25/10 Crowd Sourcing
25/10 Crowd Sourcing is a Liberating Structures meeting structure in which a large group produces and sorts ideas for action. Each participant writes a bold idea and its first step on a card. The cards pass from hand to hand over five rounds. At the end of each round, the person holding a card scores it from 1 to 5 on the back. A card therefore totals 25 points at most. In the countdown, the facilitator calls out the scores from 25 down and the participants read aloud the ten best-scoring ideas. Henri Lipmanowicz and Keith McCandless describe the structure in The Surprising Power of Liberating Structures (2013). The book gives it 30 minutes. The authors' site gives 20 to 25 minutes.
Goal
25/10 Crowd Sourcing is a facilitation structure. Each participant proposes an idea for action and the group scores every idea. In the countdown, the group hears the ten best-scoring ideas.
The name combines the maximum score of a card (25) with the number of ideas the countdown keeps (10). The book writes "Crowd Sourcing" as two words. The site writes "Crowdsourcing".
In a plenary of thirty people, a few voices take over the discussion and the idea of the most senior person often wins by default. In 25/10, colleagues score each idea before anyone speaks to the room.
According to the book, the structure helps a group draw quickly on what its members already know. The book also sees it as a way to encourage novices to think big and to name a doable first step. The site links the structure to the first principle of Liberating Structures: "Include and Unleash Everyone".
The group leaves with the list of the ten best-scoring ideas and the first step of each. The book then advises posting all the cards on a wall with the best-scoring ones at the top.
With dot voting, each person spreads a fixed number of votes across all the options on display. In 25/10, each person scores the one card they hold at the end of a round. An idea therefore usually receives five scores, whatever the size of the group. This scoring still works with four hundred people: the book uses the structure at a summit of that size. It also makes the score approximate. You will find the other structures of the repertoire under Liberating Structures.
Usage
When to use it
- After an Open Space or a participant-driven meeting: prioritise the ideas and galvanise the community.
- Start of a conference or a task force: bring out the participants' bold ideas.
- End of an important meeting: leave with ideas for action and a first step for each.
- Closing circle: share the ideas and strengthen the bonds within the group.
- More than fifteen participants after 15% Solutions: sort the bold solutions that need resources (chapter 6).
- Group stuck during Ecocycle Planning: restart action with 25/10 and What, So What, Now What?
- Search for solution options: gather the options of a whole department before keeping a few for analysis.
- Rank inhibiting what people propose: ask for unsigned cards. The colleagues who score them usually do not know who wrote them.
When not to use it
- Online group: the site advises against it. Produce the ideas with 1-2-4-All in small groups, then rank them by dot voting.
- Fewer than fifteen participants: the site sets fifteen as the minimum. Prefer 1-2-4-All, then a dot vote if a ranking is needed.
Description
The invitation
The invitation is the question the facilitator puts to the group. The book's invitation reads: "If you were ten times bolder, what big idea would you recommend? What first step would you take to get started?" The site adds a sentence on the purpose to the invitation: generate and sift bold ideas for action, then spread innovations as everyone notices the patterns that emerge. In the site's version, the facilitator also describes a shared problem as an introduction.
With the second question, each person writes an action next to their idea. In our view, the facilitator asks for a first step that someone in the room can take within the month. According to the site, the facilitator invites everyone to keep it short and clear and reminds them that spelling matters less than the idea.
The room and the materials
The book calls for an open space without chairs or tables. The participants stand and mill about. Each receives a card. A bell marks the rounds. The book's tips add a sticky note that covers the back of the card and hides the scores from earlier rounds.
Participation and groups
Everyone takes part at the same time. According to the book, everyone has the same chance to contribute. The group changes configuration at each step. Each person writes alone. The group mills about to swap the cards. The participants talk in pairs, then score alone. Finally, the whole group shares the best scores.
The book speaks of a "large crowd". In a string from chapter 6, it uses 25/10 with groups of more than fifteen people.
The steps
The steps follow the book.
- The facilitator explains the process (3 min).
- The facilitator demonstrates one exchange and one scoring with a sample card (2 min). The demonstration clarifies the rule for the exchanges: nobody reads the cards aloud and each person holds only one card at a time. The book warns that the process can confuse some participants.
- Each participant writes a big idea and its first step on their card (5 min).
- The participants mill about and pass the cards to one another. When the bell rings, they stop and form pairs. Each pair discusses the two cards in hand. Each person then scores their card alone from 1 (low) to 5 (high) on the back. The group runs five rounds of 3 minutes (15 min).
- After the fifth round, each person adds up the five scores on the card they hold.
- The facilitator starts the countdown with the whole group: "Who has a 25?" Each person holding a card at 25 reads out the idea and the first step. The facilitator then calls 24, then 23 and the scores that follow. The facilitator stops when ten ideas have been read (5 min).
- The facilitator closes with a question: "What caught your attention about 25/10?" (2 min).
The book states 30 minutes. By our arithmetic, its timings add up to 32.
A scoring round
The book allows time "for milling (and laughing)" between the rounds. In our view, a person who receives their own card swaps it again before the signal.
