Your Training Partner
Techniques Toolbox
Four steps from left to right: 1 Sort (seiri), 2 Straighten (seiton), 3 Shine (seiso), 4 Standardise (seiketsu). A brace groups them under the words "once per area". Below them, a loop marked 5 Sustain (shitsuke) carries three levels of audit: every day, the team compares the area with the reference photo; every week, the area owner fills in the grid; every month, an auditor from outside the area audits the area. Arrows rise from the loop to each of the four steps with the label "deviation: action, owner, due date". A note reads: "Toyota uses four terms: its audits replace the fifth".

5S

5S is a method for organising a workplace in five steps. Five Japanese words name them: seiri (sort), seiton (straighten), seiso (shine), seiketsu (standardise) and shitsuke (sustain). The Lean Enterprise Institute (LEI) describes them as five workplace practices that serve visual control and lean production. The method comes from the shop floor. Teams also apply it to an office, a shared network drive or a backlog. The first four S put the area in order. The fifth keeps it there with an audit at a fixed cadence.

Goal

5S brings a work area to a reference state and then keeps it there. The reference state says what belongs in the area, where each item sits and what the clean area looks like. Anyone who enters the area then sees a deviation without looking for it: a tool missing from its shadow outline, a box outside its floor marking, an empty binder.

The method removes the time lost searching for things, moving them and working around clutter. It lays the ground for other lean techniques. Standardised work assumes a workstation where every item has its place. The team spots the eight wastes more easily once clutter no longer hides them.

The method delivers the area standard: the photo of the reference state, the location plan and the cleaning tasks with their owners. It also delivers the audit grid and its calendar. The decision it supports recurs at every audit: does the area hold its standard? If not, who corrects what by when?

The fifth S is an audit

The LEI reports that Toyota traditionally uses only four terms. In Toyota's practice, shitsuke becomes redundant, because the daily, weekly and monthly audits of standardised work already provide the discipline. Sustaining therefore rests on a mechanism: the audit on a fixed date. Without it, the area drifts back into disorder. According to the LEI, 5S goes deeper than a one-time housecleaning: it creates standards that reveal problems. Whether a company counts four, five or six S, the LEI asks for an effort that is systematic and built into lean production.

Gapp, Fisher and Kobayashi describe the 5S of Japanese companies as one element of the management system rather than a stand-alone tool. Each S has a visible technical side and an invisible philosophical side. A 5S reduced to tidying keeps only the visible side. The LEI quotes Michael Ballé: in most companies he visits, 5S has become "a bureaucratic program to make the workplace look neat, with no consideration for waste all over". The team tidies the area for the management visit. The waste that tidying was meant to reveal stays in place.

Usage

When to use it

  • Time lost searching: tools, parts or documents the team does not find at the first attempt.
  • Shared area without an owner: a workshop, a stock room or a records room where everyone puts things down and nobody puts them away.
  • Groundwork for standardised work: the sequence of a workstation assumes that every item has a fixed location.
  • Waste hidden by clutter: stock, waiting or defects.
  • Kaizen event on a disorderly workstation: 5S treats the cause when the disorder produces the waste.
  • New premises or a new team: fix the locations before habits set in.
  • Shared network drive near capacity: duplicates, competing versions, a folder tree that everyone works around.
  • A backlog nobody reads in full: stale items, duplicates, priorities that no longer mean anything.
  • A remote team whose area is a shared drive or a backlog: the whole 5S can run online.

When not to use it

Description

The order matters: straightening before sorting puts the clutter away. The English translations vary by source (Sort or Separate, Straighten or Set in order). The Japanese terms stay fixed.

5S: four steps and an audit
The fifth S sends each deviation back to its step
once per area
1Sort
2Straighten
3Shine
4Standardise
deviation: action, owner, due date
5 Sustainaudit
every day: the team compares with the reference photo
every week: the area owner fills in the grid
every month: an auditor from outside the area
Toyota uses four terms: its audits replace the fifth
Sort, straighten, shine and standardise put the area in order once. The fifth S is the daily, weekly and monthly audit that sends each deviation back to its step.

