Your Training Partner

Techniques Toolbox

Each guide covers one technique: what it brings, when to use it, how to run it and the mistakes most often made. Business analysis, project management, agile practice.

Knowledge area
Project phase
Performance domain
Topics
Sort

Three people linked to two roles, the two roles linked to three permissions and the direct arrow from a person to a permission struck through.
BABOK 10.39

Roles and Permissions Matrix

A roles and permissions matrix crosses a solution's functions with its roles to settle who may create, read, update, delete or approve.

Decision tree for routing a consumer-credit application: a root Amount requested, two branches (≤ CHF 15'000 and > CHF 15'000) each leading to a Debt ratio node, then four leaves: Automatic approval, Manual review, Manual review, Rejection.
BABOK 10.17b

Decision Trees

A decision tree maps a repeatable decision's rules as branches read from root to leaf. When to use it, how to build it, the pitfalls.

The Agile Extension's Value Model: three stacked bands, the people involved (key partners, strategic values, key rivals), costs and revenues, then the value customers stand to gain (key competencies, value proposition, key customers).

Value Modelling

Value modelling traces every solution decision back to the value it creates for a stakeholder named in the model: customer value = benefits minus costs.

The four purposes of a business visualization: the declarative versus exploratory axis crosses the conceptual versus data-driven axis, giving idea illustration, idea generation, everyday dataviz and visual discovery.

Business Visualizations

Business visualizations make an analysis result readable for a stakeholder: choosing the form, setting the axis scale, writing the title as a sentence.

A cantonal bank's map, read left to right: one quantified goal, three actors who can influence it, the behaviour expected of each and the deliverable that makes it possible. The counter-staff branch needs no code at all.

Impact Mapping

Impact Mapping links a quantified goal to the deliverables by naming the actors and the behaviour expected of each of them, on a one-page map kept up to date.

The Business Model Canvas filled in with the example of a scheduling tool for independent physiotherapists: nine blocks in the canonical layout, value proposition centred in orange, revenue streams in green.
BABOK 10.8

Business Model Canvas

The Business Model Canvas describes on one page how an organisation creates, delivers and captures value: the nine blocks, when to use it, the pitfalls.

NPV profile of two investment options: two downward-sloping net-present-value curves plotted against the discount rate, crossing zero at 12% for option A and 9% for option B, with a vertical line at the 8% hurdle rate to the left of both crossings.
BABOK 10.20e

Internal Rate of Return

The internal rate of return (IRR) is the discount rate that zeros a project's NPV, compared against the hurdle rate to decide whether it is worth the investment.

Routing guide among pro-versus-con analysis, force field analysis, the decision matrix, the analytic hierarchy process and multi-criteria decision analysis. The kind of question opens three branches: a single proposal to settle, rival options to compare, a decision already taken that still has to hold.
BABOK 10.16

Decision Analysis

Decision analysis: pick the right technique, from pro-versus-con analysis to force field analysis, then the decision matrix, AHP and multi-criteria analysis.

Orientation selector: a first question separates a single decision from several linked decisions. Several linked decisions lead to the decision requirements diagram. A single decision splits by the shape of its logic, between a decision table and a decision tree.
BABOK 10.17

Decision Modelling

Decision modelling makes repeatable business decisions explicit: choose between a decision table, a decision tree and a decision requirements diagram.

The interview cycle in three phases: Prepare, Conduct and Confirm. In Confirm, the notes go to the interviewee. An orange correction arrow returns from the interviewee into the notes, and only the note corrected that way feeds the confirmed findings.
BABOK 10.25

Interviews

The interview elicits in depth what one person holds. It needs a goal, an interview guide, a funnel of probes, consent and notes the interviewee has corrected.

A paper-prototyping session seen from above. The participant puts a finger on a sheet and thinks aloud, the facilitator hands over the task card, the human computer swaps the sheet and says nothing, the observer logs one problem per card. A loop runs from the finger to the swapped sheet, to the logged hesitation, to the sheet corrected in pen, then on to the next participant.
BABOK 10.36d

Paper Prototyping

Paper prototyping is a usability test: a real user operates an interface made of paper while one person plays the computer without saying a word.

Job story card "Tracking the deductible used", split into three labelled bands Situation, Motivation and Expected outcome. The Situation band is highlighted and carries the triggering moment, a non-urgent treatment proposed in November. The two bands below carry what the insured person is trying to find out and the date decision they want to make.

Job Stories

A job story states a need through the situation that triggers it: when, I want to, so I can. Format, elements, pitfalls and the gap with the user story.

Decision diagram for choosing the observation stance by objective: an objective of reasoning leads to active or facilitated observation, an objective of measurement leads to passive observation or to video reviewed with the participant; a cross-cutting contextual-inquiry band spans both branches, and an orange rule marks that the observer effect threatens measurement most.
BABOK 10.31

Observation

Observation elicits how work is really done: choose the active or passive stance by objective, measure without distorting it and stay clear of workplace …

Cone of uncertainty: a funnel narrowing from left to right as project definition grows from 0 to 100 %. At the wide mouth, on the left, the rough order of magnitude (ROM) with its widest band. At the narrow end, on the right, the definitive estimate with a tight band. The horizontal axis carries project maturity, the vertical axis the estimating error.
BABOK 10.19d

Rough Order of Magnitude (ROM)

A rough order of magnitude (ROM) is a single wide-band figure produced very early in a project to settle a go/no-go, before any detailed estimate.

Diagram of document analysis in five stages: inventory, triage on four criteria (relevant, current, authentic, credible), record in a six-column chart, reconcile, commit. The triage gate has a labelled reject exit, "discard, recording the reason", reconciliation fans out into three outcomes (duplicate, conflict, gap) and the gap loops back to the inventory as an arrow.
BABOK 10.18

Document Analysis

Document analysis elicits information from the documents an organisation already holds: four triage criteria, a six-column chart and the gap as a finding.

A wall of option cards covered with dots at uneven density, one card well ahead, a mid-tier cluster, cards with no vote at all, one card carrying three dots from a single voter and two tied cards joined by a bracket pointing to a second round.

Dot voting

Dot voting converges a workshop: each person places a fixed number of votes on the options and the count gives the short list. Rules, tie-breaks, pitfalls.

Context diagram of a commune handling a building permit application, in Gane/Sarson notation: a single process numbered 0, four external entities around it, the applicant and the land register on the left, the cantonal spatial planning office and the neighbours on the right. Seven named data flows connect them.
BABOK 10.13

Data Flow Diagrams

Data flow diagrams show where data comes from, what transforms it, where it rests and where it ends up, level by level.

Backlog refinement funnel: broad, rough items at the bottom, a refinement meeting in the middle that splits them and adds acceptance criteria, ready items at the top crossing the Definition of Ready into the planning workshop.

Backlog Refinement

Backlog refinement splits and details items until a team can finish them within one iteration: the refinement meeting, the readiness criteria, the cadence.

A kanban board with four capped columns, each carrying its WIP limit above the slots: To handle, Investigation, External appraisal, Decision and payment. The External appraisal column shows 2 of 2, its two slots occupied, one of them by a card marked blocked, so that no card from the upstream column can enter it.

Kanban board and WIP limits

The kanban board caps work in progress column by column: a free slot below the WIP limit is the only signal authorising the team to start one more task.

Funnel of a business simulation: two input variables described by range curves (volume drop, variable unit cost) and the selling price fixed at CHF 96 converge on a calculation model run over ten thousand draws, which produces on the right a histogram of the annual margin carrying the P10, P50 and P90 markers, the status-quo line and the marker for the point estimate at the 80th percentile.

Business Simulation

Business simulation draws thousands of value sets inside uncertain ranges, runs them through a model and returns a distribution read in percentiles.

Analysis chain of a card sort: the participants' raw sorts, the similarity matrix counting the card pairs filed together, then the dendrogram whose junction height marks the strength of the agreement.

