15% Solutions
15% Solutions is a meeting structure in which each participant names what they can do right away without extra resources or permission. Each person first draws up their list alone. They then present it to a small group. The group advises each participant in turn. Henri Lipmanowicz and Keith McCandless describe the structure in The Surprising Power of Liberating Structures (2013). They credit Professor Gareth Morgan with the inspiration. The book gives it 20 minutes. The authors' site states about 25 to 30.
Goal
15% Solutions is a meeting structure in which each participant looks for the actions they can take right away with the room for manoeuvre and the resources they already have.
The name comes from an idea of Gareth Morgan's. According to Morgan, most people control about 15% of their work situation. The remaining 85% depends on the context: the structures, systems, events and culture of the organisation. From this Morgan draws a way to change in small steps: "15-percent initiatives" whose effects snowball. Lipmanowicz and McCandless turned the idea into a meeting structure.
According to the book, the structure moves a group out of blockage, negativism and powerlessness. Each person discovers what they can do alone and with others. The solutions come from the ground up. The participants help one another. The authors add that these exchanges build trust and close the gap between what each person knows and what they do. The site links the structure to the principle "Amplify Freedom and Responsibility".
The structure gives each participant a list of actions they can take alone. Their peers have checked each action and added their advice to it. Each participant keeps their list. The book provides for a shared document in one case only. In an Open Space, the conveners' report carries the 15% Solutions.
The business analyst uses it at the end of a workshop where the participants have pinned a problem on others: the system, the regulations, management. The structure brings each person back to what they can change in their own work. After a retrospective or a root cause analysis, it yields actions that nobody needs to approve. You will find the full repertoire under Liberating Structures.
Usage
When to use it
- A group that waits for permission or gets bogged down in analysis: each person names what they can change without waiting.
- End of a workshop or a retrospective: each person leaves with actions they take on alone.
- A change that each person applies in their own work: each person names their share.
- A clarified purpose or a practice to stop: the book places 15% Solutions after Nine Whys or Creative Destruction.
- Conveners' report of an Open Space: the book has each person's 15% Solutions entered in it.
- Low-cost prototype: the book assembles small successes into a prototype that is simple to test.
- A group that meets regularly: open the session with the question from the book and the site: "What have you done with your 15 percent lately?"
- One-on-one conversation: ask a person who is stuck: "What is your 15% Solution?"
- Distributed team: according to the site, the structure works online without major adjustment.
When not to use it
- A problem that needs a budget or a decision out of reach: have the participants propose bold solutions that need resources. With groups of more than fifteen people, sort them with 25/10 Crowd Sourcing.
- A change that needs coordinated action from several teams: in our view, individual actions do not produce it. Prefer What I Need From You. The book uses it when a problem calls for strong cooperation across functions.
Description
The question
The facilitator first presents the problem: each participant's own or the whole group's. They then put the book's question: "What is your 15 percent? Where do you have discretion and freedom to act? What can you do without more resources or authority?"
The site opens the question with an assumption: "Let's imagine 85% of the solution is out of our control." The participants then look for the 15% they can act on without extra permission or resources. The figure is approximate. Morgan writes "about 15-percent".
According to the book, a clear common purpose and boundaries give coherence to the many 15% Solutions of a group. The facilitator therefore states the purpose and the boundaries before the question: the project scope, the deadline, what is already decided. The book and the site also advise them to tell the story of a small individual action that produced a big result.
What counts as a 15% Solution
A 15% Solution is an action that the person can take right away with the resources and authority they have. The book first advises checking each idea against this criterion. The site places this check in the coaching step: the group confirms that the person has the power to act.
The book speaks of actions "however small". It accepts that a participant may reinvent the wheel. Each 15% Solution shows the group what is possible. According to the authors, a small action can trigger big effects through the butterfly effect.
The ideas that fail the filter give themselves away by their subject. "Management should…" hands the action to someone else. "With one more position…" assumes a resource that the person does not have. In our view, a request passes the filter when it is itself the first step: writing to the manager to show them a figure. The action that waits for their answer does not pass.