Preparing the area

The team chooses a bounded area: a workbench, a stock room, a root folder on the shared drive. A workshop 5S needs the team on site. An area that is too large wears the team out before the third S. The people who work in the area lead the 5S. Okrent asks for employees at every level to take part so that they own the effort. An outside facilitator can guide the first session. The facilitator does not decide what stays. An area owner then answers for the standard.

Management reserves the time for the kick-off session and for each audit. Before touching anything, the team photographs the area from fixed points. It will reuse these points for the reference photo and for every audit.

Sort (seiri)

Sorting separates what is used from what is not, then removes what is not used. The criterion is the use observed in the area. For each item, the team asks when it was last used and how often it is used. An item in use stays. Its location is decided in the second S.

Okrent classifies items as needed, unneeded and doubtful. He prescribes removing the unneeded items and setting the doubtful ones aside. A doubtful item receives a red tag. The tag carries the date, the area, the name of the person who attached it and a review date. The item goes to a quarantine area away from the workstation. On the review date, the area owner decides. The item returns to a location, moves to another department or leaves the company.

A team that keeps everything "just in case" puts the clutter away instead of removing it. A team in a hurry throws out a jig that is used twice a year. The day it is missing, the workstation stops. Quarantine guards against both errors: the doubtful item leaves the workstation without leaving the company.

Straighten (seiton)

Straightening gives every remaining item a fixed and marked location. The LEI uses the phrase "a place for everything and everything in its place". The location follows the frequency of use. What is used at every cycle sits within reach at the point of use. What is used every week stays in the area. What is used less often goes to the store room of the department.

The marking makes the location visible: a floor line for a trolley, a shadow outline on a tool board, a label on the shelf and on the item. An empty location signals a missing item. The test of the second S: a stand-in for one day finds every item without asking.

Sorting an item
Observed use settles the fate of each item and a doubtful item goes to quarantine first
Item in the area
Is it used?
yes
How often?
at every cycle:at the point of use
every week:in the area
less often:in the store room of the department
no
Remove from the area
unsure
Red tag
Quarantine away from the workstation
Review on the set date
returns to a location
moves to another department
leaves the company
An item that is used receives a location according to its frequency of use. An item that is not used leaves the area. A doubtful item receives a red tag and waits for its review date in quarantine.

Shine (seiso)

Shining makes the area and the equipment clean. On a machine, cleaning is also the inspection. The person who wipes a guard sees the leak, the loose screw, the worn cable. The team divides the area into sectors. It assigns each sector to a person with a frequency and a duration. Five minutes at the end of each shift keep the area clean longer than one Saturday per quarter.

Dirt that comes back has a source: a leaking seal, a chip that escapes from the machine, a plastic film that falls from the stretch wrapper. The team records the source and treats it as a cause. Cleaning without treating the source turns 5S into a chore.

Standardise (seiketsu)

The sources diverge on this fourth S. The LEI defines it as a result: the cleanliness that comes from performing the first three S regularly. Okrent defines it as an action: setting the practices and procedures that maintain the first three S. The team does what the second definition asks to reach the state that the first one describes.

The standard fits on one page posted in the area. It shows the photo of the reference state and the location plan. It lists the cleaning tasks, each with its owner and its frequency. It names the area owner. A person who does not know the area must be able to read every deviation from it. A standard that only the team knows disappears with the first departure.

Sustain (shitsuke): the audit

The LEI glosses shitsuke as the discipline to perform the first four S. The audit compares the area with its standard criterion by criterion. Each deviation receives an action, an owner and a date. Okrent counts management commitment, regular audits and recognition of the team's contributions among the conditions that make 5S last.

The cadence follows the three levels that the LEI attributes to Toyota. The team decides who audits at each level. For example, every day the team spends a few minutes comparing the area with the reference photo. Every week the area owner fills in the audit grid and follows up the open actions. Every month the auditor comes from another area or from line management. This auditor sees what habit hides from the team. The monthly audit can take place during a gemba walk.