Card Sorting

In card sorting, users group existing content themselves: the groups they form and the labels they give them are the basis of an information architecture.

Weighted pro versus con analysis of a fiduciary firm adopting Bexio: a Pro column totalling 12 (automated VAT invoicing 5, remote access 3, Swiss bank and FTA connector 4), a Con column totalling 9 (recurring subscription 3, data migration and training 4, vendor lock-in 2), balance 12 to 9 leading to adoption with a migration plan.
BABOK 10.16c

Pro versus Con Analysis

Pro versus Con Analysis weighs a single go/no-go decision in two columns of arguments. When to use it, how to weight it and how to avoid false balance.

Composition tree of the composite element Insured Party: the selection spans two whole branches, natural person against legal entity, and the connectors distinguish sequence, bounded repetition, optional and selection.
BABOK 10.12

Data Dictionary

The data dictionary fixes the definition, the format and the permitted values of every data element and the rule that composes them into composite elements.

The function Run the monthly payroll, drawn in IDEF0. Recorded hours and staff movements enter on the left. The Code of Obligations, the AVS/AI/APG rates, the LPP, the sector collective agreement, the withholding-tax scale and the employment contract come down on the top side. Salary statements, the payment order and the AVS statement leave on the right. The HR department, the payroll software and the fiduciary rise from the bottom.
BABOK 10.35d

IDEF / IGOE

IDEF0 bounds a function on four sides: what it consumes, what governs it, what it produces, what performs it. IGOE turns it into a one-box scope diagram.

A cone of uncertainty. The horizontal axis is information available, from almost nothing defined on the left to work decomposed and measured on the right. The cone is wide at ±50% on the left and narrows to ≤10% on the right. Seven estimation methods are placed along the axis by what they assume is known: rough order of magnitude, top-down and Delphi toward the left, parametric in the middle, PERT and bottom-up toward the right; rolling wave forms a band spanning the whole horizon.
BABOK 10.19

Estimation

Estimation sizes the cost and effort of work still to come: the seven BABOK methods and how to pick the one that fits what you know.

Product roadmap for a mobile banking application: four themes as rows, four quarters as columns, six bars of unequal width, one of them straddling the second and the third quarter and two on the fourth alone.

Product Roadmap

A product roadmap states the direction a product is taking: themes, each carrying a measured outcome, set out on the successive periods of a timescale.

Diagram of a non-functional requirement being transformed: a vague statement, 'the system must respond fast', becomes a measurable requirement broken into four pieces (metric, threshold, condition, source), then a verifiable acceptance criterion, under the banner measurable = testable = verifiable.
BABOK 10.30

Non-Functional Requirements Analysis

Non-functional requirements analysis turns each quality attribute into a measurable, verifiable threshold that replays as an acceptance criterion at test time.

The MVP loop: the problem and the hypothesis, the smallest set of features that puts it to the test, the release to early adopters, the measurement of learning, then the decision. Two arcs run back from the decision, one to the hypothesis when the measurement disproves it, the other to the set of features when it confirms it; a third exit leads to abandoning the option.

Minimum Viable Product (MVP)

A Minimum Viable Product (MVP) is the smallest released version of a product that tests a hypothesis with real customers. The measurement decides what follows.

BABOK's seven review types ordered from most formal to least, each cell marked on two questions, planned session and individual preparation by the reviewer. The single issue review answers yes to both, like the two other formal techniques.
BABOK 10.37c

Single Issue Review

The single issue review is the review of one issue: a formal, prepared session convened to settle that issue or to check conformance to a standard.

Four-level decomposition tree: one solution goal branches into two MMFs, only one decomposed further into four stories, of which only one descends to acceptance criteria, highlighted in orange.

Story Decomposition

Story decomposition: four levels from solution goals to acceptance criteria, worked breadth before depth, with splitting based on the value a customer can see.

Diagram of the fill mechanic: a budget ceiling of CHF 120'000 is fixed first; five requirements stack beneath it in decreasing value order up to CHF 118'000, leaving a margin of CHF 2'000; two further, lower-value requirements would exceed the ceiling and are deferred above the line.
BABOK 10.33c

Time Boxing and Budgeting

Time boxing and budgeting prioritize requirements by fixing a resource first, time or budget, then adjusting scope to fit within the limit.

BABOK's seven review types ordered from most formal to least, each cell marked on two questions, planned session and individual preparation by the reviewer. Desk check answers no to the first and yes to the second, exactly like the pass around.
BABOK 10.37e

Desk Check

A desk check hands a completed work product to a single reviewer who did not write it: one answer the author handles alone, with nothing to reconcile.

A target with three concentric rings. A goal is written in the centre. Initiative labels sit on the rings, the primary ring, the narrowest of the three, carrying only three of them.

Bullseye

Bullseye prioritisation works in a group: a goal at the centre, three rings, each item placed by its proximity. The narrow primary ring forces the trade-off.

Concept model fragment for health insurance: five noun concepts as boxes, linked by named verb concepts and the categorisation of a claim event into accident and illness.
BABOK 10.11

Concept Modelling

Concept modelling organises the business vocabulary: the noun concepts, the verb concepts that connect them and the definitions.

Loop diagram of the retrospectives: iteration 23, retrospective 23 with its three elements, iteration 24, then retrospective 24. A distinct arrow links the choice of actions of one retrospective to the review of previous actions of the next.

Retrospectives

The retrospective brings the whole team together at the end of each iteration to examine its process and settle on a few actions, each with a named owner.

An incoming batch of requirements is sorted into four fixed, labelled bins, Must have, Should have, Could have and Won't have this time. The Must bin takes at most sixty per cent of the effort; the Could bin takes about twenty per cent.
BABOK 10.33a

Grouping

Grouping sorts requirements into predefined priority bands. MoSCoW is its common form: four categories, effort balance and the pitfalls.

Portfolio board of a health insurer: five columns from idea to service, six initiatives under way as cards, two submitted requests waiting in the first column, the funding-case column at its limit of three and the core-system replacement stalled for two cycles in regulatory review.

Portfolio Kanban

Portfolio Kanban places each strategic initiative in the column of the milestone reached, with a written exit criterion and a WIP limit per column.

Two cumulative cash-flow curves starting at minus CHF 180'000 and rising toward the zero line. The undiscounted curve crosses it during the fourth year, the discounted curve crosses it later in the same year.
BABOK 10.20f

Payback Period

The payback period measures how long an investment takes to pay for itself: the cumulative flows, interpolation in years and months and its blind spots.

The same scores compared under two weight profiles. On the left, equal weights (0.25 for Cost, Compliance, Adoption and Security): the resulting ranking is A first, B second, C third, A winner. On the right, prioritised weights (Cost 0.20, Compliance 0.35, Adoption 0.15, Security 0.30): the resulting ranking is B first, A second, C third, B winner. Between the two, only the weights change: the ranking flips from A to B.
BABOK 10.16a

Decision Matrix

Decision matrix explained: simple and weighted scoring, how to set the weights, run a sensitivity check and avoid false precision.

Positioning diagram for process analysis: a chain of gaps, root causes, options leads to a methods node that forks toward SIPOC, labelled boundary and actors without time, and toward value stream mapping, labelled flow and time, value-add against waiting.
BABOK 10.34

Process Analysis

Process analysis examines an existing process to find its gaps, its waste and their causes before deciding what to improve.

A customer satisfaction against degree of fulfilment axis carrying three labelled curves. The performance line runs straight through the origin. The threshold curve climbs fast then plateaus below the neutral line. The excitement curve starts at neutral, stays flat, then rises sharply over the final third.

Kano Analysis

Kano Analysis sorts a product's candidate features into threshold, performance, excitement or indifferent, from two opposite questions put to the customer.

