Andon
The andon (Japanese for lantern) is the abnormality signal of a workstation. The operator who sees a departure from the standard pulls a cord or presses a button. The light board hung above the line then shows the station concerned. A team leader comes at once and tries to fix the problem within the cycle time. If the team leader fails, the line stops at the next fixed position. The technique comes from the Toyota Production System. Taiichi Ohno ties it to jidoka: a machine stops by itself on a defect. On a manual line, the operators stop production themselves.
Goal
The andon is a visual control that signals an abnormality where and when it appears. Ohno defines it as the line-stop indicator board hung above the production line. Today the word names the whole system: the cord or button at the station, the board, the call rule and the response that the call triggers.
The technique first targets the defect that multiplies. Ohno describes a piece of debris that damages an automatic machine: dozens, then hundreds of defective parts pile up. The technique also targets the defect that people hide. An operator who repairs in silence erases the abnormality before the supervisor sees it. For Ohno, a problem corrected this way brings neither improvement nor lower costs.
Ohno's answer is jidoka. The English edition of his book calls it autonomation. He places it beside just-in-time at the base of the Toyota Production System. Toyoda Sakichi's loom stopped as soon as a thread broke. Ohno extends the rule to manual lines: the operators push the stop button themselves when an abnormality appears. He gives the reason: "Stopping the machine when there is trouble forces awareness on everyone."
At each call, the responder decides: fix the problem within the cycle time or let the line stop. The technique delivers a signal and escalation rule per station, a named responder with a response window, a log of calls and stops with their cause and countermeasure.
Usage
When to use it
- Repetitive work described by standardised work: the andon signals any departure from that standard.
- Flow without buffer stock: in single-piece flow or in pull flow, a defect reaches the next station in the next cycle.
- Defect that repeats fast: automatic machine, batch processing by a calculation rule, automatic payment.
- Problems the team works around without reporting them: the call makes visible what the workaround erases.
- Team spread over several sites: a status and a notification replace the cord, provided a responder picks up the case within the window.
- Office processing queue: claims, invoices, benefit requests; the stop holds back a batch before a wrong calculation rule applies to every case.
When not to use it
- No standard defines normal: everyone judges the abnormality their own way; write the standardised work first.
- Error that a device can make impossible: the andon reacts after the fact; install a poka-yoke.
- Defect already delivered to the customer: the call at the station comes too late; contain the defect and analyse it with 8D problem solving.
Description
The elements
The standard defines normal. Without it, the operator has nothing to measure what they see against. Ohno links the two tools. The standard work sheet hangs at the station. When one looks up, the andon comes into view and shows at a glance where the trouble is and what kind of trouble it is.
The signal starts at the station. At Toyota, the operator pulls a cord strung along the line. The board above the line lights up and shows the zone or station concerned.
| Light | Meaning according to Ohno | What happens |
|---|---|---|
| Green | Operations are normal | Nobody steps in |
| Yellow | An operator wants to adjust something and calls for help | The team leader comes to the station; the line keeps moving |
| Red | A line stop is needed to rectify a problem | The line stops until the fix |
The trigger is the person who sees the abnormality. Ohno makes it a duty: in his glossary, the worker is required to stop the line when an abnormal situation arises. Toyota UK speaks of a right: every member of staff may stop the line on seeing a threat to the quality of the vehicle. The operator therefore needs no permission and has no option to stay silent.
The responder is the team leader named for the zone. According to Toyota Motor Corporation, the operator who pulls the cord lights the board and calls the person in charge. The person in charge therefore does not have to watch the equipment: they step in on call. Mark Graban adds that the responder must be close enough and free enough to come at once. At Toyota, this role falls to a team leader with no workstation of their own.
The response window sets the time the responder has before the stop. Drawing on Liker and Meier, Graban describes the sequence: after the call, the line runs on to the next fixed position. That position marks the end of the current work cycle. If the team leader fixes the problem before then, the line does not stop. Toyota UK confirms this sequence in a reply to a reader. The window therefore lasts for what remains of the cycle time. On a paced line, that cycle time follows the takt.
Setting up the andon
- Define normal. Write the standardised work of each station and the criterion that separates a conforming part or case from a non-conforming one.
- Give each station a signal. The signal shows the state (green, yellow, red) and the station concerned. A cord, a button or a status in software will do, provided the responder sees it without looking for it.
- Write the call rule. Who calls, on what departure, by what means. Toyota Motor Corporation counts a non-conforming part and a delay in the work among the departures: the operator who falls behind the cycle time also calls. The rule obliges the person who sees the abnormality to call.
- Name the responder and the window. One team leader per zone and per shift, a deputy, a response window that runs from the call to the next fixed position. Drawing on Liker and Meier, Graban stresses the order: the team leader's support exists before the plant installs the cord.