The site drops the discussion in pairs. The participants cross paths and swap cards with each person they meet without reading the new one. After one minute, a signal stops them. Each person reads the card they hold, then writes their score on the back. They then raise their card to show that they are ready for the next round.
Long version and short version
| Element | Long version (book, 2013) | Short version (site) |
|---|---|---|
| Stated duration | 30 min | About 20 to 25 min |
| Group size | A large crowd. More than fifteen people in a string from chapter 6 | At least fifteen participants |
| Order of the first steps | Explanation, demonstration, writing | Introduction, writing, demonstration |
| Introduction | Explain the process (3 min) | Present the invitation and describe a shared problem (3 min) |
| Demonstration | One exchange and one scoring with a sample card (2 min) | How a round runs (2 to 3 min) |
| Writing | 5 min | 5 min |
| One round | Mill about passing the cards. Discuss the cards in hand in pairs. Score alone (3 min) | Swap the cards without reading them for 1 min. Read and score. Raise the card once the score is written |
| Five rounds | 15 min | 5 min |
| Adding up the scores | No time given | 2 min |
| Countdown | 5 min | 3 to 5 min |
| Closing | One question about what caught people's attention (2 min) | Two questions about a low-scored but intriguing idea and about where the ideas can move forward (2 min) |
| Online | Not covered | Not recommended |
| Calculated total | 32 min | 22 to 25 min |
Both versions come from the authors. The book's 3-minute rounds leave room for the discussion in pairs. The site's one-minute rounds do not. In our view, the facilitator follows one column in full.
The rating scale
The book suggests a scale that is fun and clear. A score of 1 means "not your cup of tea". A score of 5 means "sends me over the moon". According to the book, the group must understand and accept the scale if the scores are to be used for decisions. In our view, the facilitator displays the scale throughout the session.
Adding up the scores
According to the book and the site, a card can finish the fifth round with more or fewer than five scores. The person holding it then multiplies the average of the scores by 5.
| Card | Scores on the back | Calculation | Score |
|---|---|---|---|
| Five scores | 4 · 5 · 3 · 5 · 4 | 4 + 5 + 3 + 5 + 4 | 21 |
| Six scores | 4 · 5 · 3 · 5 · 4 · 3 | Average 24 / 6 = 4. Then 4 × 5 | 20 |
| Four scores | 5 · 4 · 4 · 3 | Average 16 / 4 = 4. Then 4 × 5 | 20 |
| Six scores (non-integer average) | 4 · 5 · 3 · 5 · 4 · 4 | Average 25 / 6 ≈ 4.167. Then 4.167 × 5 | 20.8 |
Without the rule, the first six-score card would total 24 and pass the five-score card. In our view, the person holding a card keeps one decimal place: the second six-score card totals 25 and gets 20.8.
The countdown
In our view, when the facilitator calls a score that takes the list past ten cards, each person holding a card with that score reads it. The list then holds more than ten ideas.
The closing
The book advises the group to choose one big idea with its first step, then to rewrite it so that it reads more clearly and convincingly.
What makes 25/10 Crowd Sourcing fail
A group that has not understood the process reads the cards aloud or ends a round with two cards in hand. According to the book, the facilitator takes their time during the demonstration and asks the participants for feedback above all when the group is large.
In our view, a participant who sees the earlier scores aligns with them. The book's sticky note prevents this.
In our view, the score measures how attractive an idea is to the people who scored it. It measures neither its cost nor its feasibility. A team that launches the ten ideas without further analysis mistakes this ranking for a decision. To compare cost, feasibility and value, the analyst carries the selected ideas over into a decision matrix.
In our view, the cut-off at tenth place is fragile. In a group of thirty-two, a card usually receives five scores. A one-point gap around tenth place then often depends on which people happened to score the card. The facilitator therefore plans time to post or read the cards just below the cut-off as well. The book reports the end of a medical education conference prepared through Discovery & Action Dialogues: the group read the top ten ideas, then all the others at a member's request.
Variations
The book proposes these variations:
- Move from the ten ideas to action plans or to an Open Space.
- Run a second 25/10 with people from outside the group ("Cloud Sourcing").
- Run a 25/10 at the start and at the end of a meeting. For the second pass, the site asks for bolder and more concrete ideas.
- Place the ten ideas in an Agreement-Certainty Matrix.
- Replace the invitation with another two-part question, for example "If you could unmake one decision that is holding you back, what would it be? What is your first step to unmake it?" or "What courageous conversation are you not having? What first step could spark your courage?"