A force field on the move to a four-day week: on the left four driving forces as blue arrows toward the central line, scored 4, 3, 3 and 2, total 12; on the right four restraining forces as orange arrows, scored 4, 4, 3 and 2, total 13. The field tips slightly against the change, net −1.
BABOK 10.16b

Force Field Analysis

Force field analysis weighs driving forces against restraining forces around a change, to judge whether it will hold and which resistance to lower.

The expense-claim approval procedure drawn as a flowchart: the start oval leads to the parallelogram of the submitted claim, to the document symbol of the receipt, then to the line manager's check and to the decision diamond asking whether the amount is over CHF 1'000, with two exits, yes and no; the yes branch goes to the finance department, the no branch to the double-barred payroll sub-process, before the end oval.
BABOK 10.35a

Flowchart

The flowchart models a process as a sequence of steps and binary tests, in a symbol set where the shape of the box carries the meaning.

Capability map of a health insurer: three domains (Customer relationship, Products and underwriting, Compliance and risk) contain seven capabilities; Claims management opens onto three level-3 capabilities, the other six capabilities stay closed.
BABOK 10.6

Business Capability Analysis

Business capability analysis maps what an organisation is able to do, scores each capability on a few agreed dimensions and ranks the investment decisions.

Interface map: the payroll system of a Swiss SME at the centre, eight counterparties around it (AVS compensation fund, cantonal tax administration, accident insurer, Federal Statistical Office, bank, HR system, employee, accounting), one arrow per interface carrying its direction, its format and its frequency, with a single inbound arrow.
BABOK 10.24

Interface Analysis

Interface analysis catalogues the exchanges that cross a solution's boundary and specifies the contract of each one: format, frequency, error behaviour.

The ETL process in four stages: extraction pulls the data out of three source systems, with a branch between incremental and full extraction, then the staging area holds the batch and is the point a run restarts from. Transformation applies the rules declared by the data mapping; loading writes into the target repository, incrementally or by full replacement, and it produces the audit trail of the run.

Extract, Transform, and Load (ETL)

ETL pulls data out of several source systems, transforms it according to the business rules and loads it into a single target repository built for analysis.

Vertical chain of six why/because pairs starting from 160 of 500 processed applications that missed the 30-day deadline, descending to the highlighted root cause, an accountability for regulatory monitoring that no role holds, then on to the corrective action and its three-month deadline.
BABOK 10.40b

Five Whys

The Five Whys trace a problem back to its cause by chaining questions, down to a condition the organisation can fix, each link backed by evidence.

Onion diagram with four concentric rings around a Swiss health insurer's online claims portal: at the centre the delivery team, then the claims handlers, the customer service desk and the medical adviser, then general management, LAMal compliance and the legal department and in the outer ring the insured, the healthcare providers, the FOPH, the FDPIC, the cantons and the infrastructure host.
BABOK 10.43c

Onion Diagram

The onion diagram places each stakeholder in a ring by distance from the solution: who builds it, who lives with it, who surrounds it.

The eight stages of Kotter's change process laid out on a time axis and grouped into three phases: creating a climate for change (stages 1 to 3), engaging and enabling the organisation (stages 4 to 6), implementing and sustaining the change (stages 7 and 8). A curve follows the programme's momentum: it rises to the first wins of stage 6, then falls back at stage 7, victory declared too soon.

Kotter's change process

Kotter's change process leads a transformation through eight ordered stages, from establishing a sense of urgency to anchoring new practices in the culture.

Two options on one time axis: each has its own expiry, its last responsible moment marked just before it and its shaded zone where only the fallback remains.

Real Options

Real Options sets the timing of a decision: every choice still open gets an expiry and a last responsible moment, the point at which the commitment is made.

Distribution of responses to a survey's satisfaction question: five horizontal bars, from very satisfied to very dissatisfied, with the two positive answers grouped at 58% and a margin-of-error band of plus or minus 3.2% around that value.
BABOK 10.45

Survey or Questionnaire

A survey gathers structured responses at scale: response rate and margin of error decide whether the percentages hold up.

An orientation selector between the two studies. First question: is the operation already running and is it comparable? It routes to benchmarking. Second question: are market, segment or offer still to be chosen? It routes to market analysis. Below both, dashed: market analysis sets the target position, benchmarking measures the distance to cover.
BABOK 10.4

Benchmarking and Market Analysis

Benchmarking and market analysis: the two external studies BABOK v3 groups together, the test that decides which one to run and the way to combine them.

Two stacked cost bars comparing an on-site option with a subscription option over five years. Acquisition forms only one slice of each bar, maintenance and operation dominate the total.
BABOK 10.20a

Total Cost of Ownership (TCO)

Total cost of ownership sums an asset's expenses across its whole life cycle, from acquisition to disposal, well beyond the sticker price.

The TAM, SAM, SOM funnel for the Swiss e-bike market: three tiers narrowing from total addressable demand, about CHF 650m, to the market realistically obtainable within three years, about CHF 4m. Illustrative numbers, tiers not drawn to scale.
BABOK 10.4b

Market Analysis

Market analysis sizes the addressable demand, segments the buyers and maps the competition: a dossier of evidence for a strategic positioning decision.

BABOK's seven review types ordered from most formal to least, each cell marked on two questions, planned session and individual preparation by the reviewer. The informal walkthrough is the only one that answers yes to the first and no to the second.
BABOK 10.37d

Informal Walkthrough

In an informal walkthrough the author walks his draft through in front of a group and asks for feedback: the scribe's notes are all that comes out.

Routing diagram for root cause analysis. At the top, the problem statement with its measured effect, its magnitude, its location and its period. In the middle, the deciding question, is a single causal chain plausible and known. On the left, the fishbone diagram for several factors, in a facilitated session, by a breadth-first sweep. On the right, the Five Whys for a single chain, in a small group, with evidence at every link. An arrow links the diagram to the chain for the retained branch once the data is in. At the bottom, both paths converge on a verified cause and then on a corrective action with an owner, a due date and a measure.
BABOK 10.40

Root Cause Analysis

Root cause analysis: separating symptom from cause, verifying a candidate cause and choosing between the fishbone diagram and the Five Whys.

The six PESTLE families of factors converge on a two-criteria filter: the factor lies outside the organisation's control and can reach it. The factors that pass split into opportunities and threats, the external half of a SWOT analysis.

PESTLE Analysis

PESTLE analysis scans the external environment across six families of factors and delivers the register that feeds a SWOT's opportunities and threats.

Fishbone diagram of a health insurer's online sign-up funnel: the head carries the measured effect, an abandonment rate that rose from 18% in the October wave to 34% in the November one; the spine runs across the figure. Four diagonal bones carry the categories people, processes, tools and policies, with their primary and secondary causes, three of them marked as candidates for validation.
BABOK 10.40a

Fishbone Diagram

The fishbone diagram maps the possible causes of a measured effect by category and hands over the candidates that data then has to settle.

Chain of three panels: the data dictionary defines the element, data mapping declares which source attribute feeds which target attribute and under which rule, ETL executes that declaration. A fourth panel set apart, the data flow diagram, shows which process moves the data between which data stores.

Data Mapping

Data mapping declares, attribute by attribute, which source data feeds which target data and under which rule, before any migration or integration.

Value-cost plane: five features linked to the origin by rays, ranked from the steepest ray to the flattest, from rank 1 to rank 5.
BABOK 10.33b

Ranking

Ranking orders items into a strict 1-to-N sequence against a single criterion: when to use it, how to run it, its pitfalls and a worked numeric example.

BABOK's seven review types ordered from most formal to least, each cell marked on three questions, the third of which asks whether the technique's definition carries a follow-up stage on the rework: of BABOK's seven definitions, only one does, the inspection's.
BABOK 10.37a

Inspection

Inspection is the only one of BABOK's seven reviews whose definition carries a follow-up stage: it logs the defects and closes the loop on the rework.