The two published versions
The 2013 book and the site page describe the structure by the same elements: the question, the room layout, participation, group configuration, the steps and their timing. According to the book, the number of groups is unlimited. Everyone is included and has an equal opportunity to contribute.
| Element | Book (2013) | Authors' site |
|---|---|---|
| Question | "What is your 15 percent? Where do you have discretion and freedom to act? What can you do without more resources or authority?" | "Let's imagine 85% of the solution is out of our control." Then the search for the 15% to act on without extra permission or resources |
| Groups | Alone, then in groups of two to four | Alone, then in groups of two or three |
| Room and materials | Chairs, no tables needed | Chairs, no tables, paper for each person |
| Steps | List alone (5 min) · Sharing (3 min per person) · Consultation (5 to 7 min per person) | Introduction (1 min) · List alone (5 min) · Sharing (6 to 9 min) · Group coaching (11 min) · Plenary sharing (2 min) |
| Stated duration | 20 min | About 25 to 30 min |
Running the steps
Alone, each participant writes their list for 5 minutes.
At the sharing step, each participant presents their list to their group. The others listen. According to the book, each person speaks in turn for 3 minutes. The site gives the group of two or three 6 to 9 minutes.
At the consultation, the group works on one person at a time. The peers ask clarifying questions and give advice. The book counts 5 to 7 minutes per person. The site gives the group 11 minutes of coaching. It also has the group confirm that the person has the power to act. In our view, the peers also ask the person for their first step and the day they will take it. They also recast an idea beyond the person's reach into an action the person takes on themselves. In the hospital case, the analyst's group does this with her request for half a day per month.
The site ends with 2 minutes in plenary. A few participants share a solution that inspired them. They may ask permission before sharing it. The book stops after the consultation.
Duration by group size
The book states 20 minutes. Its own steps take longer because sharing and consultation are counted per person. For a group of n people, the session lasts 5 + 3n + (5 to 7)n minutes.
A pair takes 21 to 25 minutes. A group of three takes 29 to 35 minutes. A group of four takes 37 to 45 minutes. The site times each block for the whole group. Its steps add up to 25 to 28 minutes. It states about 25 to 30 minutes.
In our view, a facilitator who has only 20 minutes forms pairs and limits the consultation to 4 minutes per person: 5 + 6 + 8 = 19 minutes. In 20 minutes, groups of four have 3 minutes left for four consultations.
The authors' tips
The book advises asking for 15% Solutions at every meeting. Without this routine, they often go unnoticed. The site adds a question for consultants: "Where might you have indirect influence on people or groups?" The site also advises looking for ways to connect several solutions to a common purpose.
What makes 15% Solutions fail
A group that skips the check produces a list of requests addressed to others. The session then ends in the powerlessness it was meant to lift. The group checks each idea before it moves on to the next person.
In our view, the consultation drifts when the peers propose their own actions instead of working on those of the person they advise. Before the step, the facilitator reminds the group that the step works on this person's list.
In our view, a manager who collects the lists to track their execution changes the exercise. Each person then writes only what they are sure to deliver. The list stays with its author.
15% Solutions in a string
The authors combine several Liberating Structures into a string. In the strings of chapter 6, 15% Solutions moves each person to action on what the previous structure produced: ideas, strategies, drawings or a network map.
| String | Role of 15% Solutions | Book's goal |
|---|---|---|
| Creative Destruction (TRIZ in the book) · 1-2-4-All · 15% Solutions · Troika Consulting | Each person identifies what they can do right away. Troika Consulting then helps each person expand their 15% | Finding everyday solutions |
| Nine Whys · 1-2-4-All · 15% Solutions · 25/10 Crowd Sourcing | With 1-2-4-All, each person produces 15% Solutions they apply without extra resources, without detailed planning and without special approval. The participants then propose bold solutions that need more resources. In groups of more than fifteen people, 25/10 Crowd Sourcing sorts them | Finding everyday solutions |
| Drawing Together · 1-2-4-All · 15% Solutions · Troika Consulting | Each person names what they can do right away after the group has interpreted its drawings | Finding everyday solutions |
| Critical Uncertainties · Wise Crowds · 15% Solutions | With Wise Crowds, each person receives advice from several disciplines on how to implement the strategies | Unleashing local action |
| Nine Whys · Social Network Webbing · 15% Solutions · Troika Consulting | Each person decides what they can do right away to strengthen the group's network | Spreading innovation |
The book pairs the structure with Troika Consulting, Wise Crowds, Open Space, Helping Heuristics and Integrated~Autonomy. In Troika Consulting, each client can bring a 15% Solution to their two peers for coaching. The book's Field Guide also offers 15% Solutions as a follow-up to other structures. After Impromptu Networking, each person makes a simple plan to follow up on their encounters. After Wicked Questions, 15% Solutions and 1-2-4-All have the group generate ideas and then sift them. Conversation Café, Social Network Webbing and Integrated~Autonomy also use it to move into action.