The grid carries two or three criteria per S. Each criterion is written as a verifiable observation: "every trolley on its floor marking", never "the area is tidy". Each criterion reads as compliant or as a deviation. A score out of 100 invites people to bargain over points. A named deviation invites them to correct it. Grids that score each criterion from 0 to 5 are common in industry. The binary grid gives up their trend curve and gains a named action for each deviation in exchange. The criteria of the fifth S concern the audit itself: the previous audit took place on its date, its actions are closed.

The audit judges the area. A grid that ranks teams against each other pushes everyone to tidy up for audit day. An audit that is announced and always passed no longer measures anything. So the monthly auditor chooses the day. When the same deviation comes back three audits in a row, the standard is probably wrong: the location is badly chosen or the cleaning task is too heavy. The team then corrects the standard rather than repeating the action.

The LEI notes that some practitioners add safety as a sixth S. A team can also build it into the five S. It then adds one criterion per S: an emergency exit kept clear under sorting, a hazardous product in its marked location under straightening.

5S beyond the shop floor

Dan Markovitz applies 5S to files in an article published by the LEI. He splits files between a working folder, a reference folder and an archive folder according to how often they are used. The working folder receives what is used every day, every week or even once a month. According to Markovitz, the value of 5S lies more in the review than in deleting files. For a backlog, the adaptation comes from our own practice: the team audits it at every backlog refinement. The logic is the same as on the shop floor. Observed use decides the sort. The location follows the use. The audit holds the result.

SWorkshopShared network driveBacklog
SortRed tag on the doubtful item, quarantine away from the workstationFiles not modified for 12 months moved to a dated read-only archive folderItems without activity for three sprints flagged, then reviewed with the Product Owner
StraightenFixed and marked location at the point of useThree folders by use: working, reference, archive (Markovitz)One backlog per product, items grouped by goal
ShineCleaning at the end of each shift, source of dirt treatedDuplicates and competing versions deleted, dead links repairedDuplicates merged, delivered items closed
StandardisePosted page: reference photo, plan, cleaning tasksRead-me file in the folder: folder tree, naming rule, ownerEntry rule for an item: format, acceptance criteria, author
SustainDaily, weekly and monthly auditMonthly audit on the disk space reportAudit at every backlog refinement
The five S applied to a workshop, a shared network drive and a backlog. Observed use decides the sort in all three cases.

On a shared drive, sorting meets a legal constraint. Art. 958f of the Code of Obligations requires accounting records and vouchers to be kept for ten years. The period runs from the end of the financial year. A file that the team no longer needs can be a record under retention. It goes to the archive with its retention period. The recycle bin receives only what the records manager has released.

AI considerations

A vision model compares the day's photo with the reference photo taken from the same point. It flags items that were moved, added or removed. The auditor starts from this list and checks on site. A language model writes a first draft of the area standard from the photos, the plan and the task list. It proposes audit criteria and rewrites those that judge instead of observing.

On a shared drive, a script reads the last-modified dates, the sizes and the hashes of the files. It finds exact duplicates and dormant files. The actual opening dates come from the file server's access log. A language model groups competing versions of the same document by their content. It proposes a folder tree based on the names and the contents.

The tool does not know what is used. The disaster recovery procedure that nobody opens until something happens looks dormant in the script's report. The area team decides the sort from the tool's list. For a record under retention, the records manager decides. A confidential document goes to an external AI service only with the data owner's approval.

Art. 26 of Ordinance 3 to the Employment Act (OLT 3 / ArGV 3) prohibits systems designed to monitor the behaviour of workers at their workstation. A camera that films the area continuously also captures the workers. It is therefore questionable under art. 26. The audit photo does not raise the question: the auditor takes it from the fixed points and frames it on the area and its items.

Examples

The area owner audits shipping dock 2 of a logistics centre in week 41.