Four assignments sit around one decision. The consulted are asked before it and their answer can still change it. The informed receive the outcome afterwards and send nothing back. A single accountable holds the decision; the responsible parties do the work.
BABOK 10.43e

RACI Matrix

The RACI matrix fixes who answers for each activity: the four letters, the single-A rule, the variants, the pitfalls and what it adds to a HERMES project.

One scenario's storyboard: four numbered panels, from the online application on day 1 to the card arriving by post on day 11, each carrying a sketch, the actor, the channel and the state the customer is left in, with the elapsed time drawn between the panels.
BABOK 10.36c

Storyboarding

Storyboarding lays a scenario out in ordered panels: the flow, the actors, the channels and the delays become inspectable before anything is built.

A focus group's discussion guide as a funnel: five stacked bands, opening 5 minutes, introduction 10 minutes, transition 10 minutes, key questions 50 minutes, ending 15 minutes, totalling 90 minutes. Each band carries a question from the health insurer study on posted paper invoices, and a side arrow marks the move from general to specific.
BABOK 10.21

Focus Groups

A focus group gathers the attitudes and the vocabulary of a segment: recruitment, a funnelled guide, moderation, analysis into themes and perspectives.

The chain of the four elements of a business case: the need tied to a business objective, the measurable desired outcomes set before any alternative, the assessment of the alternatives including do nothing on four axes (scope; feasibility; assumptions, risks and constraints; financial analysis and value) then the recommended solution, with a return arrow from the desired outcomes to the measurement of the delivered solution.
BABOK 10.7

Business Cases

A business case justifies a change: the need, desired outcomes, alternatives assessed including do nothing and the recommended solution, with a costed example.

Magic estimation line: seven item cards arranged by perceived size with no number shown, then the same line grouped into four clusters each given a scale value, 2, 3, 5, 13.

Relative Estimation

Relative estimation sizes the items of a backlog against one another, on a unitless scale of story points that velocity turns into iterations.

Five-column story map: the top row carries the themes of paying a QR-bill, linked left to right in the order of the customer's path; under each theme, stories stacked in decreasing priority; a horizontal line crosses the five columns and separates the first release from what waits.

Story Mapping

Story mapping arranges stories on two axes: the customer's path along the top, priority underneath. The map shows where the release line falls.

Horizontal pipeline read left to right: Measured driver multiplied by Rate calibrated on history gives Base estimate, then multiplied by Adjustment factor, then expressed as Estimate as a range. No numbers.
BABOK 10.19c

Parametric Estimation

Parametric estimation prices a cost or effort by multiplying a measured quantity by a rate calibrated on history: the model, the calibration and its pitfalls.

Geoffrey Moore's positioning template: six colour-coded fields that compose a single sentence, each labelled with what it commits to.

Product differentiation statement

The product differentiation statement fixes a product's target segment, category and competitive alternative in the six fields of Geoffrey Moore's template.

The quarterly OKR cycle: planning opens the cycle, the check-ins run through it, the review scores the key results, the retrospective examines the practice, then the loop reopens on the planning of the next cycle.

Objectives and Key Results (OKRs)

Objectives and key results (OKRs) pair a qualitative objective with three to five numeric key results, committed for a single cycle, then reset.

Cumulative gains chart: the horizontal axis carries the share of the population contacted from the top of the ranking, the vertical axis the share of responses captured; the concave curve sits above the random-selection diagonal and a marker shows the cutoff retained, 50 per cent of the population for 87 per cent of the responses.

Lift chart and cumulative gains chart

The lift chart and the cumulative gains chart rank a population by propensity and set how far down to contact: where the marginal decile stops paying.

Diagram of choosing an elicitation: a need opens onto three parallel columns, collaborative (direct interaction with stakeholders), research (systematic study of existing sources) and experiments (controlled test). The three converge on a single elicitation activity plan, from which an arrow leads to the confirmation of the results.
BABOK 4.2.2

Elicitation

Elicitation obtains information by three routes: interaction with stakeholders, study of existing sources and controlled test. How to choose.

The five resource categories, financial, physical, human, reputation and know-how, feed one dated inventory; the VRIN test splits that inventory into two outputs, the resources that establish no more than competitive parity and those that can carry an advantage.

Resource audit

A resource audit inventories what an organisation owns, in five categories, then tests each resource to say which of them can carry a competitive advantage.

Two parallel tracks starting from the same value attributes: one carries the acceptance criteria of a single solution and ends in a pass or a fail, the other the evaluation criteria of several solutions and ends in a value ranking.
BABOK 10.1

Acceptance and Evaluation Criteria

Acceptance and evaluation criteria state the conditions under which a solution is accepted and the scales on which several candidates are compared.

Ansoff Matrix grid of four quadrants: market penetration, product development, market development and diversification, with a deeper shade from penetration towards diversification.

Ansoff Matrix

The Ansoff Matrix crosses products and markets, existing or new, to name four growth directions and what each one forces the organisation to acquire.

Context diagram of the change-of-address declaration portal. The portal is a central bubble inside a dashed boundary marked in scope. Four external entities beyond the boundary: the resident, the identity provider AGOV or SwissID, the communal residents' register office and the payment provider. Six named flows cross the boundary: submitted declaration and acknowledgement of receipt to and from the resident, verified identity from the identity provider, validated notice to the residents' register, payment request and payment confirmation to and from the payment provider.
BABOK 10.41

Scope Modelling

Scope modelling draws the boundary of an initiative and decides what is in or out of scope before any work on requirements begins.

Current-state VSM map of a health insurer reimbursing an outpatient invoice: five processing steps each preceded by a queue, a sawtooth timeline setting 20 h of waiting against 23 min of processing, cycle efficiency 1.9%.
BABOK 10.34b

Value Stream Mapping (VSM)

Value stream mapping lays bare, on a single page, how much of a flow's elapsed time is spent queueing rather than creating value.

Two bars per year over four years: the nominal cash flow and, beside it, its shorter present value after discounting at 10%, the gap widening for distant years; the sum of the present values minus the outlay gives the NPV.
BABOK 10.20d

Net Present Value

Net present value (NPV) discounts an investment's cash flows and subtracts the outlay: a single CHF amount to decide by.

Three overlapping circles, data, narrative and visual: the three components of Brent Dykes's model. Each two-way overlap carries the artefact obtained when the third component is missing. Data and visual without narrative give a dashboard nobody explains, data and narrative without visual give a written report nobody reads through, narrative and visual without data give an illustrated opinion. Data storytelling occupies the central area common to all three.

Data Storytelling

Data storytelling combines a quantified finding, its visual and the narrative of the business context, so that a validated analysis reaches those who decide.

A case officer's window before and after a one-hour session: feedback from three colleagues pushes the vertical boundary to the right, self-disclosure pushes the horizontal boundary down, the open area grows on both sides with the total surface unchanged.

Johari Window

The Johari window sorts into four areas what a person knows about themselves and what others know about them, then moves the boundaries through feedback.

An example supplied by the business becomes a given, when, then scenario, from which three arrows lead to three simultaneous uses: the documentation the business reads, the acceptance criterion attached to the backlog item and the automated test replayed at every integration.

Behaviour Driven Development

Behaviour Driven Development states expected behaviour as given, when, then scenarios that the business can read and a tool runs unchanged as automated tests.

Three horizontal bars to scale comparing the cost of processing one supplier invoice: our organisation at CHF 14.20, the Swiss cohort median at CHF 9.80 marked as the first-cycle target and best-in-class at CHF 5.60, with a CHF 4.40 gap bracket linking our bar to the median.
BABOK 10.4a

Benchmarking

Benchmarking compares an organisation's performance against an external reference to turn the gap into a costed improvement target.

