
Pass Around
Goal A pass around puts several independent reviewers in front of the same text and reports what each of them read in it. A single reading has nothing to compare …

Goal A pass around puts several independent reviewers in front of the same text and reports what each of them read in it. A single reading has nothing to compare …

Goal The formal walkthrough is a formal technique: it uses the individual review and team consolidation activities often seen in inspection, and walkthroughs, BABOK …

Goal Throw-away prototyping settles an open question about what should be built, at the lowest cost and before the commitment. The team builds an artefact, puts it …

Goal Prototyping builds an early model of the final result, at a moment when correcting it still costs little. BABOK gives it four jobs: to elicit and validate needs …

Goal Paper prototyping establishes whether a chosen but not-yet-built design holds up on contact with a real user. The answer arrives in an hour, in the form of …

Goal Evolutionary prototyping exists to deliver a working solution while its requirements are still being discovered. The elicitation instrument is the real use of a …

Goal CATWOE analysis frames a human activity system before its content is discussed. It breaks that system into six elements and forces each one to be named: who …

Goal In a card sort, users group existing pieces of content into the categories that feel natural to them, then they name those categories. The method answers a …

Goal Elicitation serves to obtain the information the analysis will use, and its first decision bears on where that information comes from: which origin will yield …

Goal The technique produces a map, a grid whose horizontal dimension carries the sequence and the grouping of the product's main steps and whose vertical dimension …

Goal Story elaboration defines the detailed design and the acceptance criteria of a story, as needed to deliver a working solution. It works on one story at a time. …

Goal The Agile Extension to the BABOK Guide gives the technique this purpose: to express a solution's requirements at the level of detail that suits, aligned with …