SCriterionResultAction, owner, due date
SortNo item without a known use on the dockCompliant
SortRed tags reviewed on their dateDeviation: two tags expired in week 39Review the quarantine, S. Rochat, 9 Oct
StraightenEvery trolley on its floor markingCompliant
StraightenEvery tool on its shadow outlineDeviation: cutter no. 3 missingReplace the cutter, L. Favre, 12 Oct
ShineDock floor free of plastic filmDeviation: film offcuts under the stretch wrapperPlace an offcut bin at the foot of the stretch wrapper, A. Berisha, 16 Oct
ShineEnd-of-shift tasks signedCompliant
StandardiseReference photo up to dateCompliant
StandardiseLocation plan matches the dockCompliant
SustainWeek 40 audit held on its dateCompliant
SustainWeek 40 actions closedDeviation: one action open out of threeClose at the Monday team meeting, S. Rochat, 12 Oct
Summary10 criteria: 6 compliant and 4 deviations
Weekly audit grid for dock 2 in week 41: ten criteria, six compliant and four deviations. Each deviation carries an action, an owner and a due date.

The cleaning deviation receives an action on the source. The offcut bin keeps the film off the floor. One more sweep would only have picked it up after it fell. The two rows of the fifth S audit the previous audit.

Visualisations

The 5S diagram shows the first four S as a sequence that the team runs through once per area. The fifth S forms the audit loop that sends each deviation back to the S concerned. The sorting tree follows an item to its location, to the exit or to quarantine. The adaptation beyond the shop floor and the audit grid are tables.

Cost

PhaseLevelJustification
PreparationLowChoose the area, gather the team, photograph the area, prepare the red tags and the quarantine area.
ExecutionMediumOne or two sessions per area for the first four S. For a shared drive, Markovitz allows one to two full days in one block or one to two hours a day until the sort is done. The audits then cost a few minutes a day, half an hour a week for the area owner and one hour a month, for as long as the area exists.
DocumentationLowOne standard page and one audit grid per area. The team updates both when the area changes.

Tooling

A workshop 5S works with hardware-store supplies: red tags, floor marking tape, cut foam or paint for the tool shadow outlines, shelf labels. A mobile phone takes the photos from the fixed points. The audit grid fits on paper or in a spreadsheet. The spreadsheet keeps the history of deviations and actions. A mobile forms app (Microsoft Forms, SafetyCulture) pays off when several people audit several areas: it dates each audit and attaches the photos to it.

On a shared network drive, a disk space analyser (TreeSize, WinDirStat) lists files by size, by last-modified date and by duplicate. The team uses it for the first sort, then for the monthly audit report. A document management system (DMS) such as SharePoint or M-Files carries the naming rule, the access rights and the retention periods. It pays off when the sort must respect a retention period. For a backlog, the ticketing tool (Jira, Azure DevOps) filters items by date of last activity. This filter produces the list to review before each refinement.

Sources

  • Lean Enterprise Institute, Five S, Lean Lexicon: the definition, the five Japanese terms and their glosses, the purpose of 5S beyond a one-time housecleaning, the quotation from Michael Ballé, Toyota's four-term practice, the sixth S.
  • Dan Markovitz, 5S for Information, The Lean Post, Lean Enterprise Institute, 2008: 5S applied to files, the working, reference and archive folders, the pace of the first sort.
  • Gapp, Fisher and Kobayashi, "Implementing 5S within a Japanese context: an integrated management system", Management Decision, 46(4), 2008, p. 565-579: 5S as one element of a management system, the technical side and the philosophical side of each S.
  • Michael D. Okrent, Applying Lean Six Sigma for Operational Excellence, Chapter 4: 5S for Workplace Organization, Cleveland State University, open-access textbook (CC BY-NC-SA 4.0): sorting into needed, unneeded and doubtful items, red tags, the definition of seiketsu as an action, employee involvement, the conditions that make 5S last.
  • Swiss Code of Obligations (CO), SR 220, art. 958f: retention of accounting records and vouchers for ten years from the end of the financial year.
  • Ordinance 3 to the Employment Act (OLT 3 / ArGV 3), SR 822.113, art. 26: the prohibition of systems designed to monitor the behaviour of workers at their workstation.
25/10 Crowd Sourcing
All techniques
8D Problem Solving