Functional decomposition of a Swiss health insurer's Claims management function: a four-level tree of uneven depth, node 1.1.3 lifted as a shared node and a stepped stopping line carrying the stopping rule.
BABOK 10.22

Functional Decomposition

Functional decomposition splits a function, a process or an outcome into analysable parts, under two contracts: exhaustive children and a single parent.

Balanced Scorecard diagram: a central Vision and Strategy node linked by arrows to four boxes, the Financial perspective, the Customer perspective, the Internal Business Process perspective and the Learning and Growth perspective. Each box carries its guiding question.
BABOK 10.3

Balanced Scorecard

The Balanced Scorecard turns a strategy into measurable objectives across four perspectives, linked to the financial result by a cause-and-effect chain.

Two proportional bars: the investment cost, CHF 45'000, is the reference; the total gross benefit, CHF 75'000, exceeds it, and the portion beyond the cost, CHF 30'000, set against the cost, is the ROI of 66.7%. No time axis.
BABOK 10.20c

Return on Investment (ROI)

Return on investment (ROI) sets net benefit against cost: a single, time-blind ratio for comparing options at a glance.

Order validation at a Swiss online retailer drawn as a UML activity diagram: after checking the stock, a guarded decision forks to reject the order when out of stock or to a fork bar that starts reserving the stock and taking the payment in parallel; the two branches meet at a join bar, the order object carrying CHF 1'250 flows through, then the order is confirmed and the activity ends at a bullseye.
BABOK 10.35c

UML Activity Diagram

Goal The diagram specifies, formally, how a use case is carried out inside a system: the order of the actions, the conditions that route the flow, the simultaneous …

Decision requirements diagram of the health-insurance premium subsidy (LAMal art. 65): the decision "Determine subsidy eligibility" (rectangle) consumes two input data, "Relevant income (CHF)" and "Household size" (ovals), through information requirements with a solid arrowhead; it rests on the "Cantonal subsidy scale" (rectangle with clipped top corners) through a knowledge requirement with a dashed arrow; and that scale draws its authority from the "Cantonal regulation on premium reductions" (document shape with a wavy base) through an authority requirement, a dashed line with a round head.
BABOK 10.17c

Decision Requirements Diagram

The decision requirements diagram (DRD) maps a complex business decision: sub-decisions, input data, business knowledge and the sources behind it.

The lifecycle of an item as a state machine: an admissibility review, then the states open, assigned, in progress, resolved and closed, with rejected and cancelled as branches. Seven states, three of them terminal. Escalation leaves the in progress state under the guard of a passed due date, crosses the four levels of the escalation matrix and returns the item to it.
BABOK 10.26

Item Tracking

Item tracking records every concern a stakeholder raises, gives it an owner, a due date and an agreed strategy, then carries it through to its closure.

Six panels answering the question "What decides?". Categories agreed in advance point to grouping, a strict order to ranking, a resource limit fixed in advance to time boxing and budgeting, an agreement between stakeholders to negotiation, a tally of votes to dot voting and proximity to a written goal to the bullseye. Each panel names the deliverable: labelled categories, an ordered list from 1 to N, a scope that fits under the ceiling, an agreed set, a ranked tally and rings from centre to edge. Grouping, ranking, time boxing and budgeting and negotiation are the BABOK's four approaches; dot voting and the bullseye are not among them.
BABOK 10.33

Prioritization

Prioritization determines the relative importance of business analysis information: six approaches, the deciding factor in each and how to choose between them.

BABOK's seven review types ordered from most formal to least, each cell marked on two questions, planned session and individual preparation by the reviewer. Pass around answers no to the first and yes to the second, exactly like the desk check.
BABOK 10.37f

Pass Around

A pass around puts one work product in front of several independent reviewers: it surfaces the disagreements, and the author reconciles them alone afterwards.

The increments of an evolutionary prototype: v0, v1, v2 and then production, each one passing through stakeholder use, which defines the next; an unbroken band runs under the whole chain, the quality floor (architecture, security, data protection, tests, operations), which starts at increment zero and carries the marker "paid here". The drawing shows no bin and no cleanup step anywhere.
BABOK 10.36b

Evolutionary Prototyping

Evolutionary prototyping grows the prototype into the delivered solution: there is no discard event, so the quality floor is paid from increment zero.

Kraljic quadrant crossing supply risk and impact on results, showing when a full vendor assessment is warranted.
BABOK 10.49

Vendor Assessment

Vendor assessment compares candidate suppliers on weighted criteria to ground a defensible sourcing decision.

The relationship between Insured Person and Policy drawn three times: as a Merise MCD, with cardinality 0,n written on the insured person side and 1,1 on the policy side; as a crow's-foot entity-relationship diagram; as a UML class diagram, where the same bounds read at the opposite end.

Merise

Merise models data in three stages, the MCD, the MLD and the MPD, with a cardinality written at the opposite end from the one crow's foot and UML use.

Gradient title card carrying the text: The seven review types.
BABOK 10.37

Reviews

Reviews: BABOK's seven types are chosen by fixing three settings, the objective, the participants and the formality, and the type reads off their intersection.

The hypothesis test sequence, the guide's seven steps grouped into five stages, cut by a vertical barrier: on the left, what is settled before the data is collected; on the right, what is calculated afterwards.

Hypothesis Formulation and Testing

Hypothesis testing turns a business belief into a claim data can refute, fixes the decision rule before the data is seen and says what the result supports.

The two faces of the Salaris box: the large front with the name, a tagline and four claims, two highlighted orange and tagged Customer; the small-print back listing the features, the first naming the payroll engine tagged Vendor.
BABOK 10.10a

Product Box

The Product Box is an elicitation game in which customers design the product's box, then sell it to the room and name the benefits that justify buying it.

CATWOE diagram in four concentric rings: Transformation at the centre, Customers and Actors on the inner ring, Weltanschauung on the middle ring, Owner and Environment on the outer ring.

CATWOE Analysis

CATWOE analysis tests a root definition against its six elements and brings out the rival worldviews that stakeholders hold about what a system is for.

Four boxes arranged around a central box carrying rivalry among existing competitors: threat of new entrants, threat of substitute products, bargaining power of suppliers, bargaining power of buyers. Four arrows pointing inward link the outer boxes to the central box.

Porter's Five Forces

Porter's Five Forces assesses an industry's profitability through rivalry, new entrants, substitutes and the bargaining power of buyers and suppliers.

Probability-impact matrix: the data-migration risk moves from a High cell to a Low cell, the arrow marking the effect of treatment.
BABOK 10.38

Risk Analysis and Management

Risk analysis and management catalogues an initiative's uncertainties, estimates their level and steers the responses through a risk register kept up to date.

BABOK's seven review types ordered from most formal to least, each cell marked on two questions, planned session and individual preparation by the reviewer. The formal walkthrough answers yes to both, like the two other formal reviews.
BABOK 10.37b

Formal Walkthrough

In a formal walkthrough, each reviewer examines the work product alone, several days before a session that consolidates the findings and appraises the product.

An e-banking payment under strong customer authentication, drawn as a UML sequence diagram. Four participants line up across the top: the Customer (actor), e-Banking, the Core banking system and the Authentication service, each extended by a dashed lifeline. The Customer submits the CHF 1'250.00 payment to e-Banking as a synchronous call with a filled head, which initiates the payment with the Core banking system, which requests strong authentication from the Authentication service. The challenge issued to the Customer, push or SMS, is an asynchronous message with an open head, highlighted in orange. An alt fragment separates two outcomes: on successful authentication, three dashed returns unwind to the confirmation to the Customer; on failed authentication, three symmetric returns unwind to the decline.
BABOK 10.42

Sequence Diagrams

The UML sequence diagram models the order of messages exchanged between the participants of a scenario. Notation, use and pitfalls for business analysis.