- Set the stop position. Decide where the line stops when the window expires: at the end of the current cycle, at a marked location, at the end of the batch. Graban gives the reason. At the fixed position, every operator in the segment stands between two steps. A stop in the middle of a task would interrupt half-done work and add new errors to the first one. In the office, the fixed position is a point where no case is half processed: before the payment run starts, at the end of the batch.
- Open the log. One row per call: the time, the step, the abnormality, how long the responder took to arrive, the outcome (fixed within the window or stopped, with the stop's duration), the cause, the countermeasure.
How a call runs
- The operator calls. The operator pulls the cord as soon as they see the departure. The station turns yellow on the board.
- The responder arrives. The responder comes to the station, looks at the problem and tries to fix it.
- The window closes. If the responder fixes the problem, the station turns green again and work continues. If not, the station turns red and the line stops at the fixed position.
- The team contains the defect. After a stop, the team isolates the affected parts or cases so that the defect does not move on.
- The team looks for the cause. Ohno asks why five times to reach the root cause rather than the symptom.
- The team prevents a repeat. For Ohno, a countermeasure against recurrence always follows an abnormality. The surest countermeasure makes the error impossible: that is the job of a poka-yoke.
- The team reviews the log. Toyota UK states that the frequency and nature of the calls feed the continuous improvement programme (kaizen).
A line that never stops
In his glossary, Ohno writes that a line that does not stop is either a perfect line or a line with big problems: when many people work on a line and the flow never stops, problems are not surfacing. In his view, a line must be able to stop. The stop keeps the line from producing defects. It also brings problems to the surface: the team solves them and improves the line until a few people can run it. Finally, the line becomes strong and hardly ever needs to stop. Ohno concludes: "There is no reason to fear a line stop."
The manager of a zone therefore checks that the operators use the signal. The manager also watches what happens to the person who uses it. An empty log does not prove that the process is healthy. It can mean that nobody dares to call. Graban reports a 2007 BBC account: workers at Toyota's Georgetown plant pulled the cord about 2'000 times a week. Ford's new Dearborn plant had installed similar cords. Its workers pulled them twice a week. For Graban, a cord pulled twice a week most often means that the workers have learned what happens to them when they pull it.
Amy Edmondson names this condition. She defines psychological safety as a belief shared by the members of a team that the team is safe for interpersonal risk taking. Graban links the andon to this concept. Pulling the cord exposes the operator, who reports a problem in front of colleagues and sometimes stops their work. A team without this safety keeps the cord and stops pulling it.
Pitfalls
Installing the cord without a responder. The operator calls and nobody comes. Or the team leader arrives ten minutes later. The operator learns that calling is useless and stops calling. A signal sent to an email inbox or to a phone line that switches to voicemail brings nobody. Name and train the responder before installing the signal.
Confusing the call with the stop. Managers who believe that every call stops the line fear the cord. They discourage calls or demand prior authorisation. The signal then comes too late. Explain the full sequence: the call summons the team leader; the stop comes only after the window. At Toyota, a stop affects one segment of the line. Small buffer stocks feed the next segment for a few minutes.
Aiming for zero calls. A metric that rewards teams with no calls rewards silence. Track calls as a measure of the problems made visible. Never judge a person on the number of their calls.
Repairing without a trace. The team leader fixes the problem within the cycle time and leaves without noting anything. The line kept running, but the cause remains in place and the same call will come back. Every call gets its row in the log, even one fixed in two minutes.
Calling without a standard. Without a written criterion, one operator calls over a scratch and another lets an out-of-tolerance part through. The log then mixes abnormalities and preferences. Write the criterion before installing the signal.
Boundaries with neighbouring techniques
Ohno files the andon with kanban and the standard work sheet among the tools of visual control. The neighbouring techniques differ from the andon in the moment they act and in what triggers them.
| Technique | Who triggers it | When | What it handles |
|---|---|---|---|
| Andon | The operator | When the abnormality appears | A departure from the standard seen at the station |
| Poka-yoke | The device | Before the error or when it occurs | An error made impossible or detected without a person |
| Kanban stop rule | The next station | On receiving a defective part | A defect from the previous station; the next station stops the line |
| Gemba walk | The manager | At a set time | What the manager observes on the shop floor |
| 8D problem solving | A complaint | After delivery | A defect that has reached the customer; D3 containment protects the customer |
Ohno's glossary gives examples of poka-yoke: a badly placed part does not fit into the tool, the machine does not start if the material is irregular. The andon covers what no device prevents yet. Every cause found after a call is a candidate for a poka-yoke.
Beyond the shop floor
Ohno and Toyota describe the andon in a factory. An office team adapts the technique when the work repeats and a standard describes it. The line becomes the automatic payment of a batch of cases. The station becomes a processing step. The responder picks up the case within the window.