AI considerations
A language model helps the facilitator frame the problem and its boundaries. The facilitator gives it the project context and asks it for several versions of the invitation. They keep the one that names the problem without suggesting an answer.
In our view, the opening story comes from the organisation. A generated story told as true deceives the room. The model can help shorten a real account.
The model can flag the ideas in a list that mention a budget, an approval or another team. The group decides. For example, the model cannot tell whether a head of department sets their team's working hours alone.
A list generated before the individual step gives everyone the same generic actions. The structure has each person name what they can do in their own job.
The lists often name colleagues or clients. These are personal data within the meaning of the Federal Act on Data Protection (FADP). An incident counts as personal data once a person can be identified from it. The participant removes the names before passing their list to an external AI service.
Examples
The deliverable is the personal list of one participant after the consultation. Each row carries an action they can take alone and its first step.
| Action | First step | What the consultation added |
|---|---|---|
| Send the workshop questions two days before the session | On Monday, write the five questions for the surgery workshop | The group advises keeping to five questions |
| Replace the three-hour workshop with two 45-minute sessions on the ward | Offer two time slots to the head nurse of surgery | The group checked that the analyst sets the format of her workshops alone |
| Have the minutes approved at the end of the session | Prepare the minutes template | The group advises projecting the minutes during the session |
| Show the director of nursing the time each head nurse spends in sessions | Record the length of each short session | Recast. The first version asked management to release each head nurse for half a day per month |
The consultation transformed the last row. Nursing management decides on the head nurses' time. The analyst can measure it alone. The group set aside the idea of hiring a liaison nurse: that post needed a budget.
Visualisations
One diagram places the ideas of the analyst in the example within her room for manoeuvre or outside it. A second diagram shows the duration of the steps by version and group size. The two published versions, the book's strings and the analyst's list fit in rows and columns.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Low | Frame the problem and its boundaries, choose a story, set out chairs in twos or threes. Paper for each person. |
| Execution | Low | 25 to 30 minutes according to the site. With groups of four, the book's steps take up to 45 minutes. |
| Documentation | Low | Each participant keeps their list. Nothing to consolidate. |
Tooling
Each participant has paper and a pencil. The facilitator displays the problem and the question. They keep time with a visible timer and announce the transitions with a bell.
Remotely, Zoom or Microsoft Teams provide the breakout rooms. Each participant writes their list in their own document. The chat or a collaborative whiteboard (Miro, Mural) receives the solutions shared in plenary. In a group that meets again, each participant keeps their list until the next session.
Sources
Henri Lipmanowicz and Keith McCandless designed 15% Solutions. The idea of the 15% comes from Gareth Morgan. The site publishes the structures under a BY-SA 4.0 licence.
- Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of 15% Solutions with its elements, purposes, tips, variations, uses and its attribution to Gareth Morgan (Field Guide), the one-on-one question (chapter 3), the strings and the signs of a need for local action (chapter 6), the use of What I Need From You for cooperation across functions (chapter 7), the follow-ups offered in other structures (Field Guide).
- 15% Solutions, Liberating Structures: the online version with its 85% assumption, its groups of two or three, its steps and their timings, how the group confirms that the person has the power to act, the plenary, the associated principle and online facilitation.
- Shawn Callahan, "Gareth Morgan's 15% concept", Anecdote, 2005: Morgan's text on 15% of control and 85% of context.