Backlog funnel: three described and estimated items at the top, short labels in the middle, unlabelled dots at the bottom, with a review arrow running back up.
BABOK 10.2

Backlog Management

Backlog management holds the ordered list of remaining work: what gets onto it, how the detail concentrates at the top, how an item is selected for delivery.

Top-down estimation diagram: a 400 person-day analogue, adjusted by a factor of 1.20, gives a 480 person-day total (CHF 576'000), apportioned by ratio into six components (Scoping 15%, UX/UI 10%, Back-end 30%, Front-end 20%, Integration 15%, Testing 10%).
BABOK 10.19a

Top-down Estimation

Top-down estimation prices the whole by analogy to a past project, then splits it across components by ratio: the method, the steps and its pitfalls.

The growth-share matrix of a non-life insurer: market growth rate on the vertical axis, relative market share on the horizontal axis, parity line at 1.0 and growth threshold at 6%. Top left the star, micromobility; top right the question mark, SME cyber insurance; bottom left the cash cow, private motor, by far the largest circle; bottom right the dog, legal expenses. The area of each circle follows premium volume.

Growth-share matrix

The growth-share matrix places a portfolio on two axes, market growth and relative market share, and reads off the cash role of every product from them.

Dependency chain of the six financial-analysis measures. On the left, total cost of ownership feeds the cost side of a central block, cost-benefit analysis, which carries the period-by-period cash-flow table. Four arrows leave it toward return on investment, net present value, the internal rate of return and the payback period, each labelled with the question that measure answers. Net present value and the internal rate of return are marked as discounting the flows.
BABOK 10.20

Financial Analysis

Financial analysis weighs up the viability of a project: which measure answers which question and why an investment case has to combine several of them.

The Delphi cycle in six steps: questionnaire, anonymous estimates, aggregation into a median and interquartile range, controlled feedback without the identities, revised estimates, then a stopping rule that starts a new round or delivers the converged estimate.
BABOK 10.19f

Delphi Method

The Delphi method turns expert judgement into a single estimate through anonymous questionnaire rounds with controlled feedback that converge on a consensus.

The identification sweep: seven source panels, charter and mandate, organisation chart, process map, system interfaces, legal and regulatory framework, contracts and agreements, snowballing, converge through seven arrows on a single panel, the stakeholder register. Each arrow carries the class of stakeholder its source is the only reliable way to surface, and two panels are highlighted, system interfaces and the legal framework, the two passes an internal workshop never makes on its own, the ones that surface the maintainer and the regulator.
BABOK 10.43a

Stakeholder List

The stakeholder list registers who is affected, in what capacity and with what authority: the attributes, the identification sweep, keeping it current.

A horizontal three-step arc, opening then exploration then closing, joined by arrows, with an orange 'Facilitator' band running beneath all three steps, a row showing the family's three artefacts and a green 'Harvest' box at the exit.
BABOK 10.10

Collaborative Games

Collaborative games surface a group's hidden assumptions: the game's three steps, the facilitator's role and how to choose the right game.

Use-case diagram of the self-service transport portal: the subscription holder, outside the boundary on the left, is linked to Renew a subscription and Buy a ticket; both cases include Make the payment, linked to the payment system on the right; Apply a discount voucher extends Renew a subscription, the arrow pointing at the base case.
BABOK 10.47

Use Cases and Scenarios

Use cases and scenarios: actors, goal levels, main flow, alternate and exception flows, UML include/extend notation and a Swiss worked example.

Three-branch diagram from one problem statement. The left branch, root cause analysis, descends towards candidate causes without changing the statement, down to a cause to correct. The centre branch, shaping, narrows the statement within the same context, down to a statement a method can be applied to. The right branch, reframing, moves the statement into another context, down to a non-analytical answer that becomes admissible.

Problem shaping and reframing

Problem shaping and reframing: refine a statement until it can be solved, then restate it in another context to open answers the first wording closed off.

The two phases of a brainstorming session: on the left the generation phase, a field of scattered notes under Osborn's four rules, no criticism, free-wheeling, quantity first, build and combine; a time limit separates the two halves; on the right the screening in three steps, discuss and evaluate, merge and de-duplicate, rate; an arrow entering from the top carries the evaluation criteria fixed before the session and reaches the first screening step; an outgoing arrow carries the condensed and rated list.
BABOK 10.5

Brainstorming

Brainstorming opens a broad or diverse set of options: Osborn's four rules, the two-phase session and screening against criteria set before the session.

Flow diagram: a population of live traffic, a random split toward control variant A and variant B, an outcome measured per arm, a statistical comparison and a verdict.

A/B testing

A/B testing measures a variant's real effect by splitting traffic at random between two versions, to decide on evidence which version to ship.

Graph of the relations a glossary resolves within a language. The label "assuré", marked rejected, runs out to two distinct concepts, Preneur d'assurance and Personne assurée: that is a collision, and it forces a split. The labels "participation" and "frais à charge de l'assuré" converge on the single concept Participation aux coûts: that is synonymy, and it resolves by election. That concept is the superordinate of Franchise, Quote-part and Contribution aux frais de séjour hospitalier.
BABOK 10.23

Glossary

A glossary fixes a domain's terms and their agreed definition: one preferred term per concept, synonyms routed to it, colliding labels split apart.

Two panels side by side: on the left a story card carrying its single sentence, on the right the same card surrounded by four items attached by the workshop, acceptance criteria, scenarios, a screen mock-up and an input and output table, plus a dashed arrow leaving the panel towards story decomposition.

Story Elaboration

Story elaboration: the just-in-time workshop that gives a story the detail, the examples and the acceptance criteria needed to deliver it.

The target profile and the observed level of a business analyst at a Lausanne health insurer, across five competencies: three bars reach the target, data analysis exceeds it by one level and negotiation with stakeholders stays one level below.

Competency framework

A competency framework sets out, for a role, the competencies expected and their observable levels, then measures the gap for each person assessed against it.

The Purpose Alignment Model: market differentiation on the horizontal axis, criticality to operations on the vertical axis and the quadrants Parity, Differentiating, Who Cares? and Partner, each with its own investment decision.

Purpose Alignment Model

The Purpose Alignment Model sorts a feature on two questions, differentiation and criticality; each quadrant carries its own investment decision.

Diagram showing exploratory data analysis as the gate between sourced data and two downstream techniques, hypothesis formulation and testing as well as data mining, with a return loop to the sourced data.

Exploratory Data Analysis

Exploratory data analysis questions a dataset with no prior hypothesis, to establish in nine steps what can be modelled from it and what can be tested.

Three-level AHP hierarchy for choosing project management software: the goal Choose the solution at the top, three criteria in the middle, Cost, Features and Support, each linked to three candidate options at the bottom.
BABOK 10.16d

Analytic Hierarchy Process (AHP)

The Analytic Hierarchy Process (AHP) weights criteria through pairwise comparisons and checks the consistency of the judgements. When and how to run it.

A prototype sits on the left. Two branches leave it in parallel, one upward and one downward. Neither leads into the other. The upper branch reaches the gate that asks what becomes of the artefact, and that gate opens onto two exits: thrown away to throw-away prototyping, grown to evolutionary prototyping. The lower branch reaches the gate that asks what someone does with the artefact, and that gate opens onto four exits: read to storyboarding, operated to paper prototyping, executed to simulation and modelled to process modelling. That last exit is drawn in grey, outside the family's band.
BABOK 10.36

Prototyping

Prototyping turns on two independent axes: what becomes of the artefact and what someone does with it. The routing between the family's five techniques.

State diagram of a claim's lifecycle at a Swiss insurer: the initial pseudostate leads to Received, which branches to Under assessment or Awaiting documents; Under assessment leads either directly to Accepted for small amounts, to Under expert review through a guarded transition carrying an action or to Rejected; Under expert review leads to Accepted or Rejected; Accepted leads to Settled; Settled and Rejected reach the final state.
BABOK 10.44

State Modelling

State modelling captures an entity's lifecycle: states, transitions, events and guards, initial and final pseudostates.