AI considerations
An anomaly detection model reads the data of a machine or a batch process and raises the signal without waiting for an operator: a temperature deviation, a rising reject rate, a series of amounts outside the distribution. That is jidoka applied to data. A language model sorts the log rows by cause and groups the calls that recur. It prepares the weekly review: the steps that call most, the repeated causes, the countermeasures still open. It suggests questions for the five whys session.
The model does not decide on the stop. The team leader looks at the problem at the station and decides within the window. An oversensitive detector floods the board with yellow alerts. The team then learns to ignore them. Tune its threshold against the log, then measure the share of alerts that the responder confirms. A cause proposed by the model remains a hypothesis that the team checks on site.
In the office, a station is often one person. Art. 26 of Ordinance 3 to the Employment Act (OLT 3) prohibits systems designed to monitor the behaviour of workers at their workstation. The review therefore groups calls by cause and by processing step, never by station or by employee.
Examples
The andon call log of an invoice-checking team at a health insurer, for one week. The rule: the clerk sets any case whose invoice does not match the coverage to "andon" status. The team leader receives a notification. The response window is 10 minutes. Once that time has passed, the team leader suspends the automatic payment of the batch.
| Call | Step | Abnormality reported | Responder at the station after | Fixed within the window | Batch stop | Cause (five whys) | Countermeasure |
|---|---|---|---|---|---|---|---|
| Mon 08:42 | Tariff check | Tariff item missing from the table | 3 min | Yes | No | The new version of the table was not loaded | Table check at every new version |
| Mon 14:10 | Data entry | Same invoice received twice | 2 min | Yes | No | The provider resends the invoice through a second channel | Duplicate block at data entry |
| Tue 09:05 | Deductible check | Deductible applied twice to the same insured person | 6 min | No | Yes, 09:15 to 09:55; 212 invoices held | Calculation rule changed the day before without a test | User acceptance test (UAT) of every rule change |
| Thu 11:30 | Payment | Provider's IBAN differs from the register | 4 min | Yes | No | The register is not updated when the provider changes bank | Automatic check of the invoice IBAN against the register at data entry; mismatch blocked before payment |
Tuesday's call holds back 212 invoices before payment: without the stop, the faulty rule would have applied to the whole batch. All data are invented.
Visualisations
The three-lights table gives the meaning of each state according to Ohno. The diagram of a call follows one cycle time, from the call to the end of the window, then the two outcomes: the fix without a stop or the stop at the fixed position. The boundaries table places the andon among the neighbouring techniques. The call log shows the deliverable of the example.
Cost
| Phase | Level | Rationale |
|---|---|---|
| Preparation | Medium | Write the standard and the abnormality criterion of each station, install the signal, name and train the responders. |
| Execution | Medium | A call costs a few minutes. A responder must stay available on every shift. A stop idles the line segment. The restart costs too: every station must resynchronise. |
| Documentation | Low | One log row per call. The team reviews the log every week. |
Tooling
On the shop floor, a cord strung along the line or a button per station drives a suspended light board that the whole zone can see. Digital andon systems add an alert on the team leader's tablet or watch. They record the time of each call and each response.
In the office, a status in the case-processing or ticketing tool stands in for the cord. A notification that brings the responder stands in for the board. The log fits in a spreadsheet or on a whiteboard near the team; it is enough as long as the team reviews it every week.
Sources
- Taiichi Ohno, Toyota Production System: Beyond Large-Scale Production, Productivity Press, 1988 (original Japanese edition, 1978): ch. 1 "Give the Machine Intelligence" for jidoka, Toyoda Sakichi's loom and the stop-button rule; ch. 2 "Writing the Standard Work Sheet Yourself" for the andon and the standard work sheet; ch. 2 "Kanban Accelerates Improvements" for the next station's stop rule; ch. 2 "Repeating Why Five Times" for the five whys; glossary, entries "Andon", "Autonomation", "Stopping the Line" and "Baka-Yoke".
- Toyota Motor Corporation, Toyota Production System: the stop cord that the operator pulls, the board that lights up to call the person in charge, the equipment that nobody has to watch, the reasons for a call.
- Toyota (GB) PLC, Andon - Toyota Production System guide: the right of every member of staff to stop the line; the analysis of calls in kaizen; Toyota UK's reply to a reader: the call alerts the team leader, who has time to fix the problem before the stop.
- Mark Graban, "No, One Toyota Worker Can't Stop the Whole Factory", Lean Blog, 29 June 2026: drawing on Liker and Meier, the sequence from the call to the fixed position, the reason for that position, the stop limited to one line segment and the team leader's support as a precondition; the team leader without a workstation; the Georgetown and Dearborn calls reported by the BBC; the link with psychological safety.
- Amy C. Edmondson, "Psychological Safety and Learning Behavior in Work Teams", Administrative Science Quarterly, 44(2), 1999, p. 350-383: the definition of psychological safety.
- Ordinance 3 to the Employment Act (OLT 3), SR 822.113, art. 26: the ban on systems designed to monitor the behaviour of workers at their workstation.