25/10 Crowd Sourcing in strings
| Source | String | Purpose |
|---|---|---|
| Book (chapter 6) | Nine Whys, then 1-2-4-All with 15% Solutions, then 25/10 | Clarify the purpose. Name the possible actions that need no extra resources, then bold solutions that do. Sort these solutions with 25/10 in groups of more than fifteen people. |
| Book (chapter 6) | Open Space, then Min Specs, then 25/10 | Launch local actions. Find the bolder initiatives within the limits set and invite volunteers to lead them. |
| Book (chapter 7): meeting of twenty-five leaders | Impromptu Networking, 1-2-4-All, 25/10 (15 min), 1-2-4-All, TRIZ (Creative Destruction), Social Network Webbing, next steps | Sort the top ten bold ideas before the group chooses the one it will carry forward. |
| Book (chapter 7): leadership team retreat | Wise Crowds and 15% Solutions, then 25/10, then Ecocycle Planning | Produce bold strategies for the whole group after each person has raised their concerns. |
| Book (chapter 7): summit of four hundred people | Open Space, then 25/10 | Produce and rank bold strategies for each region and for the country. |
| Site | 25/10 with Options Place, Purpose-to-Practice and Principles Walk-Around | Refine the ideas and identify the next steps. |
In the book, Wicked Questions helps evaluate and launch 25/10, User Experience Fishbowl combines with it and Open Space places it after its closing. The book also reports that a consultant combined 25/10 with Impromptu Networking, Troika Consulting and Conversation Café in a two-day course.
AI considerations
In our view, AI helps prepare the invitation beforehand and group the cards afterwards.
A language model proposes variants of the invitation adapted to the topic of the session. The facilitator keeps the two-part question: a bold idea, then a first step.
The model does not write the cards. According to the book, the structure produces results that are more likely to endure because the group draws them from within itself without imported advice. In our view, an idea generated by a model is imported advice. Nor does the model rank the cards in the group's place. The score means something only because colleagues gave it.
After the session, the model transcribes the photo of the wall of cards. It groups similar ideas and picks out the themes that recur in the top ten and in the others. At the analyst's request, it compares the list with the backlog or the requirements register. The group validates this grouping.
The cards sometimes name colleagues, clients or incidents. These are personal data within the meaning of the Federal Act on Data Protection (FADP, Art. 5 let. a). A cantonal administration falls under the cantonal data protection act. The facilitator masks the names on the photo before sending it to an external AI service.
Examples
The deliverable is the list of the ten ideas read out in the countdown and the first step of each. In this constructed case, thirty-two staff members of a cantonal tax administration answer the book's invitation applied to the online tax return.
| Score | Idea | First step |
|---|---|---|
| 25 | Pre-fill the return with the salary certificates that employers transmit | Ask three large employers in the canton for a test file of salary certificates |
| 24 | Accept supporting documents photographed with a mobile phone | Have ten volunteer taxpayers send photos of their supporting documents |
| 23 | Abolish the return for OASI pensioners with no other income or assets | Count these cases in last year's assessment |
| 23 | Answer questions by chat during the filing period | List the ten most frequent questions on the telephone helpline in March |
| 22 | Show the estimated tax during data entry | Measure with IT how long a simple case takes to calculate |
| 21 | Open the application to fiduciary firms with an electronic power of attorney | Invite two fiduciary firms to show how they enter returns today |
| 21 | Carry over the previous year's data | List the fields that rarely change from one year to the next |
| 20 | Offer the return in English | Count the calls in English received last year |
| 19 | Send an SMS reminder before the deadline | Ask the legal department whether the mobile number may be used for this |
| 19 | Publish two-minute videos on common deductions | Shoot a test video on the deduction for travel costs |
The two cards at 23 are read at the same call. When the facilitator calls 19, the list reaches ten ideas and the countdown stops. The other twenty-two cards stay on the wall below the top ten.
Visualisations
One diagram follows a card from the moment it is written to the countdown. It shows the front with the idea and the first step, the back with the five scores, then the ladder of scores that descends from 25 to the tenth idea. A second diagram shows a scoring round according to the book. The two published versions, the score calculation, the strings and the list of ten ideas fit in rows and columns.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Low | Write the invitation and the rating scale. Clear a room of its chairs. Cards, pens and a bell. |
| Execution | Low | 32 minutes according to the book. 22 to 25 minutes according to the site. The whole group works at the same time. |
| Documentation | Low | The cards posted on the wall and their photo. The list of the ten ideas with their first step. |
Tooling
Each participant receives an index card and a pen. A bell or another sound signal marks the end of each round. A visible timer times the 3-minute rounds. Sticky notes cover the back of the cards. In a large group, a microphone carries the voices of the people who read during the countdown. A wall or a roll of paper receives the cards after the countdown. A spreadsheet is enough to transcribe the list.
Sources
Henri Lipmanowicz and Keith McCandless created the 25/10 Crowd Sourcing structure. According to the book, improvisers such as Keith Johnstone inspired it. The book is published under a Creative Commons BY-NC-SA 3.0 licence. The site publishes the structures under a BY-SA 4.0 licence.
- Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of 25/10 Crowd Sourcing with its elements, purposes, tips, variations, uses and attribution (Field Guide, Part Four); the strings (chapter 6); the meeting of twenty-five leaders, the leadership team retreat and the summit (chapter 7); the stories of Diane Magrane and Craig Yeatman (Part Three); the cross-references from Wicked Questions, User Experience Fishbowl and Open Space.
- 25/10 Crowdsourcing, Liberating Structures: the online version with its timings, the minimum of fifteen participants, how a round runs without the discussion in pairs, the two-question closing, the advice on online use, its variations and the string with Options Place, Purpose-to-Practice and Principles Walk-Around.