Negotiation run end to end: the stakeholders' initial positions, the interests made explicit behind them, the agreed objective criteria, then the single priority order on which they converge.
BABOK 10.33d

Negotiation

Negotiation-based prioritization reconciles divergent priority orderings into a single agreed order, with the recorded rationale for each trade-off.

Small UML class diagram of Swiss rail subscriptions: the Client class, with three compartments, is linked to the Subscription class by an association named 'holds' carrying the multiplicities 1 and 0..* at its ends; Subscription is the super-class of two sub-classes, GeneralSubscription and HalfFare, joined by a hollow-triangle generalisation pointing at Subscription.
BABOK 10.15b

Class Diagram (UML)

The UML class diagram models an object-oriented domain: three-compartment classes, attributes, operations, associations and multiplicities.

Mind map framing a municipal online-services portal: one central idea, six topics on single-keyword branches, a layer of sub-topics, colour reserved for risks.
BABOK 10.29

Mind Mapping

A mind map (mind mapping) arranges ideas around a centre. With no standardised format per BABOK, its readability rests on Buzan's discipline.

Vision statement of a health insurer set in large type, beneath the six-field positioning statement it is drawn from.

Visioning

Visioning states in one sentence the outcome expected from an initiative, who it matters to and the measures that show whether it is being approached.

The filing of the annual payroll declaration drawn in BPMN: two pools, the employer and the AVS compensation fund, exchange dashed message flows across the boundary, a timer carries the January deadline, a typed end event carries the rejection.
BABOK 10.35b

BPMN

BPMN models a collaboration between participants: a pool is a participant, only a message flow crosses its boundary and the model executes.

Diagram of the iteration review's three stages: the team demonstrates the increment, stakeholders discuss it and the product owner decides what enters the next iteration's backlog.

Iteration Review

The iteration review shows stakeholders a working increment of the solution and turns their feedback into decisions carried into the next iteration's backlog.

BABOK's seven review types ordered from most formal to least, each cell marked on two questions, planned session and individual preparation by the reviewer. Ad hoc review is the only cell answering no to both.
BABOK 10.37g

Ad Hoc Review

An ad hoc review is a peer's glance at a fragment of a draft: a few minutes, one bounded question and a corrected work product as the only trace it leaves.

Two concentric circles: an inner circle of seats with one open chair, an outer circle of observers and two arrows showing one observer entering and one participant leaving.
BABOK 10.10c

Fishbowl

The Fishbowl lets a small inner circle talk while an outer circle observes and records: geometry, the open chair and harvesting hidden assumptions.

A simulation run: five inputs (processes, scenarios, business rules, data, inputs) feed an executable model replicated twenty times, which returns measures carrying their intervals; a validation edge runs back from a year whose outcome is already known to the model, and it governs how the results may be read.
BABOK 10.36e

Simulation

Simulation executes a model of the process with its rules and its data, then measures what comes out: validation, replications, intervals.

Affinity map of a health-insurer portal: fifteen notes sorted into four named clusters, the Statements and reimbursements column being the fullest, plus a parking lot for two outlier notes.
BABOK 10.10b

Affinity Map

An affinity map groups dozens of scattered notes by resemblance and names the emerging themes, giving a group elicitation a readable structure.

Diagram of a spike: the backlog forks into the ordinary lane, from iteration work to the deliverable increment, and the spike lane, a box of fixed width carrying the goal and the type, which rejoins the backlog with an estimate.

Spikes

A spike is a time-boxed piece of research that makes a backlog item estimable: a defined goal, a type, a duration fixed in advance, no delivery.

SWOT grid of four cells on two axes: internal strengths and weaknesses, external opportunities and threats, favourable or harmful to the objective.
BABOK 10.46

SWOT Analysis

SWOT analysis maps strengths, weaknesses, opportunities and threats, then cross-pairs them into TOWS strategies to frame a strategic decision.

Functional org chart: an executive board above the IT department, which heads three units (Development, Operations and infrastructure, Support) through solid lines; a Finance business lead, tied by a solid line to the Finance department, is linked to the project by a dotted line marking a situational authority.
BABOK 10.32

Organizational Modelling

Organizational modelling maps roles, responsibilities and reporting lines in an org chart and above all the informal lines of influence it never shows.

User story card "Book a session online", split into three labelled segments Who, What and Why, the Why segment highlighted, followed by a subordinate "Acceptance criteria, Confirmation" band carrying two Given, when, then criteria.
BABOK 10.48

User Stories

A user story captures a need, who, what and why, with its acceptance criteria: the agile format for carrying a requirement on a backlog.

The routing of the 10.43 family: a single panel, the stakeholder list, carries the question who is concerned, in what capacity, with what authority, and four arrows leave it towards four panels, the stakeholder matrix which answers the question who weighs, the onion diagram which answers the question how close to the solution, the personas which answer the question who are we designing for, the RACI matrix which answers the question who answers for each activity. Each panel carries the name of the tool, its question and one abstract unlabelled shape, a four-cell square, four rings, a blank card, an empty grid.
BABOK 10.43

Stakeholder List, Map, or Personas

Stakeholder analysis in five tools, one question each: list, matrix, onion diagram, personas, RACI. Which one answers yours and in what order to take them.

One process shown at three levels: a context panel showing the whole process and its neighbours, an operational panel showing the fine-grained activities and their alternative paths, a system panel showing the sequence formalised for simulation or execution, joined by a downward arrow.
BABOK 10.35

Process Modelling

Process modelling maps how work flows. Choose the notation: flowchart, BPMN, UML or IDEF, by audience, formality and use.

Three panels linked by arrows. Decide and prepare: written, settled mandate, sponsor confirmed in person, invitees drawn from the stakeholder list, one or two sessions: internal first, then wider. Hold the session, in order: mandate and purpose first, people and roles, way of working, one working format, close. Leave with: mandate and criteria stated, responsibilities allocated, shared working rules, cadence and reporting rules, known risks listed, actions with a name and a date.

Kick-off meeting

The kick-off meeting opens a project: when to hold it, whom to invite, in what order to run it and what it has to leave behind on a single written page.

Six-phase CRISP-DM cycle: business understanding, data understanding, data preparation, modelling, evaluation, deployment, joined by back-arrows and by an outer loop that returns from deployment to framing; the business understanding, data understanding and evaluation phases are marked as belonging to the business analyst.
BABOK 10.14

Data Mining

Data mining finds the patterns that improve a decision made at volume. The business analyst frames the question and the cost of being wrong.

The same project schedule network shown three times: the baseline, then the network under a scenario applied to an activity with no float, where the finish date is pushed out by eight weeks, then under a scenario applied to an activity that has four weeks of float, where the finish date does not move.

What-If Scenario Analysis

What-if scenario analysis runs named conditions against the schedule network to see whether the promised finish date and the critical path survive them.

Three-panel cascade of a planning workshop: Strategy chooses one initiative among three candidates, CHF 480'000 for instant transfers; Initiative sequences three releases; Delivery is Sprint Planning, ending in a two-week sprint.

Planning Workshops

A planning workshop decides what a team will deliver over an agreed period: the what, then the how, at the three agile planning horizons.

Collapsed decision table for eligibility to a cantonal vocational-training grant: three binary conditions (resident in the canton, signed apprenticeship contract, household income below CHF 60'000), Unique hit policy marked U and four rules leading to Refused or Granted, the dashes marking don't-care conditions.
BABOK 10.17a

Decision Tables

Decision tables align a decision's rules in rows and columns: 2ⁿ completeness, consistency, don't-care collapse and DMN hit policies.

Two residual cloud shapes for a forecasting model: on the left errors centred on zero with a constant spread, on the right a fan opening as the predicted turnover grows.

