinking (1954).
Goal
Attribute listing produces variants of an existing object by changing one attribute at a time. An attribute is a characteristic of the object that can take another value: the material of a pen, the channel of a request, the timing of a payment.
The technique makes the team write the attributes down before anyone proposes an idea. The list also names what the team takes for granted: who checks, when the customer pays, where the customer keeps proof of purchase.
The attribute table prepares the choice without making it. The kept variants go on to a decision matrix or a multi-criteria decision analysis.
Usage
When to use it
- A product, process or form exists and must change: its attributes supply the material for the session.
- As-is process analysis: each step of the mapped process breaks down into actor, channel, timing and proof.
- A lone analyst: the analyst fills in the table without a group.
- Distributed team: the table fits in a shared spreadsheet.
- Preparing a morphological box: the attributes and their variants supply the parameters and their values.
When not to use it
- No object exists yet: the list has no attributes. Brainstorming starts from an open question.
- The team needs to break with the current object: the technique varies only the existing attributes. Creative thinking brings in elements foreign to the object through analogy or provocation.
- The attributes change only together: the morphological box crosses their values.
Description
Object, attribute, value, variant
The object is the thing to change. A participant must be able to point at it: a form, a step of a documented process, a product on the table. A goal such as "improve the service" yields no attributes.
The current value is the one the object carries today. A variant is another value of the same attribute. For a pen, the attribute "material" has the current value "plastic" and the variants "metal", "wood" or "glass".
The steps
- Choose the object and the goal. A whole process yields attributes that are too broad. The analyst narrows it to one step such as selling a ticket. Before the session, the analyst writes down what the team wants to achieve: a shorter turnaround, a lower cost. At step 5, the group sorts the variants against this goal.
- List the attributes and their current values. Attribute families help the group overlook nothing. Physical attributes include colour, size, weight or material. Social attributes cover norms, responsibilities and communication. Psychological attributes concern perception, motivation and image. Cost, function and service life complete the families. For a process step, the analyst adds the actor, the channel, the timing, the rule and the proof.
- Keep seven or eight attributes at most. The group keeps the most important or the most interesting ones for the goal.
- Vary one attribute at a time. For each kept attribute, the group looks for other values. The other attributes keep their current value. One question is enough: how could this attribute be different? Any idea-generation technique also works. The group can put the SCAMPER questions to a single attribute. The group allows ten to fifteen minutes per attribute.
- Drop and keep. The group drops the variants that lead nowhere against the goal. It keeps one or more variants per attribute for evaluation. It notes the effect of each on the goal. A kept variant sometimes means adjusting the rest of the object. If the group keeps two compartments for a suitcase, it decides how the two fit together.
Mycoted and the Edinburgh Napier guide end the technique with a combination step: the group assembles the variants of several attributes into a new object. The morphological box deals with the combinatorial explosion that follows: it removes the configurations that contain a pair of incompatible values.
The traps
An over-broad attribute such as "quality" or "comfort" draws only wishes. The group splits it until each attribute carries a value the group can name.
A group that changes two attributes together at step 4 has started combining. The number of combinations then grows exponentially: N attributes with M values give MN configurations. M counts the current value. Five attributes with four values already give 1'024. Working attribute by attribute examines N × (M − 1) variants. The table in the example has four attributes with four values each, which gives 256 configurations. The session examines only twelve variants.
The technique creates no new attribute. An alarm clock built into a suitcase comes from no row of the table. The same limit keeps each variant close to an object that already works.
Attribute listing, SCAMPER and the morphological box
| Technique | Starting point | How the variants arise | When to choose it |
|---|---|---|---|
| Attribute listing | The object's attributes written down before idea generation starts | An open question put to one attribute at a time | The team must see what the object is made of before changing it. |
| SCAMPER | The whole object | Seven fixed questions asked one after another | The group needs a fixed set of prompts to produce ideas. |
| Morphological box | The parameters of a problem | Configurations that take one value from each parameter | The group must combine the variants of several attributes. |
AI considerations
Given a few lines that describe an object, a language model lists its attributes in seconds. It also names attributes the team no longer notices: the medium that carries the proof, the timing of the check. The analyst compares this list with their own before the session and adds what is missing.
At step 4, the model proposes variants for a single attribute if the prompt requires it. Without that instruction, it often combines several attributes in one proposal. "Pay in the app and receive the ticket there" changes two rows of the table. The analyst splits the proposal or passes it on to the morphological box.
The model knows nothing of local constraints: the fares of a regional fare network, the contract with a supplier, an internal control rule. It presents an unworkable variant with the same confidence as a workable one. The group sorts at step 5 because it knows these constraints.
Examples
The object is selling a ticket on board a regional bus. The goal is to cut the dwell time: the time the bus spends at each stop.
| Attribute | Current value | Variants | Effect on dwell time |
|---|---|---|---|
| Knowing the price | The passenger asks the driver | Price displayed at the stop · price calculated by the app · flat fare on the line | The passenger boards already knowing the price. |
| Paying | In cash to the driver | Contactless card · payment in the app · prepaid card | The driver no longer gives change. |
| Keeping proof of purchase | Paper ticket handed over by the driver | Ticket on the mobile phone · receipt by SMS · stamp on the hand | The driver no longer prints tickets. |
| Timing of payment | On boarding | At the stop before the bus arrives · on alighting · invoiced at the end of the month | Payment moves out of the dwell time. |
The group evaluates the contactless card. The other three rows keep their current value: the passenger asks the driver the price, receives a paper ticket and pays on boarding. A passenger who pays by contactless card at the stop before the bus arrives and receives the ticket on a mobile phone changes three rows at once. That combination belongs to the morphological box.
Visualisations
The deliverable is a table that the group fills in row by row on a whiteboard or in a spreadsheet. Koberg and Bagnall (The Universal Traveler) put the attributes as column heads and the variants underneath. This layout serves their random draws of one variant per column, which belong to the morphological box. The table with one row per attribute is read one attribute at a time.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Low | The facilitator names the object and the goal in half an hour. |
| Execution | Low | A one- to two-hour session for seven or eight attributes. An analyst working alone fills in the table in an hour. |
| Documentation | Low | The attribute table is the record. It goes into a spreadsheet the same day. |
Tooling
A whiteboard and sticky notes are enough. The whiteboard is laid out in the same columns as the attribute table: attribute, current value, variants, effect on the goal. Each note carries a single variant, which the group moves during sorting. A digital whiteboard such as Miro or Mural reproduces the set-up for a remote team. A spreadsheet holds the final table.
Sources
The steps come from creativity guides and a doctoral thesis.
- Crawford, R. P., The Techniques of Creative Thinking, Hawthorn Books, New York, 1954: the book to which these guides attribute the technique. Catalogue record.
- Mycoted, "Attribute Listing": steps 1 to 4, the combination step, the figure of seven or eight attributes and the count of combinations.
- Moorman, K., A Functional Theory of Creative Reading: Process, Knowledge, and Evaluation, doctoral thesis, Georgia Institute of Technology, section "Pop psychology": varying one attribute at a time, step 5, the suitcase example, the limit to existing attributes and the difference from morphological synthesis.
- Edinburgh Napier University, "Creativity & Innovation", Critical thinking guide: the attributes of paying a bus fare.
- Santa Barbara City College, course GDP 118, "Attribute Listing and Divergent Thinking": the attribute families and the layout of Koberg and Bagnall.