Technical Visualizations

Technical visualizations test a model during the analysis: what the residual plot, the correlation matrix, the ROC curve and the silhouette plot show.

The same health-insurance domain at the three levels of the data model: a conceptual panel with three named entities, a logical panel with their attributes, identifiers and cardinalities written out in plain text, a physical panel with the typed tables of a database and the owner of each level.
BABOK 10.15

Data Modelling

Data modelling describes the structure of information: entities, attributes, relationships and cardinality, at the conceptual, logical and physical levels.

Push flow and pull flow compared on a three-station line. Under push, scheduling launches every station through a downward arrow and work in process piles up between them. Under pull, one orange arrow travels back from the assembly station towards the upstream station, labelled empty bin, 140 pieces, the only signal that authorises replenishment.

Kanban pull system

The Kanban pull system authorises production through a signal from downstream: the empty bin returned by the consuming station orders the replenishment.

Business rules taxonomy tree: the root, Business rule, splits into definitional rules (classification, computation), which can only be misapplied, and behavioural rules (obligation, prohibition), which can always be violated and carry a ladder of four enforcement levels, from strict enforcement to no active enforcement.
BABOK 10.9

Business Rules Analysis

Business rules analysis makes every rule explicit, atomic and testable and lifts it out of the process and the code that enforce it.

Anatomy of a SIPOC in five columns: Suppliers, Inputs, Process, Outputs, Customers, read left to right. The central Process column is a strip of five generic numbered steps, visibly capped at four to seven steps.
BABOK 10.34a

SIPOC

SIPOC frames a process on one page, five columns from suppliers to customers, before any detailed analysis. Fast, shared scoping.

Feasible region of a two-variable production plan. The axes give the number of Standard and Connected instruments. Three constraint lines, assembly, calibration and radio modules, cut out a grey polygon. A family of parallel objective lines slides up and to the right and touches the polygon one last time at the vertex 160 Standard and 80 Connected, marked CHF 43'200.

Optimisation

Optimisation computes the best decision under constraints: decision variables, objective function and limits gathered into a model that a solver solves.

Beta distribution curve for the data migration: optimistic 3 days on the left, most likely 5 days at the peak, pessimistic 13 days on the right with a long tail. The PERT expected value, 6 days, is marked by a vertical line to the right of the peak, pulled toward the pessimistic tail. A shaded band marks the standard deviation of 1.67 days on either side.
BABOK 10.19g

PERT

Three-point estimation (PERT) draws an expected value and a confidence interval from three values per task: the formula, the variance and its pitfalls.

A filled-in persona card: Nadia Perret, 34, self-employed, insured with a Swiss caisse-maladie. Three numbered goals with the first one in orange, her frustrations and preferred channel alongside and the research base (12 interviews, survey of 340 insured members) noted at the foot of the card.
BABOK 10.43d

Personas

Personas are research-based user archetypes: how to build them, which attributes separate behaviours and which pitfalls await the finished persona card.

Power/interest grid for the health-insurer case: power on the vertical axis, interest on the horizontal axis, four quadrants named after their strategy, keep satisfied top left, manage closely top right, monitor bottom left, keep informed bottom right; nine stakeholders are placed on it, executive management and the IT department in manage closely, the FOPH, the FDPIC and the medical adviser in keep satisfied, the claims handlers and the service providers in keep informed, the insured persons and the cantons in monitor.
BABOK 10.43b

Stakeholder Matrix

The stakeholder matrix positions every actor on power and interest and derives the engagement strategy: quadrants, method, pitfalls.

Lessons-learned loop. Six steps arranged in a clockwise ring: Milestone or close at the top, then Review of successes and problems, then Root cause, then Recommendation and owner at the bottom, then Knowledge base or backlog, then Start of the next project, which closes the loop back to the milestone. The ring carries two breaks marked in orange: between Review and Root cause, a finding recorded with no cause or owner; on the return arc into the start of the next project, a register written and then never reopened.
BABOK 10.27

Lessons Learned

Lessons learned: the closing review yields a lesson only when speech stays honest, which blame-free facilitation makes possible.

Physiotherapy-practice ERD in crow's foot notation. Four entities (Patient, Prescription, Session, Physiotherapist) in a star around the Session; each relationship shows a crow's foot (many) on the session side and a double bar (exactly one) on the patient, prescription and physiotherapist sides.
BABOK 10.15a

Entity-Relationship Diagram

The entity-relationship diagram (ERD) maps the structure of data: entities, attributes, identifiers and relationships annotated with cardinality.

Decomposition tree of a practice fit-out: the deliverable at the top branches into work packages, each leaf carries its measured amount, the amounts roll up the tree into a total, and a contingency-reserve line is added above it.
BABOK 10.19b

Bottom-up Estimation

Bottom-up estimation breaks a deliverable into work packages, prices each measurable leaf, then rolls the parts up into a traceable budget with a reserve.

A cash-flow table over a four-year horizon, from year zero to year four: three benefit rows totalling 25'000, 28'000 then 30'000 francs, two cost rows including an initial investment of 60'000 francs, a net benefit starting at minus 60'000 francs and a cumulative net benefit that turns positive during the third year to reach 32'000 francs by the end of the horizon.
BABOK 10.20b

Cost-Benefit Analysis

Cost-benefit analysis computes the net benefit of an investment: the cash-flow table, identifying the costs and benefits, the pitfalls and a worked example.

The workshop flow in three phases: Prepare, Conduct, Close and follow up. Around the Conduct phase are the roles (sponsor, facilitator, scribe, timekeeper, participants), and an orange 'validate against the goal' loop returns onto the Conduct phase.
BABOK 10.50

Workshops

A workshop brings key stakeholders into a framed, time-boxed session to produce a defined decision or deliverable, under a neutral facilitator with a scribe.

The seven-step frame: the weights, which express a value judgement, are fixed before the options are scored. The sensitivity loop returns to the weights when the ranking is fragile.
BABOK 10.16e

Multi-Criteria Decision Analysis (MCDA)

Multi-criteria decision analysis (MCDA) makes the trade-off between options explicit: weight the criteria, score the options, aggregate and test the ranking.

Timeline in two snapshots. At kickoff, delivery 1 over months 0 to 6 is drawn as fine dense blocks, bottom-up method, CHF 480'000 definitive at plus or minus ten percent, while deliveries 2 and 3 stay single blocks at a rough order of magnitude, CHF 600'000 and CHF 500'000 at plus or minus fifty percent. At the end of delivery 1 it comes in at CHF 552'000, fifteen percent above its estimate. An arrow runs from that actual to the two following deliveries, whose amounts are corrected by the same rate: delivery 2, now detailed, at CHF 690'000 definitive, delivery 3 at CHF 575'000 as a rough order of magnitude. The envelope goes from CHF 1'580'000 to CHF 1'817'000.
BABOK 10.19e

Rolling Wave Estimation

Rolling wave estimation prices the imminent delivery in detail and holds the rest at a rough order of magnitude, re-estimated at the end of each delivery.

Two blue entry arrows each carry their goal, their question and their completion criterion: exploration asks « what should be built? », it is done when the ambiguity is gone and produces a decision; experimentation asks « does the proposed design hold? », it is done when the proposal is judged adequate or inadequate and produces a verdict. Both enter a single box, the mock-up, of zero residual value by design, carrying the five omissions the discard licenses: no architecture, no error handling, no security, no persistence, no tests. A single green arrow leaves it, the knowledge gained, written down before the destruction, and it lands in the specification. An orange arrow runs down to a drawn bin: the artefact is destroyed on the day of the session itself, a planned destruction announced from the start.
BABOK 10.36a

Throw-away Prototyping

Throw-away prototyping builds an artefact in order to destroy it: zero residual value is the design goal, and that constraint buys the technique its speed.